Dynamic electrical project management and execution professional with over 12 years of experience in project engineering, site management, budgeting, and maintenance. Proficient in project planning and cost control, integrating project plans from design to commissioning. Demonstrates strong technical skills in analyzing electrical drawings, fault identification, and instrument inspection. Effectively utilizes risk assessments to ensure safety and smooth operations, with exceptional troubleshooting abilities. A meticulous team player, possessing strong analytical and organizational skills, successfully driving projects to completion, including the execution of multiple 220/132/11 kV grid stations for K-Electric, NTDC, and private sectors. Energetic Site Manager, dedicated to on-time project delivery within budget while fostering client relationships

Overview

13
13
years of professional experience
5
5
years of post-secondary education

Work History

Site Manager

Power team Electrical Services (OMEXOM UK & RoI)
KerdiffsTown, Naas
01.2024 - 11.2024

Complete responsibility of ETC of project and progress reporting

  • Maintain all HSEQ requirements on sites during project execution
  • Manage all site-related documents, Quality inspections and safety inspection and audits
  • Co-ordinating with commercial team for Invoicing and with logistic team for dispatch of goods
  • Co-ordinating with service team for installation, testing and commissioning at site
  • Owning end project deliverables during Project Development phase, in particular business case success measures including time, cost, scope & quality whilst acting as PSDP for this phase of project.
  • Developing Project Brief as set out by Network Assets and/or EirGrid into viable Project Management Plan ready to transition from Project Development to Project Delivery stage
  • Delivering for approval Conceptual Physical Designs, Scope of Works, Project Costs and Project Management Plans to agreed target timelines
  • For EPC and D&B projects, aid development of In & Out Of Scope, Interface Schedule and other relevant documents, in conjunction with Project Delivery team and support procurement process for project
  • Manage overall project deliverables for all stakeholders, coordinating inputs with relevant stakeholders at project development stage.

Project Engineer & Senior Executive-Projects

Siemens Pakistan Engineering & Co. Limited
Karachi, Pakistan
02.2017 - 01.2024
  • Participate and track day to day site progress and ensures project maintains schedule and provide solutions to make up lost times as required
  • Manage project expenses to ensures project is delivered within budget
  • Provide detailed project status reports, performance data and assist in presentations as required by the stakeholders and management
  • Prepare, review, issue RFIs, RFPs, etc
  • For subcontracted works
  • Additionally assist in preparation, review, evaluation of changes orders etc
  • Review, evaluate and recommend subcontractor feedback and proposals (in all fields of scope of works)
  • Assist in negotiation and preparation subcontracts in accordance with company subcontracting policies
  • Help develop best practices, processes and tools for project execution and management
  • Liaising with manufacturer and design department in design coordination of projects
  • Evaluation of document, creation of project budget, and risk analysis
  • Provided project management and EPC project engineering for the implementation of turnkey projects
  • Maintaining coordination with civil & electrical design, procurement, and commercial & sub-contractors’ team
  • Adeptly documenting & reviewing project-related documents
  • Complete supervision of MEP system as per customers’ specifications & requirements
  • EHV / HV Substation Projects
    Transmission Package Project TP-1000
    Transmission package scope includes the addition of 1000 MVA in KE Transmission System. TP-1000 Mega project consists of 7 Nos new substations and 12 Nos extensions in both 220 kV and 132 kV substations including AIS , HIS, and GIS equipment

    132 kV / 11 kV Landhi, KEPZ, Old Port Qasim, and BOC Substation

    Design phase coordination with manufacturer, designer, and client approval of all the Substation equipment.
    Extension of AIS bay with 40 MVA Siemens Wuhan Power Transformer, Complete ETC works including bays equipment, MV Switchgears, 11 kV Auxiliary Transformer, and 2 x 4 MVAR Capacitor bank with the auxiliary system of AC & DC panels, 220 V and 48 V battery banks. SCADA and Telecom System interfacing with control and protection system.

    DHA Extension Projects

    Extension of 3 Nos AIS, 40 MVA Power Transformer bays for Siemens Wuhan. Complete ETC works including bays equipment, MV Switchgears,2 x 4 MVAR Capacitor bank with auxiliary system of AC & DC panels, SCADA, and Telecom System interfacing with control and protection system.

    GIZRI and Naveena 132 kV UGC Transmission Line Project

    Extension of 132 kV Line bays including ETC of UGC laying and termination. Complete ETC works including bays equipment with the auxiliary system of AC & DC panels, SCADA, and Telecom System interfacing with control and protection system.

    50 MWp Gharo Solar Power Plant

    Complete involvement in construction and ETC of the Gharo Solar Project. 5 Nos bays of 132 kV Siemens GIS, 2 Nos x 40 MVA Siemens Wuhan Power Transformers, 22 kV MV Switcgears, RMUs, Inverters. Inverter transformers, PV plates, AC & DC auxiliary system including Telecom, SCADA, and SAS system with control and protection system.

    World Bank Projects in NTDC Pakistan

    Complete involvement in ETC of 250 MVA, 220 /132/11 kV Auto Transformer including outdoor busbar system and auxiliary system (220 V and 110 V battery banks) with control and protection system.


Dhabeji Project 220 /132 kV /11 kV

Starting from scratch after the tender. Manufacturer selection and budgeting, involvement in procurement, contract of the Subcontractors, and design approvals.
Design coordination with the manufacturer, design department, and client approvals.
Complete ETC of 7 Nos bays of 220 kV Siemens GIS (8DN9) and 8 Nos bays of 132 kV Siemens GIS (8DN8), TBEA Auto Transformers, Siemens Wuhan Power Transformer, Siemens Nx-Air MV Switchgear, AC and DC system, battery banks, 2 Nos 132 kV UG TBEA cables transmission line with AIS bay equipment,220 and 132 kV Control and Protection system including Telecom, SCADA and SAS system.

Assistant Manager – Electrical & Instrumentation

Rajby Industries (Pvt.) Limited
Karachi, Pakistan
05.2016 - 01.2017
  • Completed installation/commissioning of textile machine, i.e., dryer, washer, laser, etc., while efficiently configuring inverters as per machine requirement, i.e., Siemens, Allen Bradley, Delta, Danfoss, Alpha etc
  • Planned & executed of scheduled maintenance of machines & allied equipment
  • Installed air compressor up to 90 kW i.e., Atlas Copco, CompAir etc., while handling automation of coal fired boiler up to 20 Ton
  • Oversaw maintenance & operations of coal fired boiler, as well as worked on transmitter, level switches temperature controller, pressure
  • Handled controller and humidity and different sensors i.e., actuators

Project Installation Engineer

A A Joyland (Siddiq Sons Group)
Karachi, Pakistan
07.2013 - 04.2016
  • Installed, tested & commissioned (11KV/0.44KV) distribution substations, ring main unit S/s and various capacity transformers up to 2500 KVA with understanding of MV/LV cable laying, joints & its termination
  • Assisted in MV cable testing, earth testing, load testing and MV switchgear testing and calibration, while handling 11 kV VCBs with metering and protections installation and its testing by using best fit practices
  • Provided technical support in bus coupling of ring main unit type of substations
  • Generated drawings and designed & distributed LT panels
  • Designed phase reversal panel, ATS/AMF panels and star/delta for industrial motors, while utilizing load distribution techniques between generators and its synchronization

Project Control Engineer

Libra Engineering
Karachi, Pakistan
01.2012 - 06.2013
  • Designed LT distribution system, while handling LT switchgear, PFI plant, MCC panels, DOL, star/delta, soft starter & VFD systems
  • Managed auto synchronizing & load sharing panels, phase reversal panels & ATS/AMF panels
  • Designed bus coupler panels, power distribution panels & metering cabinets

Education

ME - Electrical Engineering (Power System)

Hamdard University of Engineering & Technology
01.2016 - 01.2018

BS - Electronic Engineering

Sir Syed University of Engineering & Technology
01.2008 - 01.2011

Skills

  • Electrical Engineering
  • Instrumentation & Control
  • Budgeting & Cost Estimation
  • Installation & Commissioning
  • Project Engineering & Execution
  • System Maintenance & Repair
  • Risk Assessment & Mitigation
  • HSE & Regulatory Compliance
  • Technical Reporting Skills
  • Team Building & Leadership Skills
  • Communication & Presentation Skills

sections.external_links.name

Personal Information

Date of birth: 11/07/89

Custom

Led engineering and execution of K-Electric TP-1000 multiple projects (voltage levels 220/132/11kV) Supported in execution of DHA extension project (voltage levels 132/11kV) Managed KE Gizri Line project (voltage level 132 kV) Executed Naveena Line project (voltage level 132 kV) Carried out Naveena Steel project (voltage level 132/11 kV) Handled Gharo Solar Power Plant (50 MWp, voltage level 22kV /132 kV) Executed World Bank Projects (voltage level 220/132/ 11 kV) Supported in engineering and execution of Dhabeji Sub-station (voltage level 220/132/11kV)

Languages

English
Fluent
Urdu
Native

Timeline

Site Manager

Power team Electrical Services (OMEXOM UK & RoI)
01.2024 - 11.2024

Project Engineer & Senior Executive-Projects

Siemens Pakistan Engineering & Co. Limited
02.2017 - 01.2024

Assistant Manager – Electrical & Instrumentation

Rajby Industries (Pvt.) Limited
05.2016 - 01.2017

ME - Electrical Engineering (Power System)

Hamdard University of Engineering & Technology
01.2016 - 01.2018

Project Installation Engineer

A A Joyland (Siddiq Sons Group)
07.2013 - 04.2016

Project Control Engineer

Libra Engineering
01.2012 - 06.2013

BS - Electronic Engineering

Sir Syed University of Engineering & Technology