I am passionate about developing sustainable practices within the construction industry, with extensive experience managing complex timber and hybrid structures using renewable materials such as GluLam and CLT. Proven record of delivering projects from inception to completion on time, within budget, and to the highest quality standards. Skilled in leading teams, coordinating subcontractors, and maintaining excellent client relationships. Strong focus on health, safety, and continuous improvement to ensure compliance and best practice across all operations.
Experience spans all phases of the construction process, from design coordination and fabrication to installation and completion. Recognised for clear communication, decisive leadership, and a methodical approach to problem solving. Committed to driving operational excellence and delivering sustainable, high-quality outcomes within demanding and dynamic environments.

Overview

15
15
years of professional experience
6027
6027
years of post-secondary education

Work history

Installation manager

Xylotek
Bristol
08.2025 - Current
  • Returned to lead installation operations on complex timber and hybrid structures ranging from £200K - £1M
  • Managing project delivery from planning through to completion, including site logistics, lift planning, and subcontractor coordination.
  • Overseeing production interface with design and fabrication teams to ensure build-ability.
  • Responsible for H&S documentation, RAMS approval, and on-site supervision.
  • Driving efficiency and quality across all installation projects.
  • Handled complex installations with precision and care.
  • Monitored performance of individual team members, providing feedback as necessary.

Assistant Contracts manager

Oregon Timber frame
Bristol, Bristol
08.2024 - 08.2025
  • Managed subcontractor activities across various timber frame housing developments. Delivering 300 homes in one year
  • Co-ordinated crane master plans and scheduling across 3 sites
  • Ensured timely achievement of project milestones through effective programme management.
  • Coordinated daily operations between main contractor and subcontractor teams.
  • Resolved on-site issues to maintain uninterrupted build schedules.
  • Delivered projects adhering to Barratt Homes’ quality, safety, and operational standards.
  • Facilitated successful audits adhering to strict documentation requirements of contracts department.

Installation Manager

Xylotek Ltd
Bristol
10.2023 - 08.2024
  • Writing programmes for construction process, on-site reporting against programme and management of change
  • Pre-start and on site client meetings to discuss project delivery
  • Responsible for writing task specific RAMS
  • Reviewing subcontractor RAMS
  • Writing lift plans and on-site lift supervision
  • Engaging with contract lift providers and reviewing Lift plans
  • Pre-construction Work with In house production team and designers to ensure build-ability of projects
  • Use of 3d modelling software (Rhino) to design installation sequences enabling studies of build methodology before site
  • Procurement of materials through existing supply chains and developing new supplier relationships
  • Cost effective Plant procurement using developed network of suppliers
  • Updating resource requirements with weekly look ahead programmes, to ensure jobs have correct labour allocation allowing programme deadlines to be met
  • Logistics Planning and transport booking
  • Carrying out on-site assessments and writing QA reports for use both internally and externally
  • Recording VO and communicating change both internally and externally
  • Management of H&S on-site and keeping up to date project H&S files
  • Provided technical guidance to junior installers, enhancing their competency levels and facilitated their training in line with project requirements

Site Supervisor

Xylotek
Bristol
01.2022 - 10.2023
  • On site Supervision of CLT and Glu_lam structures
  • Working on projects throughout the Uk and abroad
  • Increased Programme reporting and implemented 2 week look ahead reporting system
  • Delivered tool box talks both proactively and reactively
  • Daily site diary updates
  • On site client meetings
  • Daily team briefings
  • Plant checks and records
  • Implemented quality control measures, resulting in high standard outputs
  • Record keeping of on site timber deliveries for FSC PEFC chain of custody requirements
  • Following RAMS and completing Task Control Sheets
  • Week look ahead programming
  • Slinging and Lift supervision

Workshop Lead Fabricator

xylotek
Bristol
03.2021 - 01.2022
  • Managing a team of 10 joiners/carpenters in Bristol workshop manufacturing complex Glulam and bespoke joinery for range of projects
  • On boarding and induction of freelance labour
  • Using fabrication drawings
  • Updating Project managers of fabrication progress against programme
  • Early design engagement to ensure work can be carried out efficiently
  • Booking transport of completed works to site
  • Preparing installation Drawing packs and Site equipment
  • PUWER Tool Checks
  • LOLER checks
  • Ensuring highest standards of health and safety adhered to at all times.

Carpenter / Joiner

Freelance
Bristol
01.2011 - 03.2021
  • All aspect’s of wood work commercial and domestic from apprentice joiner to small business owner : timber framing, timber house extensions, new builds, loft conversions, kitchen fitting, internal joinery and event/advert set builds.

Education

NVQ Level 6 - Construction Site management

CST Training
Bristol
01.2024 - 03.2025

City and guilds diploma - Bench Joinery L2

City of Bristol College
Bristol

BA - Print Making

Brighton University
Brighton

GCSE - 11 A-C

Nunnery wood High School
Worcester

Skills

  • Project mobilisation
  • On-Site Construction Management
  • Build-ability studies
  • Health and safety management
  • Carpentry and Joinery
  • Microsoft office 365
  • Lift Planning
  • Quality inspection
  • Stakeholder management
  • Quality assurance and control
  • Creative problem solving

QUALIFICATIONS

  • SMSTS
  • CSCS ( Black)
  • A61 Appointed Person - lifting Operations
  • A62 Crane/lifting Supervisor
  • CITB Temporary works supervisor
  • Scaffold Inspection and Appreciation (Davis Access)
  • Working at Height
  • Full UK Driving licence (Clean)

Timeline

Installation manager

Xylotek
08.2025 - Current

Assistant Contracts manager

Oregon Timber frame
08.2024 - 08.2025

NVQ Level 6 - Construction Site management

CST Training
01.2024 - 03.2025

Installation Manager

Xylotek Ltd
10.2023 - 08.2024

Site Supervisor

Xylotek
01.2022 - 10.2023

Workshop Lead Fabricator

xylotek
03.2021 - 01.2022

Carpenter / Joiner

Freelance
01.2011 - 03.2021

City and guilds diploma - Bench Joinery L2

City of Bristol College

BA - Print Making

Brighton University

GCSE - 11 A-C

Nunnery wood High School
WILFRED HANDY