As an Electrical Engineering Intern at LESCO WAPDA, I have gained hands-on experience in the planning, design, and optimization of new feeder systems. I actively contribute to fault detection and load management for existing feeder systems, ensuring efficient operation and minimal disruptions. I have been involved in conducting financial feasibility evaluations of new systems, comparing them to existing ones to ensure cost-effectiveness. Additionally, I have worked with power tools and testing equipment for both residential and industrial projects, ensuring compliance with PEC standards and local electrical codes while maintaining high safety and quality standards throughout all phases of electrical installations and troubleshooting.
· Planning, Design and Optimization of new Feeder System
· Fault Detection and Load Management in Existing Feeder systems of LESCO
· Financial Feasibility Evaluation of New Systems in Comparison to Existing Systems
· Operated and maintained professional-grade power tools and testing equipment for installations and troubleshooting on residential and industrial sites, including projects in collaboration with LESCO and WAPDA contractors.
Ensured adherence to PEC (Pakistan Engineering Council) standards and local electrical codes while delivering high-quality, safe, and reliable electrical services across all project phases
Design and Manufacturing of Artificial Environment Chamber for High Voltage Testing
Design and FEA Analysis using COMSOLE of a 33/11KV,10MVA Transformer HT Bushing
Design of Smart Home Automation System for Appliances
Design of Frequency Modulation Radio System (FM Radio)
Design of Bluetooth controlled LED Lighting System
· Best Ambassador of Pakistan in International Leader Summit (ILS) held in Lahore
· SAC Chair of IEEE (Institute of Electrical and Electronics Engineers)
· International IEEE Member (ID:100139073)