Summary
Overview
Work History
Education
Skills
sections.external_links.name
Certification
Custom
Timeline
Generic

Sagar Shah

London

Summary

Highly experienced Senior Site Agent / Advanced Civil Engineer with 7 years of expertise in delivering complex infrastructure projects, specializing in highways, bulk earthworks, drainage, pavements, traffic management, retaining structures, and sheet piling. Proven ability to optimize costs, manage multi-disciplinary teams, and implement innovative engineering solutions that drive efficiency and profitability. Strong commercial acumen, with a track record of delivering major cost savings and improving project performance.

Overview

6
6
years of professional experience
2018
2018
years of post-secondary education
1
1
Certification

Work History

Site Agent

Balfour Beatty
WISLEY, Surrey
01.2022 - 02.2025
  • Led the self-delivery of 2.5km road widening along the Northbound and Southbound verges, including the development of two new NMUs and widening of the gyratory at M25 J10
  • Successfully delivered Jet Lanes ahead of schedule, combining two closures into one, resulting in a £150k cost saving due to meticulous planning and coordination
  • Achieved £1.2 million in cumulative cost savings by challenging design assumptions and optimizing drainage crossings through alternative construction methods
  • Developed detailed stage programmes to optimize resources and integrated updates into the CL32 contract programme
  • Spearheaded stakeholder management, including Surrey County Council and high-profile private institutions, ensuring seamless communication and project transparency
  • Managed a team of 2 Sub Agents, 2 Section Engineers, 4 Site Engineers, and 2 Graduate Engineers, fostering a culture of efficiency and professional development
  • Played a key role in commercial strategy by analysing project P&L, tracking costs, and reporting on weekly performance in collaboration with the commercial team
  • Actively contributed to Balfour Beatty's AIMS production hub development, enhancing project monitoring and short-interval control efficiency

Sub Agent

Balfour Beatty
WISLEY, Surrey
07.2021 - 01.2022
  • Managing Utility diversion undertaken by Balfour Beatty utility services for Balfour Beatty Highways
  • Attending planning meetings and creating a stage programme for utility diversions
  • Managing all the enabling works including ecological mitigation before the main construction works start
  • Preparing WPP for various work locations such as setup of compound and help with WPP for structures sub-contractor (Expanded)
  • Preparing excel sheets for evaluating actual cost and forecasting the cost for enabling works to extract earned value every week
  • Preparing phase plan for compound works to manage people and plant interfaces

Section Engineer/Sub Agent

Balfour Beatty
Slough, Berkshire
01.2020 - 01.2021
  • Oversaw 16km of motorway expansion, managing 13 earthworks self-delivery gangs at peak
  • Led embankment and piling platform construction, ensuring optimal sequencing of major infrastructure elements
  • Worked closely with the commercial team to track variations, ensure timely compensation event (CE) submissions, and negotiate subcontractor payments
  • Implemented micro-planning strategies for high-risk sections, using MS Project for real-time tracking
  • Provided temporary works briefs for sheet piling, optimizing engineering solutions
  • Mentored Graduate Engineers and Apprentices, fostering technical skills development and career progression

Site Engineer

Balfour Beatty
Slough, Berkshire
09.2019 - 01.2020
  • Managed a 9km motorway stretch with 7 active gangs, overseeing sheet piling and deep excavation works
  • Issued Permit to Dig and prepared Risk Assessment & Method Statements (RAMS) to ensure compliance with safety standards
  • Conducted topographic surveys, aiding in technical queries (TQs) and optimizing designs
  • Led material procurement and haulage coordination, reducing downtime and improving workflow efficiency

Graduate Civil Engineer

Kier Highways
Stafford, Staffordshire
09.2018 - 12.2019
  • Conducted site inspections to ensure conformance to design specifications and safety standards
  • Assisted in cost estimation and feasibility assessments for earthworks, drainage, and structures
  • Provided on-site setting out for self-delivered works, including drainage, modular block walls, and vegetation clearance

Education

Master of Science - Civil Engineering

University of East London

Bachelor of Science - Civil Engineering

Parul University

Skills

  • P6 (Basic)
  • MS Project
  • Earned Value Analysis
  • Cost Forecasting
  • P&L Management
  • Bulk Earthworks
  • Drainage
  • Pavements
  • Structures
  • Utility Diversions
  • Temporary Works Design
  • Sheet Piling
  • Value Engineering
  • Client & Local Authority Liaison
  • Subcontractor Coordination
  • Leadership
  • SMSTS
  • CSCS
  • Temporary Work`s Supervision

sections.external_links.name

Certification

  • CSCS AQP, 02/27
  • SMSTS, 02/26
  • SEATS
  • Temporary Works Supervisor (Authorized Person), 11/25
  • Lean Six Sigma Green Belt Practitioner (KIER)

Custom

Available upon request.

Timeline

Site Agent

Balfour Beatty
01.2022 - 02.2025

Sub Agent

Balfour Beatty
07.2021 - 01.2022

Section Engineer/Sub Agent

Balfour Beatty
01.2020 - 01.2021

Site Engineer

Balfour Beatty
09.2019 - 01.2020

Graduate Civil Engineer

Kier Highways
09.2018 - 12.2019

Bachelor of Science - Civil Engineering

Parul University
  • CSCS AQP, 02/27
  • SMSTS, 02/26
  • SEATS
  • Temporary Works Supervisor (Authorized Person), 11/25
  • Lean Six Sigma Green Belt Practitioner (KIER)

Master of Science - Civil Engineering

University of East London
Sagar Shah