Summary
Overview
Work History
Education
Skills
Languages
Additional Information
Timeline
Generic

Konrad Wozniak

Torquay,Devon

Summary

Versatile and driven individual with strong aptitude for problem-solving and teamwork, ensuring tasks are completed efficiently and to high standards. Proficient in operating various tools and machinery, coupled with effective communication skills to collaborate seamlessly with team members. Ready to contribute to the team.

Overview

10
10
years of professional experience

Work History

Multi skilled operative / pipefitter

EON Energy
Exeter, Devon
01.2016 - Current
  • Pipefitting along side welders
  • Operating heavy machinery
  • Installing district heating network to high quality
  • Adhered to all safety regulations during task execution.
  • Conducted health and safety checks, minimised workplace hazards.
  • Demonstrated commitment to team goals by sharing expertise and resources.
  • Engaged in continuous learning opportunities to increase skills set.
  • Followed detailed technical diagrams in assembly procedure executions.
  • Executed routine maintenance tasks, ensured smooth operation of machinery.
  • Prioritised daily tasks to meet project deadlines.
  • Maintained construction site cleanliness for enhanced productivity.
  • Ensured high-quality workmanship with regular tool inspections.
  • Coordinated heavy lifting operations to ensure safe material handling.
  • Delivered efficient service by performing multiple roles as required.
  • Manually loaded, unloaded and manoeuvred bulky goods, safely lifting and transporting heavy loads.
  • Utilised hand and power tools, including saws and grinders to shape and cut materials to strict specifications.
  • Replenished supplies to prevent downtime in production.
  • Used appropriate protective gear to minimise risk of injury.
  • Cut, threaded, and bent pipes to meet job specifications.

360 degree excavator operator

Celtic construction
Exeter, Devon
10.2014 - 01.2016
  • Enhanced job site productivity via proficient operation of hydraulic breakers and buckets.
  • Facilitated project completion with effective coordination with ground workers.
  • Loaded lorries efficiently, ensured seamless transport of dugout materials from sites.
  • Performed pre-operation checks to prevent equipment failures or malfunctions during work hours.
  • Achieved smooth excavation processes with careful operation of 360-degree excavator.
  • Ensured optimal machine performance through regular inspections and maintenance.
  • Reduced risk of accidents through vigilant adherence to health and safety protocols.
  • Coordinated with other operators for simultaneous multi-excavator operations on large scale projects.
  • Contributed to team efficiency by providing support in loading and unloading materials.
  • Operated heavy machinery, effectively executed construction tasks on time.
  • Followed blueprints meticulously to achieve desired excavation results.
  • Maintained clear communication lines with supervisors and team members to ensure proper understanding of task requirements.
  • Supported project timelines by working extra hours as needed during peak periods.
  • Executed digging and grading around live services.
  • Performed all work with maximum safety and efficiency.

Education

Electrical and mechanical

Technical College
Stargard

NVQ Level 2 - Plant Operations

CPCS
Exeter

Skills

  • Very motivated
  • Quick learner
  • Reading electrical diagrams and drawings
  • Some background and training in electrical and mechanical repairs
  • Pipefitting
  • Risk assessment compliance
  • Results-Driven approach
  • Empathy in interaction
  • Equipment handling
  • Time management efficiency
  • Technical proficiency
  • Electrical wiring
  • Repairs and installations
  • Machinery operation
  • Power tool proficiency
  • CSCS Card Holder
  • Health and Safety Compliance
  • Heating installation
  • Power tool expertise

Languages

Polish, English
Native

Additional Information

I'm highly motivated individual with good time keeping, problem solving, I'm very keen to learn, been within EON for nearly a decade, very good understanding of procedures and regulations, I'm trained intrusive authorised engineer within eon and had plenty of training: first aid, mental health first aid, hot works, confined space, gotcha rescue training etc.

Timeline

Multi skilled operative / pipefitter

EON Energy
01.2016 - Current

360 degree excavator operator

Celtic construction
10.2014 - 01.2016

Electrical and mechanical

Technical College

NVQ Level 2 - Plant Operations

CPCS
Konrad Wozniak