Summary
Overview
Work History
Education
Skills
Timeline
Generic

Scott Grant

Production engineer
Sutton

Summary

Enthusiastic production engineer with 3 years of experience. Secures team success through hard work, attention to detail and excellent organisation. Shares previous knowledge that i have obtained over the last 20 years within the water industry to achieve results. I am a motivated and experienced in product design and development. Focused on innovating production systems through targeted analysis and solutions. Meticulous and methodical across technical tasks for reliable results.

I Take on challenging new roles harnessing interpersonal skills, collaboration and problem-solving. Driven to deliver high-quality service and consistent results.

Overview

20
20
years of professional experience

Work History

Production Engineer

Anglian water
Northampton
04.2022 - Current
  • Completed site documentation before and after work tasks.
  • Planned staff and materials costs to meet production schedules.
  • Drew up production schedules and budgets for projects.
  • Controlled industrial hygiene equipment, reducing exposure to environmental contaminants.
  • Managed project timelines, delivered on schedule commitments.
  • Designed improvements to existing systems, boosting production output.
  • Measured process performance through tests, recommending improvements to increase productivity.
  • Established effective communication channels between departments fostering teamwork and collaboration.
  • Produced reports and presented progress at project meetings and to clients.
  • Analysed data to control costs and enhance service delivery.
  • Initiated cost control measures to keep within budgetary limits.
  • Ensured adherence to health and safety regulations for workforce wellbeing.
  • Write and implement documentation for reference purposes.
  • Adapted engineering designs to meet product requirements.
  • Scheduled manufacturing teams to achieve timely project completion.
  • Liaised with stakeholders to progress projects and meet production goals.
  • Achieved quality and safety compliance through rigorous manufacturing monitoring.

Network Technician

Anglian Water
03.2016 - 02.2025
  • Some of my duties as a Network technician involve Filling out Risk assessments, Completing impact plans, Locating & resolving leaks, Liaising with Customers, Monitoring flows and pressures of the network, working closely with management and other departments, Completing any training that has been assigned, Site surveys, Moving jobs to work, Use of the new oracle system, Impact plan training, CDM Workday training
  • I have fully completed the LTO

Ganger

Balfour Beatty/Clancy Docrwa
Great Billing
02.2012 - 01.2016
  • I am in charge of a 2 man Team and I am responsible for completing the works that I have been given and following detailed drawings whilst making sure that the necessary health and safety regulations are followed at all times
  • Repairing burst water mains/service repairs/stop tap repair, Main laying, Service laying, Installing new assets on water mains such as Fire Hydrants, PRV's, Sluice Valves, Under pressure T's, PPM points
  • All works completed would have to have detailed documentation and photographic evidence, which I would complete at all times
  • I also assist the Network Technicians to find an alternative supply and organise any additional work if required
  • Part of my role as the Ganger would be to liaise with the general public and customers, making sure that they were fully aware of any disruption that May be caused to their normal service
  • This could also be in an emergency situation when I was on call as part of the company’s standby rota
  • My responsibilities also include filling out the timesheets, and the plant Audit sheets
  • I let the departments know when repairs are needed to any of the equipment that I use

Ganger

May Gurney
Waterbeach / Kings Lynn
06.2007 - 02.2012
  • I was part of a 2-man gang, and responsible for completing the works making sure that the necessary health and safety regulations were followed at all times, when repairing burst water mains/service repairs/stop tap repairs, Main laying, Service laying, Installing new assets on water mains such as Fire Hydrants, PRV's, Sluice Valves, Under pressure T's, PPM points
  • Set up Traffic Management when required
  • All works completed would have to have detailed documentation and photographic evidence, which I would complete at all times
  • Part of my role as the ganger would be to Liaise with the general public and customers, making sure that they were fully aware of any disruption that may be caused to their normal service
  • This could also be in an emergency situation when I was on call as part of the Companies standby Rotas

Operative

McAlphines Utilities
Luton
02.2005 - 06.2007
  • I started as a labourer in a 2 man Team, where my daily duties could consist of Digging and repairing burst water mains, Main Laying, Service Laying, Installing new assets on water mains such as Fire Hydrants, PRV's, Sluice Valves, Under pressure T's, PPM points
  • This could also be in an emergency situation when I was on call as part of the Companies standby rota

Education

GCSE - English, Maths, CDT, Geography, Art, Science

Witchford Village College
Witchford, Ely
04.2001 - 01.1991

Skills

  • CSCS Skilled worker
  • NRSWA
  • Abrasive wheel
  • EURS
  • Digger ticket for 10 Tonne and above
  • Deep EX
  • Leakage detection
  • Valve ops Trained
  • Flo and pressure trained
  • Water Quality Trained
  • Customer serviced Trained
  • LTO fully trained
  • CDM workday trained
  • Impact plan writing
  • Oracle system
  • Toughbook 2
undefined

Timeline

Production Engineer

Anglian water
04.2022 - Current

Network Technician

Anglian Water
03.2016 - 02.2025

Ganger

Balfour Beatty/Clancy Docrwa
02.2012 - 01.2016

Ganger

May Gurney
06.2007 - 02.2012

Operative

McAlphines Utilities
02.2005 - 06.2007

GCSE - English, Maths, CDT, Geography, Art, Science

Witchford Village College
04.2001 - 01.1991
Scott GrantProduction engineer