
A results driven Quantity Surveyor with a strong work ethic and a proactive, "can do" attitude. Experienced in managing multiple NEC contracts, with a proven ability to build strong, collaborative client relationships with strong claims management. Skilled at delivering under pressure, consistently meeting key project objectives for both clients and internal stakeholders.
Amended NEC3 Option C ECI + ECC : £23m Utilities Diversion Scheme for Skanska Costain Strabag JV (SCSJV) under the HS2 Scheme
Currently at the final account stage with the client, with the project in a positive gain position.
Skills Enhanced:
Amended NEC4 Option A under the Framework Contract ECI + ECC – £6m Waste Water Treatment Works for Severn Trent Water
Currently in the Construction Stage following the ECI Design.
Skills Enhanced: