Suez Waste Management, Trafford, Manchester (renew hub)
worked closely with other trades people to carry out refurbishment on warehouse to become the countries first renew hub.
- Performed timely electrical system installation of conduit, galvanized trey and trunking systems
- Installed and terminated a variety of different cable types including SWA, FP200, NYY, SY, single insulated cabling and twin and earth.
- Planned layout and installation of electrical wiring, equipment and fixtures based on specifications and applicable regulations.
- Interpreted drawings, wiring diagrams, flow charts and written descriptions to deliver to project requirements.
- Performed complex electrical installations and fit-outs, employing strict attention to detail to reduce errors.
- Complied with BS 7671 standards to complete electrical installations.
- Installed, examined and repaired electrical wiring systems in different settings.
Trutex schoolwear, Clitheroe.
refurbishment of section of wearhouse: alterations to warehouse racking system lighting controls and system.
- Installed containment systems, wiring and lighting in correspondence to drawing and wiring diagrams.
- Determined and implemented bespoke wiring layout and installation requirements.
- Used measurement instruments and precision tools to deliver exact specifications.
- Tested electrical installations for performance and functionality.
- Trained and mentored junior electricians, providing diligent monitoring to ensure safe, quality workmanship.
- Maintained clean, safe working environments, minimising risk to staff and visitors.
- Worked under tight schedules to deliver orders on time without compromising on quality.
Everything retreat, Mellor
full electrical installation for new bar building on luxury glamping pod retreat
regular site maintenance visits to ensure safety and correct operation for 12x pods and general site electrics.
- Ensured compliance with industry standards whilst creating electrical designs.
- Worked closely with other tradesmen, coordinated seamless installations in larger construction projects.
- Worked according to strict timelines whilst maintaining high standards of workmanship in every project undertaken.
- Worked overtime during peak periods to ensure smooth flow of operations.
- Adapted quickly to changing customer demands, providing a consistent level of service.
- Responded promptly to emergency callouts to minimise operational delays.