Summary
Overview
Work history
Education
Skills
Websites
Custom
Timeline
Generic

Sotirios Anagnostaras

London,United Kingdom

Summary

  • Robust background in civil engineering,
  • Wealth of experience as a Project Engineer involved in overseeing the technical aspects of construction projects, from design coordination to on-site execution.
  • Skilled in temporary works coordination, quality management, and ensuring compliance with industry standards.
  • Proactive approach and problem-solving skills contributing to the successful delivery of high-profile projects.

Overview

24
24
years of professional experience
4
4
years of post-secondary education

Work history

Senior Project Engineer

Keltbray
04.2023 - 04.2025
  • Structural alterations to the Victorian Smithfield Market as part of its renovation to become the new home of the Museum of London. £71 m
  • Engineering lead, appointed TWC, design coordination, quality management, package management, and handover.
  • The project's progression revealed numerous unrecorded construction details and modifications.
  • Introduced processes for handling developing site, design, and commercial information.
  • Facilitated effective change management, budget control, and forecasting, leading to smooth delivery

Project Engineer

Kilnbridge
12.2020 - 03.2023
  • Construction of new BBC studios, Sadler’s Wells theatre, and Perimeter Public Retail Realm, part of the Stratford Waterfront development at the Queen Elizabeth Olympic Park. £52 m
  • Simultaneous construction of three complex structural systems with unique characteristics
  • Led engineering team, TWC, design coordination, quality management, package management, and handover.
  • Applied coordinated sequence, suitable temporary works, and specialized concrete workmanship.
  • Delivered structures meeting performance criteria acoustically and visually.

Quality Manager

Kilnbridge
05.2020 - 11.2020
  • The Hinkley Point C is the new UK nuclear power plant tunnel heads. £46 m
  • Oversaw the construction of intake and outfall heads for the new cooling system tunnels in Avonmouth harbour.
  • Ensured construction to nuclear standard with additional durability requirements.
  • Applied strict inspection and record regimes.
  • Construction completed and approved in time for loading 4500 tonne tunnel heads on barges.

Quality Manager

Byrne Bros Formwork
08.2019 - 05.2020
  • Two high rise commercial and residential tower project (42 and a 57 levels), connected via a 5 level podium. £65 m
  • Quality assurance lead.
  • Implemented quality management systems and addressed non-conformities.
  • Liaised with project engineers and building control, conducted site inspections, and facilitated documentation closeout.
  • Ensured high-quality standards and successful project completion.

Quality Manager

Byrne Bros Formwork
06.2018 - 08.2019
  • The eight-story structure, with a five-level basement, was built simultaneously, top down and bottom up. £54 m
  • Managed QA for an eight-story structure with a five-level basement.
  • Prolonged summer heatwave introduced risks to the program.
  • Imported methods from Australia and the US to mitigate risks.
  • Maintained quality standards and met programme milestones.

Project Engineer

FDL/McLaren
04.2017 - 05.2018
  • The Ray. A commercial and residential development on Farrington street. The seven-story concrete structure comprises one level of basement, two pre-cast twin-wall cores, and post-tensioned slabs. £9 m
  • Led the engineering team for a commercial and residential development.
  • Managed everyday engineering issues and supporting work.
  • Project handed over successfully within a week from work completion.

Project Engineer

Erith
Hammersmith
03.2017 - 04.2017
  • Becktel House Demolition and enabling works for the new Legal and General office block. £5 m
  • Assisted with the final stage of the project.
  • In charge of production of crushed hardcore for piling matt formation.
  • Used 3D measurement techniques to calculate daily production.
  • Built the matt with minimum surplus to remove.

QA/QC Engineer

Byrne Bros/MULTIPLEX
City of London
01.2016 - 02.2017
  • The London Development Project involved the construction of the new European Headquarters of Goldman Sachs. The eight-story structure with a two-level basement, 1.2m deep raft slab, and six cores, covers a full ten-acre city block having more office space than the Shard. £42 m
  • QA/QC for sections of the RC structure and waterproofing.
  • Conducted site inspections, handled data management and produced design solutions for non-conformities.
  • Certified and delivered the project on time.

Company Director

RC Contractor
Greece, Europe
10.2007 - 12.2015
  • RC frames, foundations, and basements.
  • Delivered various RC frames, foundations, and basements.
  • Implemented effective project management strategies.
  • Successfully completed projects on time and within budget.

Army engineer officer

Hellenic Army
Greece, Europe
05.2006 - 10.2007
  • Received reserve officer’s training
  • Army engineering training included, leadership, use of plant, bridging methods, explosives, minelaying and sweeping.
  • Got tasked with the maintenance of military and civil infrastructure of the local brigade
  • Participated in design proposals and planning

Project Engineer/Construction Manager

Diktiosi SA
Greece, Europe
09.2004 - 05.2006
  • Two new sewer networks for the Island of Poros, €5.5m and town of Methoni, €6.5m.
  • Excavation in heritage settlements with access restrictions and varying ground conditions.
  • Segmented limestone and granite sections; used wells to drain trenches.
  • Overcame site constraints maintaining safety and efficiency.

Site engineer

Freelance
Greater London
04.2001 - 05.2004
  • Leander Construction Dec 2003 – Aug 2004 Multiple projects
  • Kaybridge, Jun 2003 – Dec 2003 Underground car park
  • Miller Construction/Vinci, Jan 2003 – May 2003 Ibis/Novotel
  • CWCL, Oct 2002 – Dec 2002 HQ5 Clifford Chance
  • Scanmoore Construction, Jan 2002 – Sep 2002 Tesco store
  • Byrne Bros (Formwork) Ltd, Jan 2002 – Jun 2002 BBC Studios
  • Ballymore Properties, Sep 2001 – Dec 2001 Development

§ St. George Central London, Apr 2001 – Sep 2001 Development

Education

BEng (Hons) - Civil Engineering

University of Greenwich
School Of The Built Environment
01.1996 - 01.2000

Skills

  • MS Office, MS Project, AutoCAD Civil 3D, Topocad, Mathcad, Data management, AI tools
  • SMSTS (CITB)
  • Works Coordination (CITB)
  • Temporary works design (ICE)
  • Consolidated Planing (ICE)
  • Quality Management (ICE)
  • PMP, PQP, ITP
  • Problem Solving
  • Communication Skills
  • Contract Law, CDM regulations, HS&W
  • Construction methods, TW Systems
  • BREEAM and sustainability, Cement replacements

Custom

  • Learning
  • Free diving
  • Ballroom dancing

Timeline

Senior Project Engineer

Keltbray
04.2023 - 04.2025

Project Engineer

Kilnbridge
12.2020 - 03.2023

Quality Manager

Kilnbridge
05.2020 - 11.2020

Quality Manager

Byrne Bros Formwork
08.2019 - 05.2020

Quality Manager

Byrne Bros Formwork
06.2018 - 08.2019

Project Engineer

FDL/McLaren
04.2017 - 05.2018

Project Engineer

Erith
03.2017 - 04.2017

QA/QC Engineer

Byrne Bros/MULTIPLEX
01.2016 - 02.2017

Company Director

RC Contractor
10.2007 - 12.2015

Army engineer officer

Hellenic Army
05.2006 - 10.2007

Project Engineer/Construction Manager

Diktiosi SA
09.2004 - 05.2006

Site engineer

Freelance
04.2001 - 05.2004

BEng (Hons) - Civil Engineering

University of Greenwich
01.1996 - 01.2000
Sotirios Anagnostaras