

Professional Ground Worker with extensive experience contributing to all stages of construction projects. Reliably meets strict deadlines and communicates well with multidisciplinary teams. Follows health and safety procedures, taking measures to mitigate on-site risks.
SSSTS Certified
3 Day First Aid at Work Certification
Confined Space (low risk)
BDS Certification
360 above/below 10T with lifting ops/ quick hitch: NPORS
FT Dumper: CPCS
Ride On Roller: CPCS
Rear DumpTruck (rigid/tracked/ above and below 10T) 360 Slew (restricted) NPORS
Telescopic Handler upto 9 Metres (restricted) NPORS
• Soil Strip/ Ground Stabalisation
• Working with contracted Piling Rigs
Bund Construction around piler and muck away
• Coffeedam piling construction
Executed trench boxing, Manhole boxing and open cut trenching to ensure efficient site preparation. Performed lifting and dragging of manhole boxes to facilitate installation processes. Completed concreting of manhole sleeves to enhance structural integrity.
• Executed deep drainage construction to 9 metres depth for foul pumping station and rising main beneath Wiltshire Swindon & Oxford Canal.
• Executed manhole construction alongside all related pipework, ensuring benching and formation to level
•Executed concrete formwork and steelwork to ensure structural integrity. Performed concrete pouring with brushed finish for enhanced durability.
Executed reconstruction and new construction of Wiltshire Swindon & Oxfordshire Canal. Recycled blue clay to adjust moisture content effectively. Compacted and shaped materials to meet project specifications.
All associated groundworks from curb laying, edging, concreting, stoning to level, car park construction.
Operated Bomag 120 and Bomag 16t to ensure efficient site operations. Utilised Tellihandler for material handling and transportation. Managed 360 excavators above and below 10 tonnes for diverse tasks. Handled Forward Tipping Dumpers of six, nine, and ten tonnes for effective site management.
Multi pile croping and blinding for concrete shuttering
• Executed construction of eighteen metre flood weir at Sanbeck Park lake for Earl of
• Scarborough alongside restoration of Capability Brown's lake wall.
• Developed bunded cell and pads for drilling rigs at fracking site
• Executed Cut & Fill operations to prepare sites for construction. Implemented ground stabilisation techniques to enhance soil integrity. Completed sealing processes to protect surfaces from moisture and erosion.
• Executed bunded stone construction, ensuring proper compaction and precise cutting to shape. Maintained adherence to specifications for bunded stone construction processes.
• Comprehensive cell lining of 4-acre bunded site
• Executed interceptor tank and holding tank installation alongside all associated pipework.
Executed cofferdam construction with six metre excavation, followed by precise deconstruction and backfilling. Ensured all activities conformed to technical specifications and safety standards.
• Operated Bomag 219 to execute precise drainage installations. Executed deep drainage pipeline laying with attention to structural integrity.
• Executed trench box construction, facilitating safe excavation practices. Performed lift and drag operations to enhance project efficiency. Implemented safety measures during trench box assembly to mitigate risks.
• Open cut trenching to five metres
600 preformed manhole bases and manhole assembly to complete lvl
• 2100 concrete stormwater pipe installations and related manhole construction and compacted backfill
• Back laying of runs and positioning of precast headwalls
• Executed large-scale formwork construction for 300mm concrete ground slabs. Installed double-layered steel work with precise fixing techniques. Applied floated and brushed finishes to enhance surface quality.
• Newly Established Biogas Facility
• All necessary groundworks ranging from drainage to mass concrete application for bunded storage area
• New Build Warehouse Distribution Centre
• All associated drainage, manhole construction, interceptor tank, soak aways and reinstatement
• New Construction Warehouse Distribution Centre
• Executed drainage installation and mass concrete pouring for multiple projects.
• Completed construction of 300mm pans with associated steelwork and tie wiring. Achieved float finish as per project specifications.
• Butlins Minehead : Demolition of old chalet blocks and New Build 4 Block chalets
• All associated deep drainage working to lvls, Manhole and Trench Box construction and deconstruction
• Middlesbrough : Outdoor Velidrome Construction
• Deep Drainage on New Housing Build
• All associated drainage works. Manhole Construction, Benching and finishing to steel lvl.
• Large diameter Ductile Pipelaying on Severn Trent Reservoir site
• A46 road widening Newark to Windmerpool
• Storm drainage construction to finish lvl. All associated pipework, Manhole construction, reinstatement.
• Storm holding pond construction and headwall construction
• Road widening stone construction, compaction to finish lvl
• Stoke Bardoff Sewarge upgrade
• Ductile Pipelayer, multi diameter construction runs and all associated works to finish lvl
• Rutland Water New Overspill Lagoon Construction
• New dig and fill laggoon Construction, Stabilisation and Compaction
• Bank construction and stabilisation
• Earthworks/Ground Stabalisation
• Working with Piling Rigs, bund formation and muck away
• Croping piles to lvl, waste away
• New Build Hospital
• All associated groundworks. Curb Laying, Pipelaying, Manhole Construction, Road crossings, Reinstatement. Road and Car Park stone construction to lvl
• Pile Cropping
• Roughing instalation for electrical/fibre optic cables
• Cable pulling and laying
• A1 Road Widening
• Soil Stabilisation, Batter Construction, Stone Road construction to lvl
Supply of labour to Farming Industry. Planting/Crop Harvesting
• Roustabout, construction/ dismantling of pipe stands for Drill Floor
• Underground Inbye Haulage of all relevant materials to inbye coal face rip