Summary
Overview
Work history
Education
Skills
Generic

Shaun Goodwin

Chesterfield,Derbyshire

Summary

Driven and reliable professional known for strong problem-solving skills and teamwork. Demonstrates solid competency in safety protocols and physical stamina, ensuring reliable and secure scaffold constructions. Ready to contribute to project success and safety in role.

Overview

24
24
years of professional experience

Work history

Advanced scaffolder

Rilmac
Lincoln, Lincolnshire
2001.10 - 2025.06
  • Installed complex scaffolding structures ensuring compliance with safety regulations.
  • Supervised teams of scaffolders providing guidance and support throughout projects.
  • Conducted regular inspections of scaffolding equipment maintaining high safety standards.
  • Coordinated with project managers to ensure timely delivery of scaffolding solutions.
  • Evaluated and selected appropriate scaffolding materials based on project requirements.
  • Resolved on-site issues promptly ensuring minimal disruption to project timelines.
  • Demonstrated expertise in assembling scaffolding systems for various building projects.
  • Assisted with dismantling procedures, ensuring minimal material waste and damage.
  • Created robust temporary structures such as stairways and walkways within confines of scaffolding system.
  • Contributed towards successful project completions through effective teamwork and dedication towards job responsibilities.
  • Implemented risk management strategies whilst erecting, altering, or dismantling scaffolds.
  • Complied with health and safety regulations to minimise work-related accidents on site.
  • Supported other tradesmen to access hard-to-reach areas using well-designed scaffold structures.
  • Constructed complex scaffold platforms to support heavy loads during construction activities.
  • Supervised junior scaffolders, fostering skill development and adherence to safety protocols.
  • Achieved high levels of efficiency with meticulous planning and preparation before construction.
  • Adapted quickly to different environments, applying appropriate scaffolding techniques as required.
  • Ensured safety by strictly adhering to scaffolding erection standards.
  • Upheld high professional standards in all interactions with clients, colleagues, and supervisors.
  • Enhanced project timelines by rapidly responding to changing site requirements with flexible scaffold designs.
  • Worked efficiently to help teams complete construction projects ahead of deadlines.
  • Carried out all scaffolding duties adhering to strict health and safety regulations for optimal staff wellbeing.
  • Dismantled scaffolding after project completion.
  • Unloaded scaffolding equipment at construction sites, monitoring areas for risks.
  • Handled scaffolding activities on new-build housing projects to support project safety.
  • Adhered to health and safety practices at all times to reduce risk of injury.
  • Utilised PPE on site to prevent accidents.
  • Supported team in troubleshooting and resolving technical issues.
  • Observed safety procedures while working at heights.
  • Used hand tools, power tools and heavy equipment to demolish existing building structures.

Education

GCSEs - English, Maths Science, German, P.E, Woodwork

The Bolsover School
Bolsover
06.2000

Skills

  • Complex scaffold installation
  • Safety compliance management
  • Project coordination
  • Material evaluation
  • On-site issue resolution
  • Scaffold assembly techniques
  • Temporary structure creation
  • Risk management strategies
  • Health and safety adherence
  • Teamwork facilitation
  • Project efficiency enhancement
  • Adaptability in environments
  • Construction support structures
  • Mentoring apprentices
  • Scaffold design understanding
  • Workplace cleanliness
  • Use of hand tools
  • On-Site communication
  • Working at heights experience
  • Fall prevention techniques
  • Equipment operation supervision
  • Fall protection expertise
  • Structural analysis capabilities
  • Crane signalling
  • Suspended scaffolds building
  • Customer relations
  • Team Leadership
  • Advanced scaffolding
  • Tube and clamp scaffolding
  • Advanced mathematics
  • Valid CSCS Card
  • Emergency response training
  • Strong work ethic
  • Scaffold inspection
  • Hand-eye coordination
  • Safety compliance
  • Heavy lifting
  • Working at height
  • Task prioritisation
  • scaffold erections
  • Health and safety adept
  • Customer service-oriented
  • Truss out scaffolds
  • Dependability
  • Birdcage scaffolds
  • Superb time management
  • Traffic management
  • Excellent communicator
  • Cantilever scaffolds
Shaun Goodwin