Summary
Overview
Work History
Education
Skills
Accomplishments
Software
Work Availability
Timeline
Generic
Siu Wai (Edwin) Hon

Siu Wai (Edwin) Hon

Irlam

Summary

Professional manager with significant expertise in overseeing complex projects and ensuring timely delivery. Skilled in strategic planning, negotiation, cost saving, budget management, and risk assessment. Strong focus on team collaboration, fostering results-driven environment, and adapting to changing needs. Known for reliability, leadership, and effective communication.

Overview

32
32
years of professional experience

Work History

Project Manager/Procurement Manager

Synaptics HK Ltd
2006.06 - 2024.08
  • I established the local engineering team to sustain released products and suppliers' qualification. Besides, I also support design centers to speed up and optimize design with manufacturability consideration on multiple key projects, including BOM and specification update.
  • In 2017, I changed my responsibility to Procurement Manager.
  • I am responsible for managing all CMs and tester suppliers for PC division, including sourcing, cost reduction and qualification of new suppliers/CMs including background check, supplier contract and audit.
  • Besides, I need to work with existing CMs ensure capacity and infrastructure is ready to support production, review capacity and prepare yearly CAPAX budget
  • I manage various commodities like cover glass, metal/plastic bracket, IC, FPC, connector, switch, adhesive/glue and passive components.
  • I arranged the quarterly business review with key suppliers/CMs with internal teams like Manufacturing, Testing, Quality and Planning to feedback on KPI and other communication tools (Oracle/Agile) like quality incidents and on-time delivery to reflect the situation with all CMs, and come up with the action plan for improvement
  • Besides, I also handled crisis about patent inferring from a lawsuit and get it resolved in target time
  • I involved several acquisitions to support the integration into Synaptics
  • I prepared the saving budget and review with suppliers/CM quarterly to review and progress

Project Manager

Varitronix Ltd
2003.05 - 2005.11
  • To lead the LCM design team to design customized LCM and sustain existing products and improve design to meet schedule
  • To setup the new design team to achieve the first pass yield from 90 to 97% and reduce average development time from 8 to 5 days

Project Manager

Philips Mobile Display Systems
2002.09 - 2003.04
  • Transfer to Philips Shanghai to set up a development center in China
  • Apart from managing new projects, I am also responsible for yield improvement and design optimization for those products launched in mass production stage
  • To improve the average production yield from 98.5 to 99%

Project Manager

Philips Mobile Display Systems
2001.12 - 2002.08
  • Transfer to Philips Kobe factory and developed a standard LTPS platform as one of the company standard platform
  • Besides, I also supported the business team to coordinate the design and production of TFT panel between other design center and Kobe
  • To developed the first LTPS platform with partner and design win the major customer projects for production

Project Manager

Philips Mobile Display Systems
2000.02 - 2001.11
  • To initiate and manage a successful and timely development program
  • Introduction and support for the respective products in a way that customer satisfaction and company profit are optimized
  • As a team leader to manages a team of specialists to work on a project from concept to mass production
  • To successfully got the design win from Nokia Finland to HongKong design center, deliver the prototype on time and prepare sufficient production capacity at target cost

Sr Product Engineer

Solomon Systech Ltd
1999.07 - 2000.01
  • Product development for display module and major in mechanical design & process development of LCD module
  • To define specification with customer & negotiation with suppliers
  • Prepare production equipment, carry out cost reduction & yield improvement plan
  • Besides, I also involved in semiconductor packaging and Manufacturability for design
  • To design the display module and work with factory to prepare equipment to meet customer demand on time

Sr Product Engineer

Motorola Semiconductor (HK) Ltd
1997.06 - 1999.06
  • Mechanical design & technical support of LCD module manufacturing
  • Production equipment preparation, cost reduction & yield reduction plan
  • To win the first LCM project in house to enrich product portfolio and improve revenue and margin

Mechanical Engineer

Fargo Services
1996.12 - 1997.05
  • Product design verification, Injection / Press tooling procurement
  • Negotiate with supplier / customer & technical support
  • To work with customers and suppliers to optimize the design to reduce cost and reduce production time

Production Engineer

Varitronix Ltd
1995.01 - 1996.11
  • Product verification, production tooling & production equipment preparation / procuring
  • Maintain production line
  • Trouble shooting of production problem & yield improvement program
  • To review factory layout and streamline the shop-floor to improve the yield and reduce the machine failure rate

Project Engineer

Varitronix Ltd
1992.09 - 1995.12
  • Project follow up from design stage to production stage
  • Including design verification & modification, cost estimation, tooling & equipment preparation, menu preparation & keep in contact with customer
  • To make sure the key projects deliver on time and meet target yield

Education

MBA - Knowledge Management

University of Strathcyde
Glasgow, United Kingdom
2001.04 -

BEng (Hon) in Manufacturing Engineering -

Hong Kong Polytechnic
Hongkong
2001.04 -

Skills

Project management

Project tracking

Risk management

Cost control

Team bonding

Accomplishments

  • Completed the Annual Cost saving Project on time and US$500K as plan in 2024.
  • Collaborated with operation team in the development of automation production at CM to achieve 120ppm
  • Qualify second CM at Vietnam to migrate supply risk in China

Software

Microsoft office

Solidworks

Autocad

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Project Manager/Procurement Manager

Synaptics HK Ltd
2006.06 - 2024.08

Project Manager

Varitronix Ltd
2003.05 - 2005.11

Project Manager

Philips Mobile Display Systems
2002.09 - 2003.04

Project Manager

Philips Mobile Display Systems
2001.12 - 2002.08

MBA - Knowledge Management

University of Strathcyde
2001.04 -

BEng (Hon) in Manufacturing Engineering -

Hong Kong Polytechnic
2001.04 -

Project Manager

Philips Mobile Display Systems
2000.02 - 2001.11

Sr Product Engineer

Solomon Systech Ltd
1999.07 - 2000.01

Sr Product Engineer

Motorola Semiconductor (HK) Ltd
1997.06 - 1999.06

Mechanical Engineer

Fargo Services
1996.12 - 1997.05

Production Engineer

Varitronix Ltd
1995.01 - 1996.11

Project Engineer

Varitronix Ltd
1992.09 - 1995.12
Siu Wai (Edwin) Hon