
Heavy Base Maintenance:
Tasks :
Types of Aircraft: Airbus 320/321 Neo, Ceo & ATR 72-600.
Line Maintenance:
Tasks :
• Carry Out Transit Check as per Approved Tansit Check List to Attain :
*Quick Turn Around, On Time Performance, On Time Turn.
• Troubleshoot faults reported by Captain or Crew via Techlog/Cabin Logbook.
• Carryout repeated inspections if required on existing MEL’s that require maintenance action.
• Carryout Magnetic Level Indication on ATR72-600 for Fuel Quantity Indication MEL As per AMM with Chart Diagram for calculation.
• Carry out Aircraft Re-Fuelling as per Standard Operating Procedure.
Type of Aircraft: Boeing 757-200 PCF.
Heavy Base Maintenance :
Tasks :
• VT-BDQ (02 th November 2019 – 01 st December 2019).
• VT-BDN (03rd July 2020 – 28th July 2020).
• VT-BDB (31st July 2020 – 10th August 2020).
• VT-BDO (03rd March 2021 – 18th March 2021).
• LEARJET 24D, JET ENGINE CJ-610-6.
• DORNIER 228, GARRET TURBO PROP ENGINE.
• CESSNA 152,172R, LYCOMING OPPOSED PISTON ENGINE.
• CHETAK HELICOPTER.
• ROBINSON R22.