Dynamic Rigger with extensive experienced in offshore operations, specializing in rigging preparation and materials movement. Proven ability to lead and work as a team member effectively while adhering to OPITO regulations. Achievements include successful subsea operations and the recovery of complex structures, pipelaying decommissioning heavylifts showcasing strong problem-solving skills and technical expertise in heavy lifting.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Rigger

Dof Subsea
07.2025 - 10.2025

Working as a rigger on the skandi inventor for the change out 36"subsea connecter on to a rigid pipeline manifold for client GASSCO in norway, this was the first Time this type of opperation has been carried out subsea. Then back on to decommissioning dredging works for Total on AF offshoe decom ,activities including, launching and recovery multi purpose dredger, grays and cutting machinary.

Rigger

Dof Subsea
03.2025 - 04.2025

Demobilization of the skandi acergy i was Banksman off loaded the HLS on to a heavy lift barge and full strip out as company change over.

Rigger

Dof Subsea
01.2025 - 02.2025

Description : recovery of 9 christmas tree and 118 concrete mattresses in a team of 5 riggers assisting with the company Claxton for the connecting and disconnection of the trees.

Also assisting with the company Ren Ocean with the grab/umbilical at the depth of 85meter and in the other field 350 meter

Equipment used was mattress frame to position the mattresses on to speed loader frames plied 11 high once recovered and cargo strapped down

Dutys included rigging for subsea on various apparatus, sea fastening, good housekeeping and barriers . Also demobilisation on the quayside.

Rigger

Dof Subsea
06.2024 - 10.2024
  • Riser recover, Gravel bag deployment and wellhead termination with Halliburton concrete spread.
  • Working as 5 squd rigging team . Taking out permits and following procedures and task plans also TBTS. Providing rigging support for deck operations for DOF subsea. Operations cutting and positioning chains for recovery.
  • Worked in a 6 man rigging team laying 7 pipes ,sizes 6inch and 9inchs the pipes where 250m in length Fixing continuity cables ,anodes and the termination valves at each end also fixed insulation covers and buoyancy at the required position. Loading cargo on and off the vessels , deploying and retrieving subsea baskets for rov .

Rigger

Deep Ocean
02.2024 - 05.2024
  • Subsea baskets Decomissiong and recovery with senator cutters cutting pipe.
  • Fixed spill poof metal floor with bitchamin to enclose the gaps incase any spillage crude oil and many activities in Banksman and Slinging.
  • Concrete mats recovery client CNR international and offloaded at the quayside in Aberdeen

Banff & Kyle subsea Decomissiong project

Working alongside utrov and brimmings crains 1400 mats in total recovered.

Rigger

Saipem
02.2023 - 10.2023

Rigger :on the rem supporter
Employer saipem
REM Supporter vessel saipem 7000 & 3000
Loading / unloading heavy lifts Barges, Piles, Casons, Tandem lifts, Grillages and other heavy machinery and tools.

Rigger

Deep Ocean
06.2022 - 12.2022
  • Brent’s rig doing some drilling and flushing for attic oil working as a 4 man rigging team .. setting up various rigging for the job in hand.
  • Deployed 2 spools for rov connection sub sea the first time using such method’s for the company and it went according to plan Working with a 4 man rigging team.
  • De-mob and mob for Brazilian clients installation of WHLS 4 winches and HPU’s. I went as adf and worked alongside quayside lads .We worked as part as a team 5 man squad 2 riggers and 3 quayside lads.

Rigger

Deep Vision
05.2022 - 06.2022

Dredging removal of debre of the sea bed as assisting with the vessel on the heavy lifting needs.

Rigger

Mech-Tech
03.2021 - 05.2022

Working as rigger as part of the 2021 TAR project on valero – Pembroke. Providing key assistance to multiple trades from scaffolding, pipe fitters and mechanical fitters. Duties included: replacement of various spools, valves, pumps and exchangers using general rigging methods and crane age. Working with cranes from 50t to 500t, I also had the pleasure of taking part in the successful replacement of both settler (545t) and De-prop (420t) using SARENS SGC 3000.

Rigger

Global Marine
04.2020 - 02.2021

Working as part of a 5 man rigging team laying cable using twin tensioner system, quadrant doing pull Inns with the tower team and taking part in all rigging/slinging duties on deck.

Taking part in all TBT, also carrying out 14 days load out of cable into carousel at PD PORTS Hartlepool.

Rigger

Wood
07.2018 - 12.2019

Part of a 3-man squad using a mobile cranes and other lifting equipment to install loads.

Signed Permits, Lift Plans, Risk Assessments and Tool Box Talks.

Rigger

Saipem
04.2018 - 05.2018

Spooling 8” umbilical 2k metres onto a carousel. Attending Tool Box Talks and working to RAMS (Risk Assessments/Method Statements).

Rigger / Rope Access Technician

Sparrows
02.2018 - 03.2018

Working on the Britannia platform for ConocoPhillips.Pre rigg for the removal and installation of a 3.8 tone heatric.

Removal of spools attached to the heatic using of 10 tone chain blocks,Using 10 tone turfer to pull the heatric to a safe landing area.

Rigger

Cape PLC Project
05.2017 - 01.2018

Part of a Rigging squad removing/installing valves flanges in line with Method Statements.

Monitoring Rigging/Lifting equipment to ensure safe and effective operations at optimum levels.

Resolving/reporting malfunctions and minimising impact of incidents.

Rigger

Wood Group PLC Shearwater
02.2017 - 03.2017

Following Rigging/Lift Plans and complying with Work Permits to ensure accuracy, safety and quality.

Removing spools PSVS PZVS and installing/removing valves flanges as per work scope.Ensuring cleanliness,

accessibility and appearance of deck areas.

Rigger

Deep Ocean UK
11.2015 - 01.2017

Presently functioning on the Race Bank wind farm project on the Havila Phoenix vessel. The project involves laying and trenching subsea export cables utilising one of the world’s largest subsea trenching apparatus the T3200. My daily Rigging responsibilities include using my in-depth rigging experience to ensure that lifting operations on deck involving the T3200 and also out boarding the A frame are carried out in a safe and efficient manner. Carrying out pre use checks on lifting equipment prior to use and ensuring SIMOPs are carried out in a safe manner whilst the Winches, A frame,T3200 are in operations.

Rigger

ONG Group Vessel
08.2014 - 11.2014

Working on board the FPSO, duties included rigging and banking of the Sarens 1200t crawler crane. I was also involved in rigging up various size structures, spools, valves and accommodation modules. Other areas of work included working inside the turret winches, sheaves etc. Setting up for pull-ins and various rigging duties on the board the FPSO including managing a team of riggers.

Rigger

Bibby Offshore Vessel
06.2014 - 07.2014

Duties on board included riser and umbilical recovery using (VLS) vertical lay system. Removal of mid water arch, clamps, buoyancy modules, horizontal and vertical anchor clamps. Recovery of various size subsea structures along with other rigging activities on deck.

Rigger

Copious GroupSite
03.2014 - 06.2014

I was involved in the refurbishment of the Blackford Dolphin drill rig. My duties included changing and renewing valves, pressure pumps and spools. I also worked in the pontoons renewing the ballast pipe work. This involved setting up chain blocks, soft and wire slings and banking of cranes.

Rigger

Siemens
09.2013 - 10.2013

Three Week shutdown as a Contracting rigger working on behalf of Siemens on a Database Centre which needed mostly minor lifts, But a few major and complicated lifts including a 15ton water base tank.

Rigger

Amtec Group
05.2013 - 08.2013

I was working as a rope access rigger technician painting and rigging fresh steel up the transporter bridge I worked in a team of technicians prepping and painting the bridge and I was the lead rigger on site working of heights of up to 70meters.

Rigger

Aquatic Engineering
01.2013 - 05.2013

I was working as a rigging rope access technician, my duties included mechanical/ hand preparation and recoat using a 3 coat system by means of rope access including aid climbing, I also safely did lifts of up to 10ton installing beams and platforms at height.

Rigger

DWLS Rigging and LIfting
05.2012 - 01.2013

I was working night shifts working as lead rigger and banksman my main duties included taking down and recycling a rig in charge of a team of 6 riggers and 4 banksmen this mainly included working at heights safely removing and banking the removed parts of the rig.

Skills

  • Rigging preparation
  • OPITO regulations
  • Materials movement
  • Equipment moving
  • Banking cranes
  • Subsea operations
  • Heavy Lifting
  • Time management
  • Reliability
  • Working well under pressure
  • I intergrate with all nationalities to work efficently to get the scope of work completed safely

Certification

  • OPITO level 4 Rigger
  • OPITO level 4 Slinger Banksman
  • BOSIET
  • MIST
  • ENG1 Medical & OGUK
  • Norwegian escape chute
  • Yellow fever / Covid vaccination
  • Vantage number : DOB06121985

Timeline

Rigger

Dof Subsea
07.2025 - 10.2025

Rigger

Dof Subsea
03.2025 - 04.2025

Rigger

Dof Subsea
01.2025 - 02.2025

Rigger

Dof Subsea
06.2024 - 10.2024

Rigger

Deep Ocean
02.2024 - 05.2024

Rigger

Saipem
02.2023 - 10.2023

Rigger

Deep Ocean
06.2022 - 12.2022

Rigger

Deep Vision
05.2022 - 06.2022

Rigger

Mech-Tech
03.2021 - 05.2022

Rigger

Global Marine
04.2020 - 02.2021

Rigger

Wood
07.2018 - 12.2019

Rigger

Saipem
04.2018 - 05.2018

Rigger / Rope Access Technician

Sparrows
02.2018 - 03.2018

Rigger

Cape PLC Project
05.2017 - 01.2018

Rigger

Wood Group PLC Shearwater
02.2017 - 03.2017

Rigger

Deep Ocean UK
11.2015 - 01.2017

Rigger

ONG Group Vessel
08.2014 - 11.2014

Rigger

Bibby Offshore Vessel
06.2014 - 07.2014

Rigger

Copious GroupSite
03.2014 - 06.2014

Rigger

Siemens
09.2013 - 10.2013

Rigger

Amtec Group
05.2013 - 08.2013

Rigger

Aquatic Engineering
01.2013 - 05.2013

Rigger

DWLS Rigging and LIfting
05.2012 - 01.2013
Kirk Barratt (Rigger / ADF)