Paul  Creighton MCIOB

Paul Creighton MCIOB

Senior Construction Manager
Reading,United Kingdom

Summary

Organised construction management professional with extensive experience running productive, profitable sites. Motivated to deliver within cost, timeframe and quality constraints through strategic project planning. Hardworking and passionate to lead high-performing teams by example.

Overview

17
17
years of professional experience
4
4
years of post-secondary education

Work History

Construction Lead

Multiplex Construction Europe Limited
London, Project: 65 Davies Street (£65M), Client: Grosvenor
01.2023 - Current

Led on site delivery of high end finish 200M2 ground floor reception, with multiple trade interfaces, which included:

  • Raised floor with MEP services below
  • Glass fronted passenger lift shaft with patina finishes,
  • Sprayed plaster acoustic ceiling,
  • High end joinery with patina finishes,
  • Stone clad seating
  • Stone floor finishes with acid etching
  • Artistic features including feature screen with patina finishes
  • Facade with patina finishes and sliding glass doors

Construction Lead

Multiplex Construction Europe Limited
London, Project: One Nine Elms (£900M), Client: R&F Properties
09.2021 - 01.2023

Led team of construction managers on construction of 203 hotel rooms across 14 floors up to white box stage. This included

  • Expediting two fully fitted out benchmark guestrooms to assist with Clients decision making process on number of challenging interfaces.
  • Extensive drylining with 21 different room types
  • Heavy MEP install
  • Liquid screed pours on 2 week turnaround

Construction Manager

Multiplex Construction Europe Limited
London, Project: Marble Arch Place (£300M), Client: Almacantar
05.2019 - 08.2021

Led on site delivery for construction of five storey 4,000m2 basement from construction to fit out, which included five screen cinema, pool, gym, spa and business suite. This included:

  • Constructing five acoustic boxes to high acoustic standard.
  • Pool, gym, spa and business suite were fully fitted out to high end finish.
  • Remainder of basement areas consisted of MEP plant rooms, with some very challenging logistical movements involved during construction.
  • Modular containment/pipework to all corridors
  • Complex smoke/vent shaft system to generator room
  • WI block system used
  • Water cutting of concrete slabs
  • Top down construction

Site Manager

Multiplex Construction Europe Limited
London, Project: Marble Arch Place (£300M), Client: Almacantar
07.2017 - 05.2019

Managed on site activities for construction of five storey 4,000m2 basement from construction to fit out, which included five screen cinema, pool, gym, spa and business suite. This included:

  • Constructing five acoustic boxes to high acoustic standard
  • Pool, gym, spa and business suite were fully fitted out to high end finish
  • Remainder of basement areas consisted of MEP plant rooms, with some very challenging logistical movements involved during construction
  • Modular containment/pipework to all corridors
  • Complex smoke/vent shaft system to generator room
  • WI block system used
  • Water cutting of concrete slabs
  • Top down construction

Site Manager

Multiplex Construction Europe Limited
Slough, Project: Langley Park Hotel (£65M), Client: Arab Investments
07.2017 - 05.2019

Managed on site activities on remodelling and extension of existing grade II listed building from 1st fix stage to completion. This included:

  • Constructing extension onto west end of building
  • Forming 15 guest rooms over two floors all whilst protecting listed status of building.
  • Drylining with lots of challenging interfaces
  • Marble finishes to all bathrooms
  • Underfloor heating to bathrooms and external footpaths
  • Re lining of drainage pipes
  • High end joinery finishes
  • Timber ceilings

Site Manager

Multiplex Construction Europe Limited
London, Project: London Wall Place (£340M), Client: Brookfield & Oxford Properties
07.2015 - 07.2017

Managed on site activities for construction of a 310,00 sq ft 12-storey commercial office development from structure to completion. This involved:

  • Completing concrete structure,
  • Drylining to core areas
  • WC fit out to core areas
  • Two storey basement plant room construction and fit out
  • Full goods and passenger lift install

Build Manager

Willmott Dixon Housing
Reading, Project: Regeneration of Dee Park (£150M), Client: Catalyst
04.2014 - 07.2015

Managed the on site activities for the construction of one hundred new homes and a commercial/retail premises from piling stage to completion. This involved:

  • Extensive piling works
  • Construction of concrete structure for commercial/retail units
  • Concrete foundations
  • Block and beam flooring
  • Block and brick structures
  • Take off and order of roof trusses and all internal 1st & 2nd fix joinery
  • Drylining

Site Manager

Wates Construction Limited
Southampton, Project: Boldrewood campus, (£50M) Client: UoS
12.2012 - 04.2014

Managed the on site activities for the construction of a basement research laboratory and ground floor reception. This involved:

  • Construction of block work walls
  • Drylining
  • 1st & 2nd fix joinery
  • Polished concrete floors
  • High end finish reception area with timber ceiling finishes and feature stair

Site Manager

Wates Construction Limited
Ford, Project: HMP Ford Foul drainage & Gym , Foul drainage & Gym (£4M) Client: MoJ
02.2012 - 12.2012

Managed on site activities for the construction of gym building and the replacement of the foul drainage systems which included the construction of new pumping stations. This involved:

  • Timber frame construction of new gym
  • Heavy excavation works working around array of underground services in safe manner
  • Employing specialist drain lining techniques to repair damaged pipework

Site Manager

Wates Construction Limited
Reading, Project: Campus re modelling (£25M), Client: UoR
09.2011 - 02.2012

Managed the on site activities for the remodelling of five grade II listed buildings from demolition to completion to provide new educational/lecture facilities. This involved:

  • Extensive temporary works for retained facades
  • Heavy demolition of internal walls
  • Casting of new concrete slabs
  • Full roof replacements
  • Asbestos strip out
  • Full fit out of new lecture theatre

Construction Manager

Wates Construction International LLC
Al Bateen, Abu Dhabi, Project: School (£25M), Client: Aldar Academies
03.2011 - 09.2011

Managed the on site activities for the fit out of a new British secondary school. This involved:

  • Extensive block work construction internally
  • Drylining
  • Feature stairs
  • Glazed screens to staff areas

Site Manager

Wates Construction Limited
Reading, Project: Campus re modelling (£25M), Client: UoR
08.2010 - 03.2011

Managed the on site activities for the remodelling of five grade II listed buildings from demolition to completion to provide new educational/lecture facilities. This involved:

  • Extensive temporary works for retained facades
  • Heavy demolition of internal walls
  • Casting of new concrete slabs
  • Full roof replacements
  • Asbestos strip out
  • Full fit out of new lecture theatre

Section Manager

Wates Construction Limited
Reading, Project: Commercial Office, (£40m) Client: SEGRO
04.2009 - 08.2010

Managed the on site activities for the construction of a 76,000 sq. ft commercial office building from piling stage to fit out. This involved:

  • Excavation and piling works
  • Steel frame
  • Pre cast concrete floors
  • Drylining
  • Intumescent finishes to car park steel work
  • Internal glazed screen install during fit out
  • Raised floor install

Section Manager

Wates Construction Ltd
Winchester, Project: HMP Winchester, Demolition and rebuild (£20m) Client: MoJ
03.2008 - 04.2009

Managed the on site activities for the demolition and construction of one wing to provide additional prisoner capacity from soft strip to completion. This involved:

  • 78 week programme completed in 72 weeks
  • Soft strip works
  • Heavy demolition
  • Asbestos roof strip
  • Re use of demolition material as piling mat (processed on site) 98% recycled
  • 2 m deep cast in-situ reinforced concrete raft foundations
  • Off site modular construction of cells
  • Brickwork
  • Steel clad roof

Management Trainee

Wates Construction Ltd
Basingstoke, Project: New build, Sir John Hunt Secondary School (£30m) Client: HCC
07.2006 - 03.2008

Assisted with management of on site activities for construction of new secondary school. This involved:

  • Extensive brick and block work
  • Drylining
  • Screeding
  • Sports hall and changing room fit out

Education

Bsc - Construction Management (CIOB Accredited)

Oxford Brookes University
Oxford
09.2002 - 07.2006

Skills

  • Construction Management
  • Building, demolition and renovation
  • Project planning and coordination of sub-contractors
  • Good Knowledge of MEP systems
  • Good knowledge of CDM regulations
  • Ability to work under pressure
  • Construction issue drawing reviews
  • Chairing sub contractor meetings
  • Temporary works management
  • Excellent communication, written and verbal

Interests

Boxer and fitness enthusiast.  I have competed in boxing throughout my life with ten amateur bouts under my belt. I also enjoy weight lifting, running and swimming and try to fit these activities in around my busy work/life schedule in order to maintain a good level of fitness.  I enjoy undertaking home renovation works and Im keen to learn new skills.  Enthusiastic about travel and mountain hiking.  I enjoy spending my weekends with my family.



Timeline

Construction Lead

Multiplex Construction Europe Limited
01.2023 - Current

Construction Lead

Multiplex Construction Europe Limited
09.2021 - 01.2023

Construction Manager

Multiplex Construction Europe Limited
05.2019 - 08.2021

Site Manager

Multiplex Construction Europe Limited
07.2017 - 05.2019

Site Manager

Multiplex Construction Europe Limited
07.2017 - 05.2019

Site Manager

Multiplex Construction Europe Limited
07.2015 - 07.2017

Build Manager

Willmott Dixon Housing
04.2014 - 07.2015

Site Manager

Wates Construction Limited
12.2012 - 04.2014

Site Manager

Wates Construction Limited
02.2012 - 12.2012

Site Manager

Wates Construction Limited
09.2011 - 02.2012

Construction Manager

Wates Construction International LLC
03.2011 - 09.2011

Site Manager

Wates Construction Limited
08.2010 - 03.2011

Section Manager

Wates Construction Limited
04.2009 - 08.2010

Section Manager

Wates Construction Ltd
03.2008 - 04.2009

Management Trainee

Wates Construction Ltd
07.2006 - 03.2008

Bsc - Construction Management (CIOB Accredited)

Oxford Brookes University
09.2002 - 07.2006
Paul Creighton MCIOBSenior Construction Manager