- Participate and track day to day site progress and ensures project maintains schedule and provide solutions to make up lost times as required
- Manage project expenses to ensures project is delivered within budget
- Provide detailed project status reports, performance data and assist in presentations as required by the stakeholders and management
- Prepare, review, issue RFIs, RFPs, etc
- For subcontracted works
- Additionally assist in preparation, review, evaluation of changes orders etc
- Review, evaluate and recommend subcontractor feedback and proposals (in all fields of scope of works)
- Assist in negotiation and preparation subcontracts in accordance with company subcontracting policies
- Help develop best practices, processes and tools for project execution and management
- Liaising with manufacturer and design department in design coordination of projects
- Evaluation of document, creation of project budget, and risk analysis
- Provided project management and EPC project engineering for the implementation of turnkey projects
- Maintaining coordination with civil & electrical design, procurement, and commercial & sub-contractors’ team
- Adeptly documenting & reviewing project-related documents
- Complete supervision of MEP system as per customers’ specifications & requirements
- EHV / HV Substation Projects
Transmission Package Project TP-1000
Transmission package scope includes the addition of 1000 MVA in KE Transmission System. TP-1000 Mega project consists of 7 Nos new substations and 12 Nos extensions in both 220 kV and 132 kV substations including AIS , HIS, and GIS equipment
132 kV / 11 kV Landhi, KEPZ, Old Port Qasim, and BOC Substation
Design phase coordination with manufacturer, designer, and client approval of all the Substation equipment.
Extension of AIS bay with 40 MVA Siemens Wuhan Power Transformer, Complete ETC works including bays equipment, MV Switchgears, 11 kV Auxiliary Transformer, and 2 x 4 MVAR Capacitor bank with the auxiliary system of AC & DC panels, 220 V and 48 V battery banks. SCADA and Telecom System interfacing with control and protection system.
DHA Extension Projects
Extension of 3 Nos AIS, 40 MVA Power Transformer bays for Siemens Wuhan. Complete ETC works including bays equipment, MV Switchgears,2 x 4 MVAR Capacitor bank with auxiliary system of AC & DC panels, SCADA, and Telecom System interfacing with control and protection system.
GIZRI and Naveena 132 kV UGC Transmission Line Project
Extension of 132 kV Line bays including ETC of UGC laying and termination. Complete ETC works including bays equipment with the auxiliary system of AC & DC panels, SCADA, and Telecom System interfacing with control and protection system.
50 MWp Gharo Solar Power Plant
Complete involvement in construction and ETC of the Gharo Solar Project. 5 Nos bays of 132 kV Siemens GIS, 2 Nos x 40 MVA Siemens Wuhan Power Transformers, 22 kV MV Switcgears, RMUs, Inverters. Inverter transformers, PV plates, AC & DC auxiliary system including Telecom, SCADA, and SAS system with control and protection system.
World Bank Projects in NTDC Pakistan
Complete involvement in ETC of 250 MVA, 220 /132/11 kV Auto Transformer including outdoor busbar system and auxiliary system (220 V and 110 V battery banks) with control and protection system.
Dhabeji Project 220 /132 kV /11 kV
Starting from scratch after the tender. Manufacturer selection and budgeting, involvement in procurement, contract of the Subcontractors, and design approvals.
Design coordination with the manufacturer, design department, and client approvals.
Complete ETC of 7 Nos bays of 220 kV Siemens GIS (8DN9) and 8 Nos bays of 132 kV Siemens GIS (8DN8), TBEA Auto Transformers, Siemens Wuhan Power Transformer, Siemens Nx-Air MV Switchgear, AC and DC system, battery banks, 2 Nos 132 kV UG TBEA cables transmission line with AIS bay equipment,220 and 132 kV Control and Protection system including Telecom, SCADA and SAS system.