To be part of a progressive firm offering challenging task and opportunity for career advancement and personal growth. PROFILE SUMMARY Sincere, competent and goal-oriented Site Engineer having 7+ years of experience in Site Execution, Coordination and Construction activities. Coordination with - consultants, subcontractors etc. to execute the construction activities within targeted time. Hardworking and self-motivated; with the capability to meet high-pressure deadlines with excellent communication.

Overview

8
8
years of professional experience
7
7
years of post-secondary education
3
3
Languages

Work History

Engineer

J Kumar Infraprojects Ltd
Mumbai
02.2018 - 04.2022

Mumbai Metro Rail Project (MMRDA) – Line-2A/ AC-01

  • Supervised site activities including manpower management while providing technical inputs for methodologies of construction for Structural elements.
  • Deftly supervised structural elements of Metro Project (Don Bosco Station & Dahisar east-west Viaduct Portion).
  • Participated in formal internal design reviews of proposed products and components.
  • Supervised and executed Piling and Pile foundation work with Pile testing.
  • Preparation of Bar Bending Schedule for Pile, Pile Cap, Pier, RCC and PSC Pier Cap, Portal Pier Cap, Pedestals, and Deck slab (Station and Viaduct)
  • Sub-contractor's Measurement, and RA bills.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Conducted training for labours regarding Health and Safety, Scaffolding, Work at height, Materiel lifting.
  • Trained and mentored competent and flexible workforce to meet project needs and promote positive work environment.
  • Developed cost estimates and project specifications for proposals.

Site Engineer

V.M. MATERE INFRASTRUCTURES (INDIA) PRIVATE LIMITED.
Pune
04.2015 - 02.2018

River Bridge and Road Project

  • Supervision of Geo-technical investigation and execution work at site which involved cofferdam for constructing Footings, Pier, Pier Cap and Super-structure activities and approaches.
  • Executed Piling work, Pile foundation and Pile testing activities.
  • Attending contractor / site team meetings regarding planning and execution.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Preparation of Bar Bending Schedule for all Structural elements, shuttering work for super-structure (PSC Box Girder and PSC Voided Slab)
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Prestressing activities and Site calculations for Post-tensioning of cast-in situ box girder and PSC voided slab
  • Developed safety awareness program consisting of construction safety audits and safety meetings.
  • Effectively dealings with clients, contractors
  • Facilitated construction by mapping out utility installed and establishing reference points, grades and elevations.
  • Efficiently prepare daily progress report and weekly progress report.
  • Material testing before every major concrete to determine the quality of material.

Junior Engineer

T AND T INFRA PROJECTS PRIVATE LIMITED.
Pune
11.2014 - 04.2015

ROB Project

  • Supervised site activities including manpower management..
  • Involved in Fabrication of Steel Girder for span length of 24m and Launching using 180 tonnes Crane
  • Used AutoCad drafting software to create a temporary drawings for site execution.
  • Deftly supervised structural elements of flyover, managed post-tensioning activity of Cast in-situ I-Girder.
  • Collaborated with engineering team to determine project specifications.
  • Supervised Open foundation reinforcement fixing, shuttering and concrete pouring activities
  • Preparation of Bar Bending Schedule for Combined footing, Pier, I-Girder etc

Trainee Engineer

S. S. CONSTRUCTION.
Pune
06.2010 - 05.2011

WTP and STP Project

  • Supervised site activities including manpower while providing technical inputs
  • Construction of Water Treatment Plant (1 MLD) and Sewage Treatment Plant (1.2 MLD)
  • Preparation of Bar Bending Schedule for all Structural elements and Sub-contractor's bill
  • Coordination with – client and consultants.
  • Maintained contemporary technical knowledge of engineering concepts.
  • Collaborated with senior engineers on complex projects.

Education

Master of Science - Project and Infrastructure Management

Brunel University, London, ENG
01.2023 - Current

Bachelor of Engineering - Civil Engineering

Savitribai Phule Pune University, Pune
08.2011 - 05.2014

CGPA: 6.36 (First Class)

Diploma - MSBTE - Civil Engineering

B V's Jawaharlal Nehru Institute of Technology, Pune
07.2007 - 02.2011

Percentage - 64.06% (First Class)

SSC ( Xth ) -

Bharati Vidyapeeth's God's Valley International School, Panchgani
04.2006 - 03.2007

Percentage : 62.00% (First Class)

Skills

    Safety planning

undefined

Software

Microsoft Excel, Word, Power Point

AutoCad 2D

Timeline

Brunel University - Master of Science, Project and Infrastructure Management
01.2023 - Current
Engineer - J Kumar Infraprojects Ltd
02.2018 - 04.2022
Site Engineer - V.M. MATERE INFRASTRUCTURES (INDIA) PRIVATE LIMITED.
04.2015 - 02.2018
Junior Engineer - T AND T INFRA PROJECTS PRIVATE LIMITED.
11.2014 - 04.2015
Savitribai Phule Pune University - Bachelor of Engineering , Civil Engineering
08.2011 - 05.2014
Trainee Engineer - S. S. CONSTRUCTION.
06.2010 - 05.2011
B V's Jawaharlal Nehru Institute of Technology - Diploma - MSBTE, Civil Engineering
07.2007 - 02.2011
Bharati Vidyapeeth's God's Valley International School - SSC ( Xth ),
04.2006 - 03.2007
Prithviraj Pradeep JadhavSr Engineer