Summary
Overview
Work history
Education
Skills
Websites
Timeline
Generic

OLATUNJI BABATOLA

Summary

I am a result-driven Project Planner & Scheduler with over 5 years proven experience in developing and managing integrated project schedules across complex engineering and construction environments. I have expertise in creating and maintaining contract-compliant programmes, developing Integrated Master Schedules (IMS), establishing contract-compliant baselines, and applying Critical Path Method (CPM), resource loading, and CTR principles to optimize project performance while meeting client expectations. I continuously monitor progress against baseline plans, focusing on critical and near-critical activities to proactively identify risks, mitigate delays, and implement effective recovery strategies. I work collaboratively with project managers, engineers, procurement teams, subcontractors, and logistics functions to coordinate activities, resolve issues, and ensure smooth project execution. My strengths include schedule analysis, progress tracking, change impact assessment, and producing clear, data-driven reports such as S-curves, bar charts, and network diagrams to support stakeholder decision-making. I actively contribute to planning reviews, quality processes, and milestone tracking, ensuring projects remain aligned with key gateways and delivery objectives. With a strong analytical mindset, I apply structured methodologies and engineering principles to solve complex planning challenges, ensuring compliance with industry standards and continuous improvement across project delivery.

Overview

13
13
years of professional experience

Work history

Project Planner /Schedule

PASI PROPERTIES LIMITED
2025.02 - 2026.03
  • Developed and maintained baseline and integrated project schedules for residential, commercial, and mixed-use property developments.
  • Created and structure Work Breakdown Structures (WBS) aligned with project scope, construction phases, and deliverables.
  • Defined activity sequencing, logic links, and durations using Critical Path Method (CPM) to identify and manage critical and near-critical activities.
  • Monitored project progress through regular updates, site feedback, and contractor reports, ensuring accurate reflection of actual performance.
  • Performed critical path analysis and proactively identify delays, constraints, and schedule risks, proposing mitigation and recovery strategies.
  • Produced lookahead programmes to support site execution and short-term planning activities.
  • Conducted schedule risk analysis and contribute to contingency planning to enhance programme certainty.
  • Integrated procurement schedules with construction programmes to ensure timely material and subcontractor availability.
  • Tracked milestones, deliverables, and key performance indicators (KPIs) to ensure projects remain on schedule.
  • Applied Earned Value Management (EVM) techniques to measure performance, identify variances, and forecast project outcomes.
  • Prepared and present progress reports, dashboards, and executive summaries to project managers and senior stakeholders.
  • Supported change management processes, assessing schedule impacts of variations and maintaining programme integrity.
  • Collaborated with project managers, site teams, consultants, and subcontractors to ensure alignment and coordination across all project phases.
  • Ensured schedules comply with contractual requirements, planning standards, and company procedures.

Project Planner/Scheduler

Pharmalogics Recruiting
2023.11 - 2025.12
  • Developed and maintained the integrated CQV schedule in Primavera P6, covering document preparation, Installation Verification (IV), Operational Verification (OV), Water Run, Development Run, and post-execution handover activities, fully aligned with GMP and project milestones.
  • Maintained logical sequencing between construction, automation, utilities, and CQV activities, ensuring prerequisite milestones such as Clean Room readiness, Mechanical Completion, WFI commissioning, and Process Air availability were correctly linked to CQV execution start dates.
  • Coordinated closely with commissioning Agents, Project Managers, superintendent and relevant stakeholders to validate system boundaries, confirm readiness criteria, and reflect realistic commissioning and qualification methodologies within the programme.
  • Tracked the integration points from construction to Mechanical Complete to CQV, document prep, IV and OV, Automation, close-out and Operational Readiness.
  • Updated the CQV schedule and issued regular look-ahead programmes to support execution and milestone assurance.
  • Regulated Pharmaceutical

Data Center Project Planner/Scheduler

Construction Hunters
2021.01 - 2023.11
  • Created and optimized Primavera P6 schedules across hyperscale data centre campuses.
  • Developed full lifecycle project plans integrating engineering, construction, and commissioning deliverables.
  • Presented schedule dashboards and reports to senior leadership.
  • Integrated sub-contractors and suppliers' programme of work in the overall project programme while communicating changes.
  • Monitored sub-contractors and suppliers' plans and progress reports; intervened and expedited as necessary to keep their work on schedule.
  • Assisted project manager in developing/reviewing cost and schedule corrective action and recovery plans and making sure needed actions/plans are implemented.
  • Tracked progress, monitored critical activities, updated project schedules, and followed up with responsible managers where delays are anticipated.
  • Attended planning review meetings with multifunctional discipline representatives and ensured all required supports are identified as well as ensuring all parties are aligned and informed about project status and progress.
  • Generated project reports, providing analysis of the critical path using MS excel or Visio as required by the project manager or client. Produced visual aids to help explain the project progress and update on CTR using bar charts, S curves and network diagrams.
  • Contributed to evaluating changes to the baseline and the implications of proposed changes to the scope of works, ensuring it passes through the appropriate change process and revising project plans to reflect the agreed changes.

Associate Project Planner

NNPC Engineering & Technical Company Ltd
2018.11 - 2021.01
  • Prepared baseline schedules aligned with contract milestones.
  • Developed and updated Primavera P6 schedules incorporating approved changes and EVM principles.
  • Analysed progress systems, PERT networks, and reporting procedures.
  • Coordinated with procurement for early delivery of long-lead items.
  • Prepared daily, weekly, and monthly progress reports.
  • Evaluated extension-of-time (EOT) claims and integrated approved changes into the program.

Construction Site Personnel

ULDA
2017.02 - 2018.11
  • Supervised construction operations ensuring safety, quality, and adherence to designs.
  • Coordinated subcontractors and labour teams.
  • Managed site materials, logistics, and equipment.
  • Delivered classroom and practical training on plumbing, safety, and site management.
  • Developed lesson plans, assessments, and conducted toolbox talks.

Assistant Quality Control

Tasty Time Manufacturing Co.
2012.11 - 2017.02
  • Performed daily product sampling, routine testing, and water analysis.
  • Ensured compliance with production quality and safety regulations.
  • Maintained shelf-life documentation and collaborated with QC management.

Education

BSc - Science Laboratory Technology & Biochemistry

Ekiti State University

Skills

  • Primavera P6 (Advanced)
  • Microsoft Excel
  • Critical Path Analysis (CPA)
  • Schedule Integration
  • Baseline Development & Change Control
  • Activity Coding and Resource Loading
  • Earned Value Management (EVM)
  • Schedule Risk Analysis
  • Time Impact Analysis (TIA)
  • Delay & Compensation Event Support
  • Resource & Cost Loading
  • Executive Reporting & Dashboards
  • Project Planning and Controls
  • Collaborative Teamwork
  • Remote Work Proficiency
  • Primavera P6
  • MS Project
  • Excel
  • Risk Tools (Safran Risk, PRA)
  • SharePoint
  • Microsoft 365
  • AWS Cloud Practitioner Certification — 2024
  • PMP

Timeline

Project Planner /Schedule

PASI PROPERTIES LIMITED
2025.02 - 2026.03

Project Planner/Scheduler

Pharmalogics Recruiting
2023.11 - 2025.12

Data Center Project Planner/Scheduler

Construction Hunters
2021.01 - 2023.11

Associate Project Planner

NNPC Engineering & Technical Company Ltd
2018.11 - 2021.01

Construction Site Personnel

ULDA
2017.02 - 2018.11

Assistant Quality Control

Tasty Time Manufacturing Co.
2012.11 - 2017.02

BSc - Science Laboratory Technology & Biochemistry

Ekiti State University
OLATUNJI BABATOLA