Summary
Overview
Work history
Skills
Affiliations
Timeline
Generic
Paul Bukavesi

Paul Bukavesi

Stoke-on-Trent,STAFFORDSHIRE

Summary


I am a proactive, efficient and conscientious individual with demonstrated experience and skills. An excellent team player with strong leadership and communication skills. Ability to work under pressure and meet deadlines, quick learner with a can do attitude. I am committed to career development, and thrive on learning new skills

Overview

24
24
years of professional experience

Work history

ALO Planner

Balfour Beatty - HS2 Area North Birmingham
Birmingham
11.2021 - Current
  • Developed and executed comprehensive ALO plans in alignment with organisational goals and objectives.
  • Managed ALO Plans documentation, maintaining accurate and up-to-date records for future reference.
  • Handled large volumes of Assurance Check to ensure ALO site Co Ordinates have valid and authorised plans to ensure control risks are followed and monitored.
  • Monitoring safe use of ON Track Plant (OTP) Rail cranes and non rail cranes Lift operations and Lift
    planning across the route Undertake assurance and
    technical compliance evaluations and provide
    guidance in best practice to comply with LOLER
    /BS7121 & Network Rail Standards.

POS & ALO Co-Ordinator

TXM Plant Ltd
Wigan
11.2020 - 11.2021
  • Monitoring the safe use of ON Track Plant (OTP) Rail
    cranes and non rail cranes Lift operations and Lift
    planning across the route Undertake assurance and
    technical compliance evaluations and provide
    guidance in best practice to comply with LOLER
    /BS7121 & Network Rail Standards.
  • Point of Contact on site as POS representative to ensure the correct OTP is fit for use and all personnel are trained and competent to undertake the roles allocated.
  • Assist with OTP planning and ALO planning under Network Rail Standards.
  • Undertaking the role of ALO Co-Ordinator on site to actively monitoring OTP to ensure all personnel keep to control risks as stated on ALO plan.
  • Managed and prioritised varied and busy workload to meet deadlines.
  • Trained and assigned tasks to team members.

POS & ALO Co-ordinator

Amey
Bristol
05.2016 - 07.2020
  • Monitoring the safe use of ON Track Plant (OTP) Rail
    cranes and non rail cranes Lift operations and Lift
    planning across the route Undertake assurance and
    technical compliance evaluations and provide
    guidance in best practice to comply with LOLER
    /BS7121 & Network Rail Standards.
  • Point of contact to complaints and resolved issues.
  • Managed and prioritised varied and busy workload to meet deadlines.
  • Monitored and assigned tasks to team members.
  • Assisted in ALO and OTP planning under the authorised Responsible Manager.
  • Employed under AMEY RAIL LTD on GWEP Project
  • Undertake Safety Critical roles if needs be -MC/CC/COSS

Safety Critical Roles

ABC Electrification - Fission Rail
Stoke-on-Trent
07.2015 - 05.2016

Managing a safe system of work to protect staff
from trains, and also to safeguard trains from
staff and engineering works.

Roles undertaken:

  • Engineering Supervisor
    •Machine Controller
    •Crane Controller
    •Level Crossing Attendant
    •Points Operator
  • Controller of Site Safety

Ganger

Redstone Rail Ltd
Manchester
11.2014 - 07.2015
  • North Wales Journey Time Reduction Project Joint
    Venture Colas and Morgan Sindall Works included
    the:


•including the provision of new walkways
•signal and location case bases
•construction of new retaining structure cable
•troughing and UTX works
•P/Way new Plain line,
•S&C renewals, track drainage, new, replacement
•relocation of signalling and modifications and
•SCC panels
•Plain Line Renewal
•Crane Controller Roles
•COSS/SWL1

Ganger

ISS Labour
Stafford
08.2013 - 11.2014
  • Staffordshire Alliance Project NO: 131108 2014
    Stafford Re-Signalling & Enhancements Project. ISS
    Labour sub-contractor on behalf of Volker Rail at
    Stafford.
  • Works included
  • Trough installation
    •Driver walkways
    • Loc bases
    •Installation of vortoks fencing Ballast walkway
  • Deveg ISS Labour sub-contractor on behalf of
    Atkins at Stafford.
  • Signalling Installation & Associated Works:
    • Survey & Correlation (inc Signal Sighting)
    in accordance with Atkins Rail Construction
    •Standard Methodologies
    •Deliver & Run Lineside /Power/Tail Cables
    •UTX
    •Hollow bearers, buried route & Troughing
    •Installation and Termination of equipment in
    •Existing Locations
    •New Location/ Relay Rooms/ Signal-boxes/
    Control Centres/REB's

PTS Labourer

Skyblue Solutions
Peterborough
08.2012 - 08.2013
  • Managed day-to-day labour duties including heavy lifting, goods transportation and site maintenance.
  • Cleaned up sites after shifts, organising tools and securing supplies in designated storage units.
  • Manually sorted and loaded goods.
  • Kept workspaces clean and organised with regular attention.
  • Followed instructions with strict attention to detail to perform assigned tasks under minimal supervision.
  • Used shovels or heavy equipment to move different materials based on job needs.
  • Platform Extension Renewal
    •Including Drivers Mess Room facility
    • various civils work including the provision of
    •new walkways, signal, location case,REB bases,
    •the installation of disabled access
    •cabletroughing and UTX works
    •P/Way new plain line S&C renewals, track
    •foul and surface water drainage
    •new replacement and relocation of signalling
    •modifications interlocking and SCC panels, new
    and modified telecoms, CCTV DOO, DNO

PTS Labourer

Global Rail Construction
Croydon
09.2011 - 08.2012

Global Rail Construction Ltd Croydon
Global rail Construction sub-contractor on the
behalf of Colas Rail. Crystal Palace Station:

  • Managed day-to-day labour duties including heavy lifting, goods transportation and site maintenance.
  • Cleaned up sites after shifts, organising tools and securing supplies in designated storage units.
  • Manually sorted and loaded goods.
  • Various civil work
  • Provision of new walkways, signal
  • Location Case cabinets
  • Platform Extension works

Armed forces soldier

HM Armed Forces
London
03.2002 - 09.2011
  • Served under the 2nd Battalion the Royal Anglian Infantry Regiment
  • Done Operational training and tours of
  • Bosnia
  • Kosovo
  • Iraq
  • Afghanistan
  • Northern Ireland
  • Prepared for military action with short notice.
  • Trained in combat and weaponry to meet field demands.
  • Remained composed and focused in highly stressful situations.
  • Followed instruction to complete exact requests of senior officers.
  • Represented military unit professionally at ceremonial events and occasions.

Skills

  • Flexible
  • Leadership skills
  • Exceptional communicator
  • Eye for detail
  • ALO & OTP planning methodology
  • Site planning
  • First Aider
  • CSCS
  • SMSTS
  • PTS
  • COSS
  • MC/CC
  • Slinger

Affiliations

  • Rugby
  • Boxing

Timeline

ALO Planner

Balfour Beatty - HS2 Area North Birmingham
11.2021 - Current

POS & ALO Co-Ordinator

TXM Plant Ltd
11.2020 - 11.2021

POS & ALO Co-ordinator

Amey
05.2016 - 07.2020

Safety Critical Roles

ABC Electrification - Fission Rail
07.2015 - 05.2016

Ganger

Redstone Rail Ltd
11.2014 - 07.2015

Ganger

ISS Labour
08.2013 - 11.2014

PTS Labourer

Skyblue Solutions
08.2012 - 08.2013

PTS Labourer

Global Rail Construction
09.2011 - 08.2012

Armed forces soldier

HM Armed Forces
03.2002 - 09.2011
Paul Bukavesi