Summary
Overview
Work history
Education
Skills
Generic
Gary Lumley

Gary Lumley

Lincoln Road,Skellingthorpe

Summary

Professional Ground Worker with extensive experience contributing to all stages of construction projects. Reliably meets strict deadlines and communicates well with multidisciplinary teams. Follows health and safety procedures, taking measures to mitigate on-site risks.

SSSTS Certified

3 Day First Aid at Work Certification

Confined Space (low risk)

BDS Certification

360 above/below 10T with lifting ops/ quick hitch: NPORS

FT Dumper: CPCS

Ride On Roller: CPCS

Rear DumpTruck (rigid/tracked/ above and below 10T) 360 Slew (restricted) NPORS

Telescopic Handler upto 9 Metres (restricted) NPORS

Overview

43
43
years of professional experience

Work history

Groundworker/Dumper Driver

Kier
West Burton, Lincolnshire
08.2008 - 12.2025

• Soil Strip/ Ground Stabalisation

• Working with contracted Piling Rigs

Bund Construction around piler and muck away

Deep drainage Pipelayer

FOX (Owmby) Ltd
Swindon, Wiltshire
06.2023 - 07.2025

• Coffeedam piling construction

Executed trench boxing, Manhole boxing and open cut trenching to ensure efficient site preparation. Performed lifting and dragging of manhole boxes to facilitate installation processes. Completed concreting of manhole sleeves to enhance structural integrity.

• Executed deep drainage construction to 9 metres depth for foul pumping station and rising main beneath Wiltshire Swindon & Oxford Canal.

• Executed manhole construction alongside all related pipework, ensuring benching and formation to level

•Executed concrete formwork and steelwork to ensure structural integrity. Performed concrete pouring with brushed finish for enhanced durability.

Executed reconstruction and new construction of Wiltshire Swindon & Oxfordshire Canal. Recycled blue clay to adjust moisture content effectively. Compacted and shaped materials to meet project specifications.

All associated groundworks from curb laying, edging, concreting, stoning to level, car park construction.

Operated Bomag 120 and Bomag 16t to ensure efficient site operations. Utilised Tellihandler for material handling and transportation. Managed 360 excavators above and below 10 tonnes for diverse tasks. Handled Forward Tipping Dumpers of six, nine, and ten tonnes for effective site management.

Multi pile croping and blinding for concrete shuttering

Drainage groundworker

FOX (owmby) Ltd
Felixstowe , Suffolk
08.2023 - 10.2023
  • Executed groundwork preparation in alignment with blueprints, significantly enhancing accuracy of final output.
  • Uphold high standards of workmanship while complying with stringent safety guidelines.
  • Exhibited physical endurance while executing manual labour in diverse weather conditions without sacrificing work quality.
  • Conducted comprehensive surveys to devise precise drainage solutions
  • Established groundwork tasks, ensuring solid foundations for subsequent construction activities.
  • Removed sagging brick block work caused by heavy dockside loads. Formed concrete haul roads to improve transportation efficiency. Executed all associated reinforced steel work and finishing to specifications.

Pipelayer

FOX(owmby) Ltd
Ayelsbury, Buckinghamshire
04.2021 - 05.2023
  • Executed construction of Ayelsbury South East Link Road, integrating drainage solutions and cut-and-fill techniques. Conducted archaeological dig and scrape to preserve historical artefacts during construction.
  • Dug trenches following blueprints for accurate pipeline installation.
  • Collaborated with team members to enhance workflow coordination.
  • Operated 360-degree excavator above and below 10 tonnes for efficient site management. Utilised tracked dumper for transporting materials across challenging terrains. Executed tasks with 10-tonne forward tipping dumper to enhance material handling efficiency.

Multi Skilled Groundworker

FOX(owmby) Ltd
Maltby, South Yorkshire
04.2020 - 04.2021

• Executed construction of eighteen metre flood weir at Sanbeck Park lake for Earl of

• Scarborough alongside restoration of Capability Brown's lake wall.

Multi Skilled Groundworker

FOX(owmby) Ltd
Misson & Tinker Lane, Nottinghamshire
10.2017 - 02.2019

• Developed bunded cell and pads for drilling rigs at fracking site

• Executed Cut & Fill operations to prepare sites for construction. Implemented ground stabilisation techniques to enhance soil integrity. Completed sealing processes to protect surfaces from moisture and erosion.

• Executed bunded stone construction, ensuring proper compaction and precise cutting to shape. Maintained adherence to specifications for bunded stone construction processes.

• Comprehensive cell lining of 4-acre bunded site

• Executed interceptor tank and holding tank installation alongside all associated pipework.

Executed cofferdam construction with six metre excavation, followed by precise deconstruction and backfilling. Ensured all activities conformed to technical specifications and safety standards.

Multi skilled Pipelayer/Bomag Driver

Kier/Bam Hinkley Point C
Bridgewater, Somerset
10.2016 - 09.2017

• Operated Bomag 219 to execute precise drainage installations. Executed deep drainage pipeline laying with attention to structural integrity.

• Executed trench box construction, facilitating safe excavation practices. Performed lift and drag operations to enhance project efficiency. Implemented safety measures during trench box assembly to mitigate risks.

• Open cut trenching to five metres

600 preformed manhole bases and manhole assembly to complete lvl

• 2100 concrete stormwater pipe installations and related manhole construction and compacted backfill

• Back laying of runs and positioning of precast headwalls

• Executed large-scale formwork construction for 300mm concrete ground slabs. Installed double-layered steel work with precise fixing techniques. Applied floated and brushed finishes to enhance surface quality.

Multi skilled Groundworker

Sole Trader
Bilsthorpe, Nottinghamshire
05.2016 - 12.2016

• Newly Established Biogas Facility

• All necessary groundworks ranging from drainage to mass concrete application for bunded storage area

Multi Skilled Groundworker/Dumper/Bomag driver

Russell Construction- Manchester
Bilsthorpe, Nottinghamshire
01.2015 - 05.2016

• New Build Warehouse Distribution Centre

• All associated drainage, manhole construction, interceptor tank, soak aways and reinstatement

Multi skilled Groundworker

Avatar Construction
Sutton in Ashfield , Nottinghamshire
10.2015 - 10.2015

• New Construction Warehouse Distribution Centre

• Executed drainage installation and mass concrete pouring for multiple projects.

• Completed construction of 300mm pans with associated steelwork and tie wiring. Achieved float finish as per project specifications.

Multi Skilled Groundwork

Hewitsons Construction
Minehead, Somerset
09.2014 - 07.2015

• Butlins Minehead : Demolition of old chalet blocks and New Build 4 Block chalets

• All associated deep drainage working to lvls, Manhole and Trench Box construction and deconstruction

• Middlesbrough : Outdoor Velidrome Construction

Multi Skilled Groundworker

Clumber Construction
Newark, Nottinghamshire
07.2014 - 09.2014

• Deep Drainage on New Housing Build

• All associated drainage works. Manhole Construction, Benching and finishing to steel lvl.

Pipelayer/Multi skilled Groundworker

MWH
Nottingham, No
02.2012 - 02.2013

• Large diameter Ductile Pipelaying on Severn Trent Reservoir site

Pipelayer

McDermott Construction
Newark, Nottinghamshire
03.2011 - 02.2012

• A46 road widening Newark to Windmerpool

• Storm drainage construction to finish lvl. All associated pipework, Manhole construction, reinstatement.

• Storm holding pond construction and headwall construction

• Road widening stone construction, compaction to finish lvl

Multi Skilled Groundworker

North Midlands Construction
Nottingham, Nottinghamshire
06.2010 - 03.2011

• Stoke Bardoff Sewarge upgrade

• Ductile Pipelayer, multi diameter construction runs and all associated works to finish lvl

Groundworker/Dumper Driver

Carillon
Rutland, Leicestershire
08.2009 - 06.2010

• Rutland Water New Overspill Lagoon Construction

• New dig and fill laggoon Construction, Stabilisation and Compaction

• Bank construction and stabilisation

Groundworker/Dumper Driver

Kier
West Burton, Lincolnshire
08.2008 - 07.2009

• Earthworks/Ground Stabalisation

• Working with Piling Rigs, bund formation and muck away

• Croping piles to lvl, waste away

Groundworker/Dumper Driver

Jackson Civil Engineering
MANSFIELD, Nottinghamshire
02.2006 - 01.2007

• New Build Hospital

• All associated groundworks. Curb Laying, Pipelaying, Manhole Construction, Road crossings, Reinstatement. Road and Car Park stone construction to lvl

• Pile Cropping

Trougher

One on Railway
Hereford , Herefordshire
07.2005 - 02.2006

• Roughing instalation for electrical/fibre optic cables

• Cable pulling and laying

Groundworker/Dumper Driver

Alfred McAlpine
FerryBridge, West Yorkshire
03.2003 - 07.2005

• A1 Road Widening

• Soil Stabilisation, Batter Construction, Stone Road construction to lvl

Agricultural contractor

J&J Tunnard
Freiston, Lincolnshire
03.1991 - 09.1993

Supply of labour to Farming Industry. Planting/Crop Harvesting

Roustabout

Second Forex
Aberdeen , Scotland
02.1988 - 03.1991

• Roustabout, construction/ dismantling of pipe stands for Drill Floor

Coal Miner

British Coal
Ollerton, Nottinghamshire
07.1982 - 02.1988

• Underground Inbye Haulage of all relevant materials to inbye coal face rip

Education

GCSEs - English Language/English Literature/Maths/Geography

Dukeries Comprehensive
New Ollerton
08.1982

Skills

  • Workmanship pride
  • Environmental consciousness
  • Constructive criticism reception
  • Pipe laying expertise
  • Ground levelling and compaction
  • Working under weather constraints
  • Site excavation
  • Deep drainage
  • Concreting
Gary Lumley