Wend-Panga T R Compaore

Halesowen,Birmingham

Summary

Team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Very motivated person , flexible in his approach and enjoys working within a team. Very good knowledge in Intelligent Transport Systems Engineering and Integration.

Good knowledge and understanding of CDM ,CDMT&CEMAR.

Organized and dependable candidate with hands on experience in management , design, construction and handover.

Successful at managing multiple projects with a positive attitude. Willingness to take on added responsibilities to meet team goals using own initiative.

Overview

16
16
years of professional experience
3
3
years of post-secondary education

Work history

Assistant Project Manager

National Highways
Birmingham, West Midlands
07.2022 - Current
  • Makes fully informed decisions by continuously collaborating with project stakeholders, both internally and externally such as SDF Contractors .
  • Innovatively manages resources to maximise efficiency and resolve challenges as they arise.
  • Performs in-depth cost spending analysis to guide project activities, resulting in full adherence to scheme budgets.
  • Collaborates with multiple teams to align and deliver overarching business strategy.
  • Successfully takes several schemes through stage gate .
  • Project delivery includes : The nationwide Led upgrade scheme area 7&9 -The Midlands Technology Modernisation -Various road technology and lighting schemes such ITS tech and cable replacement


Technology Commissioning Engineer

4wayConsulting
Northampton, Northamptonshire
09.2021 - 06.2022
  • Provided documentation and instructions to equip clients with test procedures.
  • Scheduled and coordinated commissioning visits with clients to determine needs and requirements.
  • Troubleshoot machinery and equipment to detect issues and concerns.
  • Evaluated technical documentation of existing client systems and machinery to comprehend functions and purpose.
  • Managed the installation and commissioning of the M1 Stopped Vehicle Detection (SVD) scheme in accordance with specifications under the leadership of Costain and 4Way. Dealing with design issues and TQ . Managing the delivery of technology and civil works required to upgrade the M1 J13 to 16 to an ‘all lane running’ (ALR) smart motorway. Designing the power system required to retrofit the SVD to BS 7671 standards. Producing and monitoring the construction programme and product control forms .
  • Managing Health and Safety onsite

ITS

Intelligent Transport System, KIER
, West Midlands
09.2018 - 07.2021
  • As part of the Technology Service team, I had responsibility for:
  • ITS Feasibility studies
  • ITS Traffic Alert Form (TAF)
  • ITS Technology Value Management (VM)
  • ITS Technologies and Communication System Design and review
  • ITS Technology Power System design
  • Producing ITS Project Control Framework, Commissioning and Handover documentation
  • Producing schedules, departures, Technical Notes and providing input to the work specification
  • Schematic detailed design drawings, PCIP, HERSS, Scope of Work
  • Liaising with different internal teams (geotechnical, environmental, civil engineering) and utilities providers
  • Specific project includes: M40 access renewal scheme
  • M6 Smart Motorway Program Design M1 Junction improvement, scheme feasibility and design M3 Stopped Vehicle detection scheme ,feasibility and design TAME to TMU update scheme, design and implementation M5 Oldbury Via-duct scheme, design M6, M5 Message Sign Renewal M5 Air quality design, Manchester smart Motorways (MSM) feasibility design and implementation, Windy Harbour to Skippool Improvement Scheme, design M4 Midas renewal scheme, design A46 Smart renewable schemes feasibility design and implementation


ITS

Intelligent Transport Systems, Carillion
11.2011 - 02.2018
  • As part of the technology integration team, Smart Motorways department, responsible for:
  • Feasibility study of the Smart Motorway Programs
  • On-site surveys
  • ITS Technology design and review
  • ITS Electrical certification reviews
  • Electrical permit management
  • ITS technology sample quality check
  • Gantry and roadside technology audit
  • Service removal permit
  • Onsite supervision
  • MIDAS, HADECS, AMI, Ramp Metering design, installation and commissioning supervision
  • Liaison with third parties associated with the scheme including: Distribution Network Operators, Technology asset maintainers, Electronic Equipment Suppliers (NRTS, Techmac)
  • Value Engineering (the modification or update of designs and systems according to value analysis)
  • Risk Assessment and Mitigation
  • Procurement advice and assistance (plant, labour, materials)
  • Supply chain partner management (loops, CCD, Commissioning)
  • Programming
  • Testing and Documentation
  • Smart Motorway Power and Communication Installation Engineer with Carillion PLC:
  • Monitoring and surveillance equipment

Structural Technician

Rising Aerial Platform Ltd
07.2007 - 01.2011
  • Designing and assessing metal scaffolding for heavy duties -Installation of gantries and Road side structure such as MS2 - Competent Person responsible for the issue of Form 5 - this is a safety clearance form, proving safety and ready for use
  • Supervision and management of works.

Education

MEng - Electrical and Electronic

Aston University
Birmingham
09.2015 - 06.2018

HND - General Engineering

Worcester College of Technology

HNC - Electrical and Electronic Engineering

Solihull College

18th edition wiring regulations (UK -

Site Management Safety Training Scheme(SMSTS) -

Skills


  • Experienced with a proven history, currently working as an Assistant PM at National Highways (Technology)
  • Up-to date knowledge of CDM ,H&S , Project and Contract Management via CEMAR and CDMT
  • Good knowledge of NH stage gate process
  • Highways Technology System Design (MIDAS, AMI, TMU, ANPR, TAMES, VMSL, SVD,CCTV, Ramp Metering )having worked at 4Way, Kier and Carillion as Intelligent Transport System Engineer completing numerous Smart Motorways Project Integration programs across the United Kingdom
  • Good Knowledge of DMRB
  • Good leadership and team management
  • A positive, strong-willed and committed individual
  • Very good awareness of Health and Safety
  • Hands-on exposure to Highways Communication and Power technology
  • Power System Design; Modelling and stability control
  • Smart Grid and Motorway Technology
  • Programming

Timeline

Assistant Project Manager

National Highways
07.2022 - Current

Technology Commissioning Engineer

4wayConsulting
09.2021 - 06.2022

ITS

Intelligent Transport System, KIER
09.2018 - 07.2021

MEng - Electrical and Electronic

Aston University
09.2015 - 06.2018

ITS

Intelligent Transport Systems, Carillion
11.2011 - 02.2018

Structural Technician

Rising Aerial Platform Ltd
07.2007 - 01.2011

HND - General Engineering

Worcester College of Technology

HNC - Electrical and Electronic Engineering

Solihull College

18th edition wiring regulations (UK -

Site Management Safety Training Scheme(SMSTS) -

Languages

English
Fluent
Wend-Panga T R Compaore