Dynamic Rigger with extensive experience at Deme Group, specializing in cable installation and recovery. Proven expertise in rigging preparation and adherence to OSHA regulations, ensuring industrial safety. Adept at collaborating with teams to execute complex projects, including dual carousel loading and undersea cable replacement, while maintaining high standards of efficiency and safety.
Handled Doggerbank cable installation.
• Laying cable onto seabed – from tower to tower and from substation
• Cutting and sealing variations of cable
• Connecting and laying all cable sizes from vessel
• General rigging duties on deck; banking rock bags; secure on and off vessel bodies; pulling heads
• Sea fastening deck
• Slinging up lifts
• Vessel to vessel transfers