Summary
Overview
Work history
Education
Skills
Affiliations
Timeline
Generic

Martin Milligan

Elgin,Moray

Summary

Highly skilled scaffolding professional with extensive experience in suspended scaffolds building, materials handling, and fall prevention techniques. Demonstrates exceptional rigging expertise, adaptability in diverse conditions, and proficiency in equipment operation supervision. Adept at scaffold design, on-site communication, and the use of hand tools. Proven track record in systems scaffolding construction, fall protection, and mentoring apprentices. Strong capabilities in structural analysis, workplace cleanliness, and rolling scaffold assembly. Experienced in working at heights with a focus on customer relations and team leadership. Proficient with AutoCAD for construction planning and scaffold inspection. Holds a valid CSCS Card with advanced knowledge of tube and clamp scaffolding, power tools, safety compliance, and emergency response training. Committed to health and safety compliance with a strong work ethic and physical stamina.

Driven and capable, excel in teamwork and problem-solving, with significant experience in construction and safety protocols. Adaptable and quick to learn new techniques, demonstrating strong physical stamina and attention to detail. Aim to contribute to project success by ensuring safe and reliable scaffolding solutions.

Offering strong foundational skills and keen willingness to learn and grow in scaffolding industry. Knowledgeable about safety protocols, teamwork, and basic construction principles.

Confident Advanced scaffolder experienced in erecting and dismantling commercial and domestic constructions. Follows site policies for good safety, security and compliance. Physically fit to meet manual labour demands.

Overview

19
19
years of professional experience
17
17
years of post-secondary education

Work history

Advanced Scaffolder

Northscaff
Elgin, Moray
2024.04 - Current
  • Assisted in adapting project timelines by responding to changing site requirements with scaffold designs.
  • Facilitated team coordination through effective communication and collaboration.
  • Supported the construction of temporary structures such as stairways and walkways within scaffolding systems.
  • Contributed to team knowledge by delivering training sessions to less experienced staff.
  • Upheld high professional standards in all interactions with clients, colleagues, and supervisors.
  • Constructed complex scaffold platforms to support heavy loads during construction activities.
  • Implemented risk management strategies whilst erecting, altering, or dismantling scaffolds.
  • Adapted quickly to different environments, applying appropriate scaffolding techniques as required.
  • Improved site productivity by delivering timely and reliable scaffolding solutions.
  • Supported other tradesmen to access hard-to-reach areas using well-designed scaffold structures.
  • Demonstrated expertise in assembling scaffolding systems for various building projects.
  • Complied with health and safety regulations to minimise work-related accidents on site.
  • Maintained quality control for optimal stability and security in all scaffold structures.
  • Facilitated safe working conditions by regularly inspecting scaffolds for defects or wear.
  • Ensured safety by strictly adhering to scaffolding erection standards.
  • Assisted with dismantling procedures, ensuring minimal material waste and damage.
  • Supervised junior scaffolders, fostering skill development and adherence to safety protocols.
  • Contributed towards successful project completions through effective teamwork and dedication towards job responsibilities.
  • Utilised a variety of tools and equipment for efficient scaffold assembly and disassembly tasks.
  • Worked efficiently to help teams complete construction projects ahead of deadlines.
  • Carried out all scaffolding duties adhering to strict health and safety regulations for optimal staff wellbeing.
  • Followed directions, drawings and project specifications to enforce adherence to requirements.
  • Utilised PPE on site to prevent accidents.
  • Transported materials using hauling and hoisting equipment.
  • Applied critical thinking skills to solve problems and address challenges.
  • Demonstrated proactive approach to learning new techniques and technologies.

Scaffolder

Stork
Dyce, Aberdeen City
2024.01 - 2024.04
  • Assembled scaffolding structures for building renovation projects.
  • Enhanced team morale with strong communication and cooperative skills.
  • Tended to minor repairs on scaffold components, extending their lifespan.
  • Demonstrated high level of physical stamina for prolonged manual work.
  • Ensured safety on site by strictly adhering to health and safety guidelines.
  • Collaborated effectively with various teams to ensure smooth operations.
  • Managed dismantling processes for safe and efficient site clearance.
  • Ensured proper alignment during scaffold installation, resulting in stable structures.
  • Facilitated building maintenance by erecting secure scaffolds.
  • Improved operational efficiency by properly storing tools after use.
  • Maintained strict adherence to industry regulations whilst executing each task.
  • Used protective gear at all times, promoting a culture of safety awareness amongst the team members.
  • Dismantled scaffolding after project completion.
  • Unloaded scaffolding equipment at construction sites, monitoring areas for risks.
  • Applied critical thinking skills to solve problems and address challenges.
  • Adhered to health and safety practices at all times to reduce risk of injury.
  • Utilised PPE on site to prevent accidents.
  • Cleaned up sites after shifts, organising tools and securing supplies in designated storage units.
  • Followed directions, drawings and project specifications to enforce adherence to requirements.
  • Secured and assembled scaffolding in line with established project scope.
  • Handled material transportation in safe working manner.

Scaffolder

Bilfinger
Dyce, Aberdeen City
2023.07 - 2024.01
  • Demonstrated high level of physical stamina for prolonged manual work.
  • Ensured proper alignment during scaffold installation, resulting in stable structures.
  • Tended to minor repairs on scaffold components, extending their lifespan.
  • Maintained strict adherence to industry regulations whilst executing each task.
  • Used protective gear at all times, promoting a culture of safety awareness amongst the team members.
  • Increased productivity by maintaining clean and organised work areas.
  • Ensured safety on site by strictly adhering to health and safety guidelines.
  • Improved operational efficiency by properly storing tools after use.
  • Enhanced team morale with strong communication and cooperative skills.
  • Collaborated effectively with various teams to ensure smooth operations.
  • Carried out all scaffolding duties adhering to strict health and safety regulations for optimal staff wellbeing.
  • Dismantled scaffolding after project completion.
  • Applied critical thinking skills to solve problems and address challenges.
  • Adhered to health and safety practices at all times to reduce risk of injury.
  • Utilised PPE on site to prevent accidents.
  • Cleaned up sites after shifts, organising tools and securing supplies in designated storage units.
  • Followed directions, drawings and project specifications to enforce adherence to requirements.
  • Secured and assembled scaffolding in line with established project scope.
  • Actively participated in safety briefings and adhered to all safety protocols on job sites.
  • Executed assigned duties with attention to detail and accuracy.
  • Demonstrated proactive approach to learning new techniques and technologies.
  • Completed building work at heights using scaffolding, reach equipment and strapping to climb structures.
  • Observed safety procedures while working at heights.
  • Dismantled wooden and metal scaffolding upon job completion.
  • Performed construction work on chimneys, spires and tall structures.
  • Climbed tall structures to complete skilled repairs and routine maintenance.

Scaffolder

Speyside Scaffolding
Charleston of Aberlour, Moray
2016.09 - 2023.07
  • Increased productivity by maintaining clean and organised work areas.
  • Demonstrated high level of physical stamina for prolonged manual work.
  • Tended to minor repairs on scaffold components, extending their lifespan.
  • Ensured safety on site by strictly adhering to health and safety guidelines.
  • Maintained strict adherence to industry regulations whilst executing each task.
  • Used protective gear at all times, promoting a culture of safety awareness amongst the team members.
  • Improved operational efficiency by properly storing tools after use.
  • Facilitated building maintenance by erecting secure scaffolds.
  • Collaborated effectively with various teams to ensure smooth operations.
  • Installed temporary roof scaffolds to facilitate weatherproof construction procedures.
  • Performed regular equipment inspections, ensuring optimal performance throughout projects.
  • Assembled scaffolding structures for building renovation projects.
  • Enhanced team morale with strong communication and cooperative skills.
  • Carried out all scaffolding duties adhering to strict health and safety regulations for optimal staff wellbeing.
  • Dismantled scaffolding after project completion.
  • Unloaded scaffolding equipment at construction sites, monitoring areas for risks.
  • Worked efficiently to help teams complete construction projects ahead of deadlines.
  • Applied critical thinking skills to solve problems and address challenges.
  • Adhered to health and safety practices at all times to reduce risk of injury.
  • Handled scaffolding activities on new-build housing projects to support project safety.
  • Utilised PPE on site to prevent accidents.
  • Maintained adequate supply of scaffolding materials and equipment.
  • Cleaned up sites after shifts, organising tools and securing supplies in designated storage units.
  • Followed directions, drawings and project specifications to enforce adherence to requirements.
  • Secured and assembled scaffolding in line with established project scope.
  • Actively participated in safety briefings and adhered to all safety protocols on job sites.
  • Executed assigned duties with attention to detail and accuracy.
  • Demonstrated proactive approach to learning new techniques and technologies.
  • Supported team in troubleshooting and resolving technical issues.
  • Transported materials using hauling and hoisting equipment.
  • Erected scaffolding at building sites, helping crews safely reach target locations of building exteriors and interiors.
  • Completed building work at heights using scaffolding, reach equipment and strapping to climb structures.
  • Assembled temporary metal and wooden scaffolding on building sites.
  • Observed safety procedures while working at heights.
  • Climbed tall structures to complete skilled repairs and routine maintenance.

Army soldier

British Army
Edinburgh, Lothian
2007.11 - 2016.07
  • Upheld strict discipline standards, cultivated a professional military environment.
  • Operated advanced military technology equipment; streamlined data collection processes.
  • Conducted regular equipment checks for optimal operational efficiency.
  • Maintained high personal fitness levels, meeting stringent army requirements consistently.
  • Participated in multiple international deployments to enforce peacekeeping mandates.
  • Improved safety measures with rigorous adherence to the Army's standard operating procedures.
  • Enhanced team morale by providing leadership and direction in high-pressure situations.
  • Developed tactical plans for deployment, enhancing combat effectiveness significantly.
  • Ensured timely completion of missions due to efficient communication within the team.
  • Liaised with local communities during humanitarian assistance operations; fostered positive relations between civilians and military personnel.
  • Assumed responsibility for sensitive materials; maintained integrity and confidentiality at all times.
  • Responded to emergencies with speed, coherence and knowledgeable assistance.
  • Secured buildings, rooms and perimeters whilst minimising exposure times.
  • Patrolled designated coverage areas and evaluated terrain for defensive use.
  • Administered first aid and followed basic lifesaving procedures in emergency situations.
  • Performed fire team member duties during situational training exercises.
  • Remained composed and focused in highly stressful situations.
  • Trained in combat and weaponry to meet field demands.
  • Followed instruction to complete exact requests of senior officers.
  • Operated weaponry and communication systems.
  • Prepared for military action with short notice.
  • Maintained weaponry and equipment to meet combat requirements.
  • Represented military unit professionally at ceremonial events and occasions.
  • Acted quickly and effectively in emergency response situations, providing reliable aid.
  • Completed required administrative practices to set standards.

Education

Scottish Qualifications Certificate - Mathematics

Elgin Academy
Elgin, Moray
2003.08 - 2006.12

Scottish Qualifications Certificate - English

Elgin Academy
Elgin, Moray
2003.08 - 2006.12

Scottish Qualifications Certificate - Modern Studies

Elgin Academy
Elgin, Moray
2003.08 - 2006.12

Scottish Qualifications Certificate - Physical Education

Elgin Academy
Elgin, Moray
2003.08 - 2006.12

Scottish Qualifications Certificate - Art

Elgin Academy
Elgin, Moray
2003.08 - 2006.12

Skills

  • Suspended scaffolds building
  • Materials handling knowledge
  • Fall prevention techniques
  • Rigging expertise
  • Adaptability in different conditions
  • Equipment operation supervision
  • Scaffold design understanding
  • On-Site communication
  • Use of hand tools
  • Systems scaffolding construction
  • Fall protection expertise
  • Mentoring apprentices
  • Structural analysis capabilities
  • Workplace cleanliness
  • Rolling scaffold assembly
  • Working at heights experience
  • Customer relations
  • Team Leadership
  • Hand-eye coordination
  • Proficient with AutoCAD
  • Construction planning
  • Strong work ethic
  • Scaffold inspection
  • Emergency response training
  • Valid CSCS Card
  • Tube and clamp scaffolding
  • Power tool proficiency
  • Advanced scaffolding
  • Safety compliance
  • Slung scaffolds
  • CSCS Card Holder
  • Physical stamina
  • Effective team work
  • Task prioritisation
  • Traffic management
  • Material loading and unloading
  • Dependability
  • Health and safety adept
  • Rigging techniques
  • Working at height
  • Base plate assembly
  • Special design structures
  • Heavy lifting
  • Excellent hand-eye coordination
  • Truss out scaffolds
  • Rope and hoist operation
  • Materials management
  • Superb time management
  • Hoisting equipment operation
  • Cantilever scaffolds
  • System scaffolding
  • Tower scaffold construction
  • Technical understanding
  • Suspended scaffolds and access equipment
  • Birdcage scaffolds
  • Excellent communicator
  • Customer service-oriented
  • Use of manual tools
  • Resourcefulness in troubleshooting
  • Time efficiency
  • Critical evaluation
  • Site cleanliness
  • Initiative taking
  • Safety consciousness
  • Equipment maintenance understanding
  • Resilience under pressure
  • Craftsmanship pride
  • Health and Safety Compliance
  • Equipment Maintenance

Affiliations

  • Golfing
  • Running
  • Football
  • Walking

Timeline

Advanced Scaffolder

Northscaff
2024.04 - Current

Scaffolder

Stork
2024.01 - 2024.04

Scaffolder

Bilfinger
2023.07 - 2024.01

Scaffolder

Speyside Scaffolding
2016.09 - 2023.07

Army soldier

British Army
2007.11 - 2016.07

Scottish Qualifications Certificate - Mathematics

Elgin Academy
2003.08 - 2006.12

Scottish Qualifications Certificate - English

Elgin Academy
2003.08 - 2006.12

Scottish Qualifications Certificate - Modern Studies

Elgin Academy
2003.08 - 2006.12

Scottish Qualifications Certificate - Physical Education

Elgin Academy
2003.08 - 2006.12

Scottish Qualifications Certificate - Art

Elgin Academy
2003.08 - 2006.12
Martin Milligan