Summary
Overview
Work History
Education
Skills
Accomplishments
Software
Work Availability
Timeline
Generic
Siu Wai (Edwin) Hon

Siu Wai (Edwin) Hon

Irlam

Summary

Professional manager with significant expertise in overseeing complex projects and ensuring timely delivery. Skilled in strategic planning, negotiation, cost saving, budget management, and risk assessment. Strong focus on team collaboration, fostering results-driven environment, and adapting to changing needs. Known for reliability, leadership, and effective communication.

Overview

32
32
years of professional experience

Work History

Project Manager/Procurement Manager

Synaptics HK Ltd
06.2006 - 08.2024
  • I established the local engineering team to sustain released products and suppliers' qualification. Besides, I also support design centers to speed up and optimize design with manufacturability consideration on multiple key projects, including BOM and specification update.
  • In 2017, I changed my responsibility to Procurement Manager.
  • I am responsible for managing all CMs and tester suppliers for PC division, including sourcing, cost reduction and qualification of new suppliers/CMs including background check, supplier contract and audit.
  • Besides, I need to work with existing CMs ensure capacity and infrastructure is ready to support production, review capacity and prepare yearly CAPAX budget
  • I manage various commodities like cover glass, metal/plastic bracket, IC, FPC, connector, switch, adhesive/glue and passive components.
  • I arranged the quarterly business review with key suppliers/CMs with internal teams like Manufacturing, Testing, Quality and Planning to feedback on KPI and other communication tools (Oracle/Agile) like quality incidents and on-time delivery to reflect the situation with all CMs, and come up with the action plan for improvement
  • Besides, I also handled crisis about patent inferring from a lawsuit and get it resolved in target time
  • I involved several acquisitions to support the integration into Synaptics
  • I prepared the saving budget and review with suppliers/CM quarterly to review and progress

Project Manager

Varitronix Ltd
05.2003 - 11.2005
  • To lead the LCM design team to design customized LCM and sustain existing products and improve design to meet schedule
  • To setup the new design team to achieve the first pass yield from 90 to 97% and reduce average development time from 8 to 5 days

Project Manager

Philips Mobile Display Systems
09.2002 - 04.2003
  • Transfer to Philips Shanghai to set up a development center in China
  • Apart from managing new projects, I am also responsible for yield improvement and design optimization for those products launched in mass production stage
  • To improve the average production yield from 98.5 to 99%

Project Manager

Philips Mobile Display Systems
12.2001 - 08.2002
  • Transfer to Philips Kobe factory and developed a standard LTPS platform as one of the company standard platform
  • Besides, I also supported the business team to coordinate the design and production of TFT panel between other design center and Kobe
  • To developed the first LTPS platform with partner and design win the major customer projects for production

Project Manager

Philips Mobile Display Systems
02.2000 - 11.2001
  • To initiate and manage a successful and timely development program
  • Introduction and support for the respective products in a way that customer satisfaction and company profit are optimized
  • As a team leader to manages a team of specialists to work on a project from concept to mass production
  • To successfully got the design win from Nokia Finland to HongKong design center, deliver the prototype on time and prepare sufficient production capacity at target cost

Sr Product Engineer

Solomon Systech Ltd
07.1999 - 01.2000
  • Product development for display module and major in mechanical design & process development of LCD module
  • To define specification with customer & negotiation with suppliers
  • Prepare production equipment, carry out cost reduction & yield improvement plan
  • Besides, I also involved in semiconductor packaging and Manufacturability for design
  • To design the display module and work with factory to prepare equipment to meet customer demand on time

Sr Product Engineer

Motorola Semiconductor (HK) Ltd
06.1997 - 06.1999
  • Mechanical design & technical support of LCD module manufacturing
  • Production equipment preparation, cost reduction & yield reduction plan
  • To win the first LCM project in house to enrich product portfolio and improve revenue and margin

Mechanical Engineer

Fargo Services
12.1996 - 05.1997
  • Product design verification, Injection / Press tooling procurement
  • Negotiate with supplier / customer & technical support
  • To work with customers and suppliers to optimize the design to reduce cost and reduce production time

Production Engineer

Varitronix Ltd
01.1995 - 11.1996
  • Product verification, production tooling & production equipment preparation / procuring
  • Maintain production line
  • Trouble shooting of production problem & yield improvement program
  • To review factory layout and streamline the shop-floor to improve the yield and reduce the machine failure rate

Project Engineer

Varitronix Ltd
09.1992 - 12.1995
  • Project follow up from design stage to production stage
  • Including design verification & modification, cost estimation, tooling & equipment preparation, menu preparation & keep in contact with customer
  • To make sure the key projects deliver on time and meet target yield

Education

MBA - Knowledge Management

University of Strathcyde
Glasgow, United Kingdom
04.2001 -

BEng (Hon) in Manufacturing Engineering -

Hong Kong Polytechnic
Hongkong
04.2001 -

Skills

Project management

Accomplishments

  • Completed the Annual Cost saving Project on time and US$500K as plan in 2024.
  • Collaborated with operation team in the development of automation production at CM to achieve 120ppm
  • Qualify second CM at Vietnam to migrate supply risk in China

Software

Microsoft office

Solidworks

Autocad

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Project Manager/Procurement Manager

Synaptics HK Ltd
06.2006 - 08.2024

Project Manager

Varitronix Ltd
05.2003 - 11.2005

Project Manager

Philips Mobile Display Systems
09.2002 - 04.2003

Project Manager

Philips Mobile Display Systems
12.2001 - 08.2002

MBA - Knowledge Management

University of Strathcyde
04.2001 -

BEng (Hon) in Manufacturing Engineering -

Hong Kong Polytechnic
04.2001 -

Project Manager

Philips Mobile Display Systems
02.2000 - 11.2001

Sr Product Engineer

Solomon Systech Ltd
07.1999 - 01.2000

Sr Product Engineer

Motorola Semiconductor (HK) Ltd
06.1997 - 06.1999

Mechanical Engineer

Fargo Services
12.1996 - 05.1997

Production Engineer

Varitronix Ltd
01.1995 - 11.1996

Project Engineer

Varitronix Ltd
09.1992 - 12.1995
Siu Wai (Edwin) Hon