Summary
Overview
Work History
Education
Skills
Timeline
Generic

Scott Croxford

Milton Keynes,

Summary

Knowledgeable about construction and skilled in manual labour. Strong problem-solving abilities and excellent teamwork. Committed to safety and eager to learn. Ready to use and develop skills in measurement, installation, and finishing in role.

Hands-on worker with background in carrying out tasks to schedule on construction projects. Holds team members to high standards, demonstrating meticulous attention to detail. Builds rapport easily and fulfils client expectations.

Overview

36
36
years of professional experience

Work History

Ceiling fixer and partitioning

Self employed
Milton Keynes,, Buckinghamshire
02.1989 - Current
  • Followed health and safety guidelines for workplace security.
  • Completed projects on time by adhering to strict deadlines.
  • Operated equipment safely, reducing risk of injuries.
  • Coordinated effectively with other tradesmen to expedite project completion.
  • Conducted site surveys before starting work, assuring the suitability of area for installation.
  • Applied safety measures during work to prevent accidents.
  • Read and interpreted drawings for accurate implementation.
  • Kept workspace clean after job completion, preserving professional image.
  • Carried out regular maintenance checks on installed ceilings for durability assurance.
  • Installed ceiling systems, ensuring a safe and secure workspace.
  • Repaired damaged ceiling parts, extending their lifespan.
  • Tackled complex projects requiring precision and skill.

Education

Skilled Worker - Ceiling fixer (working at height)

Construction Skills Certification Scheme
Milton Keynes
10.2024

NVQ Level 2 - Ceiling fixing

Construction Awards Alliance
Milton Keynes
05.2010

Skills

  • Acoustic ceiling installation
  • Tile replacement
  • Acoustic panel fitting
  • Fire-Rated ceilings
  • Metal furring systems
  • Precision measurement
  • T-Bar ceilings
  • Soundproofing techniques
  • Vinyl rock ceiling panels
  • Cooperating with tradespeople
  • Suspended ceiling systems
  • Job site cleanliness
  • Commercial interior fit-outs
  • Drywall fixing
  • Heavy lifting capability
  • T-Bar grid installations
  • Ceiling installation
  • Equipment maintenance knowledge
  • Fall protection training
  • Plasterboard fixing
  • Plasterboard handling
  • Adaptable to new materials
  • Post-Installation inspection
  • Resolving on-site challenges
  • Fibreglass installation
  • Ladder and scaffold use
  • Metal stud partitioning
  • Fire-Rated ceiling installation
  • From-The-Ladder work
  • Project planning capabilities
  • Efficient time management
  • Drywall hanging
  • Gypsum board cutting
  • Project organisation
  • Suspended ceiling assembly
  • Detail-Oriented installation
  • Troubleshooting expertise
  • Customer Service
  • Surface preparation
  • Material cutting
  • Judgement and decision making
  • Blueprint interpretation
  • Safety awareness
  • Power tool operation
  • Task prioritisation
  • Technical understanding
  • Power tool proficiency
  • Deadline-oriented
  • Working at heights
  • Insulation
  • Health and Safety Compliance

Timeline

Ceiling fixer and partitioning

Self employed
02.1989 - Current

Skilled Worker - Ceiling fixer (working at height)

Construction Skills Certification Scheme

NVQ Level 2 - Ceiling fixing

Construction Awards Alliance
Scott Croxford