Summary
Overview
Work history
Education
Skills
Timeline
Generic

Vlad Andronic

London

Summary

Offering strong problem-solving skills and robust work ethic. Knowledgeable about health and safety regulations and possess keen eye for detail. Good communication and teamwork abilities honed in various roles. Ready to use and develop practical skills, teamwork, and safety awareness. Proficient in Microsoft Office Suite and Adobe Illustrator, ensuring high-quality deliverables. Committed to leveraging technical skills to achieve career growth and contribute effectively to team success.


Overview

3
3
years of professional experience
24
24
years of post-secondary education

Work history

Drainage groundworker

Spoortech
Kings Cross, Camden
06.2020 - 01.2021
  • Drainage system Renewal For Google Building next to St Pancras station.
  • Complied strictly with health and safety regulations, minimising potential hazards on-site.
  • Executed groundwork tasks, resulting in robust foundations for further construction work.
  • Assisted in the installation of complex drainage systems for enhanced water flow.
  • Handled difficult terrain using appropriate machinery to establish proper drainage routes.

General Operative - railway

Walkers
London
01.2020 - 06.2020
  • Station platform renewal on multiple stations: Hither Green, Spalding, Market Harborough, Wellingborough.
  • Fulfilled all assigned tasks within set deadlines: Cooper plates and ACO channels route installation, installation of posts.
  • Operated heavy machinery following safety regulations, promoted safe work environment.

Groundworker Through System - Railway

Ballycommon
Luton - Leicester
05.2019 - 12.2019
  • Trough route installation project between Luton Leagrave station to Corby station, for SPL as Main contractor for the project.
  • Organised materials for timely project completion.
  • Conducted routine checks, ensuring overall site safety and compliance with regulations, for track transport trolley and storage of materials.
  • Completed groundwork tasks within stipulated deadlines for optimal workflow progression. (removing old concrete trough, shifting cable, prepare the area and install the new through system.)
  • Removed unnecessary debris from sites, maintaining tidy and safe working conditions.

Groundworker Railway

McGinley
Camden, London Borough of Camden
02.2019 - 05.2019
  • Project consisted in removing a recess situated next to Camden Lock bridge, by changing the location of a few signal boxes and building a brick safety wall, matching the precious architecture.
  • Removed unnecessary debris from sites, maintaining tidy and safe working conditions.
  • Prepared groundworks, resulting in efficient construction processes.
  • Organised materials for timely project completion.

Insulation installation worker

Skonto
Harrow
01.2018 - 12.2018
  • Collaborated effectively with other tradesmen to complete multi-faceted project, 3 buildings 15, 20 and 22 levels respectively.
  • Executed precise measurements for accurate installation of materials.
  • Completed insulation installations by following detailed project plans.
  • Drilled holes into varied materials and structures to fit bolts, screws.
  • Glued blocks of high density foamed plastic and EPDM for waterproofing.
  • Followed safety procedures working at heights.

Education

Bachelor of Science - Civil Engineering Practice

University of Derby
Derby
04.2001 - 02.2025

Skills

  • Design software competency
  • Efficient communication
  • Attention to Detail
  • Microsoft Office Suite
  • Adobe Illustrator

Timeline

Drainage groundworker

Spoortech
06.2020 - 01.2021

General Operative - railway

Walkers
01.2020 - 06.2020

Groundworker Through System - Railway

Ballycommon
05.2019 - 12.2019

Groundworker Railway

McGinley
02.2019 - 05.2019

Insulation installation worker

Skonto
01.2018 - 12.2018

Bachelor of Science - Civil Engineering Practice

University of Derby
04.2001 - 02.2025
Vlad Andronic