Accomplished professional with a proven track record in leading and delivering projects exceeding $2 billion in value. Demonstrates strong leadership capability, strategic leadership, and in-depth industry insight. Successfully implemented process improvements resulting in a 15% increase in operational efficiency and identified cost-saving measures achieving a 10% reduction in project expenditure. Expertly restructured business operations to enhance performance and competitiveness, while cultivating exceptional teams that improved productivity by 20% and reduced staff turnover by 15%. Achieved a client satisfaction rating of 95% through proactive communication and timely issue resolution. Career goal: to leverage extensive experience and skills to drive organisational success and long-term growth.
Full responsibility for all aspects of Multiple M&E Projects throughout EMEA. Combined total value of 123 Million Euro, locations include Frankfurt, Stockholm, London, Copenhagen and Dublin.
Key Achievements and Responsibilities:
MICIM were contracted by STACK EMEA in a PM Role to deliver GEN02A with a project value of 140M Swiss Francs. SH2 will be one of Switzerland’s largest state-of-the-art, carrier-neutral co-location facilities. Served by 100% renewable power and protected under robust Swiss data privacy laws, GEN02A will have the flexibility to both rapidly deploy its 30MW of capacity and provide rack-ready data halls. Free cooling and chilled water in redundant configuration drive infrastructure efficiencies across operations. The facility will support high-density deployments in excess of 25kW per cabinet up to 40kW so hyperscalers and large enterprises can easily scale according to customer demand for increased data storage and processing.
Key Responsibilites:
22MW Data Centre
K2 Dublin
Contrated by K2 in a Project Mangement, Construction Management role to complete and deliver phases 2 and 3 of a €106m, 22MW facility. Fully ressponsible for the programme, substantiation of the trade contractor costs, quality and commissioning of the project for sign off by the independent commissioning agents. The building houses three 4MW Data Halls, and three 2MW halls. Each cabinet was supplied with an A&B power supply from independent A&B bus-bars which in turn received and A&B supply from independent UPS systems. The IT UPS systems were in an N+1 plus N+1 configuration supported by N+1 MV Generators. The Data Centre cooling systems were designed on direct air, using free cooling air with refrigerant back up for peak loads in an N+1 configuration.
Key Responsibilities
Managing Director, SITRE PMC
Key Roles and Responsibilities:
Saudi Aramco Khurais Oil Fields in Saudi Arabia, I was fully accountable for the day-to-day construction and provision of services required for new oil producers and seawater injection wells. Project Value 1.7Billion US Dollars
Key Responsibilities:
Aluminum Smelter
Ras Al Khair Saudi Arabia.
Working directly as a Construction Manager for the main contractor to provide power HVAC, Instrumentation, Network and process automation across the new 1 billion dollar Aluminum Smelter in Ras Al Khair Saudi Arabia.
Various Projects to include