I've been in the industry 24 years. I'm a pipefitter by trade and completed an apprenticeship with NG baileys back in 2002, I worked on the agencies for 12 years until I ended up working for Rentec Ltd. Rentec were impressed with my skills, knowledge and ability to get the best out of people so they asked me to step up as a supervisor. I have been working in this role now for 10 years. Being a pipefitter i would say my expertise would be Plantroom Installations. Experienced and certified professional with expertise in heating & Chilled systems, Domestic services, External services, ventilation, and air source heat pump installation and maintenance. I gained an NVQ in Heating & Ventilation, SMSTS certification, and a JIB Supervisor Gold Card. Proficient in BS9251 sprinkler installation and maintenance, with additional qualifications including Unvented hot water, IPAF 3a & 3b, PASMA, and first aid certification valid until April 2027. Dedicated to delivering high-quality work while ensuring compliance with industry standards and safety protocols.
Main Contractor : London Land
Waterfront Poole Quay is a 280 luxury apartment complex based in Poole town centre. Mechanically and Electrically we have 43 men on site. I am one of 3 mechanical supervisors. I am overseeing a team of 10 men, and I'm responsible for the following....
- Installation of 8 x Air Source heat pumps which are the primary heat source with 2 x electric boilers as back up in LTHW plantroom.
- Installation of LTHW plantroom.
- Boosted cold water and CAT 5 break tank in the tank room.
- High level services BCWS, LTHW, MCWS, residential sprinkler and CAT 5 distributing to all 4 blocks risers.
- Above ground drainage (SVP's & RWP's) in car park using HDPE Geberit fusion weld.
- Ordering materials, planning ahead to make sure that productivity is continuous and targets are met.
- Giving estimates of time, materials and equipment required for successful completion of certain aspects of the job.
- Improved workplace safety to reduce accidents and near-misses.
- Safe starts every morning explaining todays tasks and any changes on site. Issuing the relevant permits.
- Supervised activities of workers and enforced safety regulations.
Main Contractor: Wessex Water
Monkey Island Estate is a 4 star hotel situated on a small island in the middle of the river Thames. I was tasked with the refurbishment of the 2 plantrooms.
Extremely complex system using the river water via heat exchangers to heat up or cool down (depending on the time of year) the glycol coming back from the water source heat pumps in each plantroom. The biggest challenge was that the hotel was still open to the public and still wanted hot water, heating and chilled.
I had to plan future works and communicate with the hotel manager to find out when it suited them for us to do a shutdown.
We installed new heating and chilled buffer vessels, hot water cylinders, pumps, heat exchangers, pressurisation units, expansion vessels and pipework (316 Stainless steel Mapress). The water source heat pumps were used as the primary heat/chilled source with air source heat pumps being used as a back up or if there was high demand.
I gained a lot more of an understanding of how heat pumps work and the parameters needed for them to work efficiently.
Main Contractor: Knights Brown
Portsmouth International Port, new extension onto existing port terminal. My duties involved overseeing the complete mechanical package which included....
- Seawater Plantroom: Using 2 x self priming Victor pumps to push the seawater through the 2 x heat exchangers which would warm up or cool down the glycol (depending on either heating or cooling demand) returning back to the water source heat pump in the main plantroom.
- Main Plantroom: Mitsubishi water source heat pump (primary heat source), 2 x Electric boilers (back up for heating), 2 x Daikin chillers, HTG buffer vessel, Chilled buffer vessel, pumps, pressurisation units, expansion vessels and Air handling unit.
- LTHW Heating: Serving UFH manifolds, radiators, overdoor heaters, fan coil units and AHU heating coil.
- Chilled Water: Serving fan coil units.
- Ventilation: Supply and extract to the building. Supply tempered air from AHU.
- Above Ground Drainage: SVP's & RWP's installed throughout building.
- Air Conditioning: This was subcontracted out.
The specification for this job was of a very high standard and checked thoroughly by the client on regular intervals.
Day to day duties included...
- Safe starts: Debriefing the guys on their tasks, any changes to site conditions, issuing relevant permits.
- Site meetings: Daily site meetings with other trades, main contractor and sometimes client.
- Sub contractors: Making sure their RAMS were suitable for purpose. Providing them with relevant drawings and access equipment.
- Materials: Looking ahead of the guys, ordering materials to maintain continuity of work.
- Progress reports: Documenting progress and areas we were being held up. Issuing delay notices.
Main Contractor: Spec Projects
Student Accomodation block, Coburg Street. 10 floors of small student flats complete with pre-built bathroom pods.
- BCWS c/w tank and booster pump in the plantroom.
- CPVC Sprinkler system c/w sprinkler tank and pump in plantroom. Zone valve for each floor.
- BCWS, HWSF & HWSR from plantroom distributing to multiple risers feeding each flat.
- Mechanical extract fan in each flat terminating at air brick via Supertube flat duct.
- Heating was all electric heaters in each flat.
Day to day duties included...
- Safe starts: Debriefing the guys on their daily tasks, notifying them of any change to site conditions/layout, issuing relevant permits
- Site Meetings: With all supervisors on site, reviewing progress, making sure there was no clashes with programmed works. Overcoming any issues.
- Sub contractors: Making sure their RAMS were suitable and relevant for the works carried out. Providing them with information and access equipment.
- Materials: Looking ahead, ordering materials to maintain continuity of work.
- Progress Reports: Documenting progress, highlighting areas we were being held up, issuing delay notices if necessary.
- NVQ level 2 in Heating & Ventilation
- SMSTS
- Installation & Maintenance of Air Source Heat Pumps
- JIB Supervisor (Gold Card)
- IPAF 3a & 3b
- PASMA
- BS9251 Code of practice Sprinkler Installation & Maintenance