Summary
Overview
Work History
Education
Skills
References
Timeline
Generic

Praveen Rameshbabu

Summary

Experienced Senior Quantity Surveyor with nearly a decade of expertise in the construction industry, specialising in Procurement, Sub-Contract Management, and experience in working on and delivering projects across Education, Residential, PBSA and Commercial sectors. Adept at managing all phases of project delivery, from pre-construction to completion, while leading teams to achieve successful outcomes. Notable achievements include serving as Commercial Lead on an £85m mixed-use scheme and overseeing a £65m student accommodation project, demonstrating exceptional leadership, negotiation, and contract management skills, particularly in JCT Design & Build contracts. Skilled in navigating complex compliance requirements and driving innovative solutions to address challenges.

Overview

10
10
years of professional experience
7
7
years of post-secondary education

Work History

Senior Quantity Surveyor/ Commercial Lead

Regal London Construction Limited
09.2024 - Current

Regal London Construction Limited | 100 Chalk Farm Road


Redevelopment of 100 Chalk Farm Road, Demolition of existing buildings and Construction of 4 new Cylindrical shaped towers (3 Purpose Built Student Accommodation (PBSA) and 1 HA Block) in very close proximity to the Grade II listed Camden Round House. Value - £65m.


  • Took over the Commercial aspects of the projects from the Pre-Construction team.
  • Was in charge of setting up all Commercial processes on this project and was able to do so due to my early engagement on this project.
  • Hiring and recruitment of SQS/ AQS to the Commercial team
  • Work with the programmer/ planner to set up the Tender Event Schedule whilst navigating the potential impacts of BSR approvals/ rejections.
  • Procurement and management of specialist contractors to contribute towards the BSR gateway 2 submission.
  • Dealing with client team on all matters relating to valuations and changes.
  • Procurement and management of early works packages Demolition and Piling whilst reviewing and finalising the best procurement strategies for high risk packages such as Groundworks, RC Frame, Façade and MEP.
  • Project is on-going at Demolition stage.

Senior Quantity Surveyor/ Commercial Lead

Regal London Construction Limited
04.2022 - 09.2024

Regal London Construction Limited | 37-39 Clarendon Road, Watford


Redevelopment of 37-39 Clarendon Road, Demolition of existing buildings and Construction of 2 new towers (25 Storey Residential tower and 11 Storey Commercial tower). Value - £86m.


  • Joined the team as a no.2 QS but stepped up and took over the scheme in 3 months as the existing Commercial Lead departed.
  • Conclusion of the market testing exercise to set the Project Construction Budget
  • Hiring and recruitment of QS/ AQS and a Freelance QS to the Commercial team
  • Led the Commercial team to ensure that the Procurement is in line with the TES
  • Navigating the liquidation of the RC Frame contractor on a project that is already on a tight programme and dealing with the administrators and helping the business collect information to ensure that the claim from the administrators is dealt with.
  • Dealing with client team on all matters relating to valuations and changes.
  • Management of EOT claims from Façade, Frame, MEP and Drylining contractors.
  • Led the team to ensure that we were prepared for the ISO Audit which was successful.
  • Assisted and mentored my AQS in professional development and University studies.
  • Final Account agreements for key packages whilst ensuring the team is also delivering final accounts while protecting the CVR.
  • Assisted the team in bringing the project to successful Practical Completion on time in 2 phases despite the delay in RC Frame due to the originally appointed contractor going into liquidation.
  • I gradually stepped away from the project towards the end to set up the new Project.

Quantity Surveyor

Bouygues (UK) Limited
12.2019 - 04.2022

Bouygues (UK) Limited | Maitland Park Villas Housing Development. (2-stage tender)


Demolition of part of the existing building and Construction of 4 new blocks (119 units Social and Private) in Camden. Value – Circa £40m.


  • Procurement and Management of the Demolition and Piling packages with risk management and improved margin as part of PCSA works.
  • Working on the 2-stage tender from pricing stage 3 &4 design to assisting in ensuring that the Main Contract is secured.
  • Procurement and Management of key subcontract packages. Overseeing various VE options to manage and maintain the margin and provisions.
  • Tracking and recovering variations and changes.
  • Management of monthly Sub-Contract valuations and processing payments using EDIFICE/ SAP & PayApps.
  • Utilisation of BIM to aid in procurement and clash detection. Dispute resolution and claim management.
  • Negotiating final accounts on complex packages. Management of CVR.
  • Management of Procurement schedule. Management of Project Prelims.

Project Quantity Surveyor

Bouygues (UK) Limited
08.2018 - 12.2019

Bouygues (UK) Limited | Fountains Close Housing Development – Phase 2


Demolition of 20 Flats and Construction of 11 traditional masonry residential units for Richmond Housing Partnership. Site located in Feltham and the project value of £2.5m.


  • Management of ALL Commercial elements on this project from start to handover from Procurement to Final Account.
  • Worked closely with the Project Manager to ensure that procurement is done in line with the TES and the margin is maintained/ improved.
  • Perform risk, value management and cost control during construction.
  • Dispute resolutions and claim management.
  • Management of monthly Sub-Contract valuations and processing payments using EDIFICE/ SAP.
  • Client liaison and Main Contract administration.
  • Client valuations and pricing of Main Contract variations.
  • Overseeing the handover of project to post completion department.

Assistant Quantity Surveyor (Pre-Construction)

Bouygues (UK) Limited
05.2018 - 08.2018

Bouygues (UK) Limited | Leigh Academy School


Demolition of part of the existing building and Construction of 2 new blocks in Blackheath. Value – Circa £50m.


  • Involved in the pricing exercise of stage 3 design to assisting in ensuring that the Main Contract is secured.
  • Preparing of tender packages i.e. scope, BoQ, project requirements for costs checking exercise.
  • Prepared and analysed project costings for tenders, such as materials, quantities, labour and time.
  • Assessing risks and allocation provisions within packages during pre- construction stage.
  • Procurement and management of enabling works.

Assistant Quantity Surveyor

Bouygues (UK) Limited
11.2017 - 05.2018

Bouygues (UK) Limited |Fountains Close Housing Development – Phase 1


Construction of 88 units comprising of 4 Lightweight Steel Frame blocks, 1 traditional block of flats and 12 traditional houses units for Richmond Housing Partnership; Site located in Feltham & Project value of £25m.


  • Took over from a departing Surveyor who was managing all the internal trades.
  • Procurement and management of internal/ finishing trades that was not finalised yet.
  • Monthly Sub-Contract valuations on site and payments using EDIFICE/ SAP.
  • Identified, analysed and developed responses to commercial risks.
  • Provided assistance on contractual claims and disputes.
  • Management of CVR and Prelims of allocated packages.
  • Assisting in the handover of project to post completion department.

Trainee/ Assistant Quantity Surveyor

Bouygues (UK) Limited
06.2015 - 10.2017

Bouygues (UK) Limited | 45 Cannon Street / Citizen M Hotel


Construction of Category-A office building in Central London. Project Value - £35m. Construction of Citizen M Shoreditch village, assisted in procurement in conjunction with 45 CST Project.


  • Prepared subcontract tender documents, contracts, bills of quantities and tender documentation.
  • Procurement of allocated packages from start to finish (Temporary Electrics, Finishing Trades)
  • Assisted the Project Surveyor(s) in Procurement of rest of the packages.
  • Taking off/ Measurement using software such as CAD and Design Review, also used Traditional method using scale ruler and Dimension paper for Drylining package.
  • Took over most of the packages for Sub-Contract packages (with assistance from Managing Surveyor) for Contract Admin when the Project Surveyor left the business.
  • Management of Sub-Contractors and Consultant payments using EDIFICE/ SAP.
  • Tracked changes to the design and/or construction work and adjusted budget projections accordingly.
  • Assisted in Final Accounts
  • Promoted to Assistant Quantity Surveyor on this Project

Education

A-Levels - BTEC Level 3 National Diploma in Construction and the Built Environment

Mayfield High School - Sixth form
London
09.2013 - 07.2015

Bachelor of Science - Quantity Surveying and Commercial Manager BSc (Hons)

University of Westminster
London
09.2015 - 08.2020

Skills

HEALTH & SAFETY TRAININGS

  • CSCS Qualification
  • SMSTS Qualification
  • Emergency First Aid at Work

ACHIEVEMENTS, MEMBERSHIPS & VOLUNTEERING

  • Won Leadership award in 'Innovation for Young People' Led a group of 5 students to come up with a design for autonomous Refuse Collection vehicle in an event called 'School of Dreams' (sponsored by Honda)

References

References available upon request.

Timeline

Senior Quantity Surveyor/ Commercial Lead

Regal London Construction Limited
09.2024 - Current

Senior Quantity Surveyor/ Commercial Lead

Regal London Construction Limited
04.2022 - 09.2024

Quantity Surveyor

Bouygues (UK) Limited
12.2019 - 04.2022

Project Quantity Surveyor

Bouygues (UK) Limited
08.2018 - 12.2019

Assistant Quantity Surveyor (Pre-Construction)

Bouygues (UK) Limited
05.2018 - 08.2018

Assistant Quantity Surveyor

Bouygues (UK) Limited
11.2017 - 05.2018

Bachelor of Science - Quantity Surveying and Commercial Manager BSc (Hons)

University of Westminster
09.2015 - 08.2020

Trainee/ Assistant Quantity Surveyor

Bouygues (UK) Limited
06.2015 - 10.2017

A-Levels - BTEC Level 3 National Diploma in Construction and the Built Environment

Mayfield High School - Sixth form
09.2013 - 07.2015
Praveen Rameshbabu