Summary
Overview
Work History
Education
Skills
Affiliations
Certification
Languages
References
Timeline
Generic

OVIDIU POPA

London,middlesex

Summary

Accomplished professional with extensive expertise in lean manufacturing, material resource planning, and organisational efficiency. Demonstrates strong leadership capability and proactive work attitude, ensuring production line efficiency improvement and quality assurance controls. Adept at risk assessment and mitigation, technical drawing interpretation, and cross-functional team coordination. Proven track record in client relations, staff supervision, and health and safety requirements within residential construction projects. Career goal: to leverage skills in project planning and construction management to drive operational excellence.

Driven professional known for strong leadership abilities and sharp problem-solving skills. Combines strategic planning and team management to ensure smooth project execution and timely completion. Committed to delivering high-quality results and fostering safe, productive work environment in [Desired Position] role.

Seasoned professional with focus on managing construction sites and ensuring project completion within time and budget constraints. Drive project success by leveraging strong leadership skills, comprehensive knowledge of construction processes, and commitment to safety standards. Enhance operational efficiency through effective team management and problem-solving abilities.

Offering strong leadership and organisational skills, with background in team coordination and project management. Knowledgeable about health and safety regulations, budget management, and vendor relations. Ready to use and develop problem-solving, time management, and communication skills in [Desired Position] role.

Experienced Construction Site Manager with knack for leading teams to deliver projects on time and within budget. Known for improving site safety standards and boosting productivity through hands-on management and strategic planning. Successfully managed high-profile projects, resulting in significant cost savings and enhanced client satisfaction.

Driven professional with keen eye for detail and commitment to leading successful construction projects. Demonstrates strong leadership and project management skills, coupled with deep understanding of safety protocols and budget management. Capable of delivering high-quality outcomes while fostering productive team environments.

Motivated individual seeks opportunity leading construction teams to achieve project objectives. Skilled in progress and performance monitoring for reliable assessments. Communicates and collaborates well to unify cross-functional teams.

Forward-thinking Construction Manager with excellent organisation and leadership abilities. Builds relationships quickly to engage teams and clients in activity for continual project progress. Calm under pressure to deliver project completion within agreed constraints.

Adaptable [Job Title] with experience managing high-value construction projects. Leads by example to uphold quality and productivity standards. Briefs staff and contractors on key project requirements and motivates teams to achieve them.

Established Construction Manager skilled in client, team and contractor engagement for positive project outcomes. Monitors performance and identifies delivery gaps, implementing swift solutions to maintain progress. Plans and prioritises well to achieve cost, quality and timeframe objectives.

Ambitious student with excellent planning and organisation skills for good project management. Delegates and negotiates well to achieve desired outcomes. Learns quickly and leads by example to build strengths and competencies for success.

Strategic Construction Manager with demonstrated success assessing project scope and adhering to deadlines. Safety-conscious and detail-orientated with [Number]-year industry background. Well-versed in team leadership and task delegation to drive project progress and foster client satisfaction.

Skilled construction professional with leadership abilities and understanding of [Type] projects. Works great with crew members, contractors and owners to achieve project objectives.

Organised construction management professional with extensive experience running productive, profitable sites. Motivated to deliver within cost, timeframe and quality constraints through strategic project planning. Hardworking and passionate to lead high-performing teams by example.

Experienced [Job Title] driven to achieve timely, cost-efficient, quality projects. Skilled in labour coordination and motivation to lead productive, high-performing site teams. Skilled in negotiation to secure project resources within cost constraints.

Takes on challenging new role harnessing interpersonal skills, collaboration and problem-solving. Driven to deliver high-quality service and consistent results.

Loyal employee with solid understanding of training and mentoring employees. Dedicated team player, proactive and hands-on in task completion.

Energetic employee well-versed in strong communication and organisation skills. Seeks solutions to problems and applies extensive analytical knowledge to findings. Adept at multi-tasking, leading group discussions and managing projects.

Hard-working [Job Title] with strong organisational skills. Achieves company goals through exceptional planning and prioritisation.

Resourceful employee with outstanding knowledge to develop and maintain healthy customer pipeline. Consistently works to attract new business opportunities. Talent in administrative oversight, recruitment processes and customer service improvements.

Organised and dependable [Job Title] with [Number] years of experience. Successful at managing multiple priorities with positive attitude. Willing to take on greater responsibilities to meet team goals.

Committed manager with exceptional leadership, organisational skills and communication abilities leads high-performing cross-functional teams. Leads projects, company operations and business growth.

Enthusiastic [Job Title] with knowledge of resolving customer problems. Works to increase success through effective work strategies and customer service.

Motivated [Job Title] with [Number] years of experience, recognised for assessing operational needs and developing solutions to save costs, improve revenues and drive customer satisfaction. Resourceful and well-organised with excellent leadership and team-building record.

Dedicated [Job Title] with [Number] years of experience. Demonstrated history of meeting company goals and promoting best practices. Thrives under pressure and adapts to challenges with ingenuity and resilience.

Experienced [Job Title] with over [Number] years in [Type] industry. Excellent reputation for resolving problems and improving customer satisfaction. Offers flexible schedule to deliver on team goals.

Reliable [Job Title] with [Type] industry experience. Offers excellent communication and good judgment to effectively meet team needs. Proactive planner and problem solver.

Accomplished [Type] student, pursuing [Area of study] eager to apply knowledge and gain practical experience. Experienced working in team environments. Reputation for hard work, punctuality and willingness to learn new things.

Focused [Job Title] with impressive track record in collaborative, cross-functional teamwork within high-pressure environments. Adept at project planning and managing multiple accounts at once. Dedicated to improving company sales goals and meeting business objectives.

Passionate [Job Title] with experience in data accuracy and management. Independent problem-solver focused on customer service and product development. Works well under tight deadlines.

Customer-oriented [Job Title] with strong history of leading high-performance teams to meet or exceed objectives. Dedicated and hardworking with internal drive to deliver excellence. Tactical team builder with strong background in training and team development.

Enthusiastic [Job Title] with [Number] years of experience. Secures team success through hard work, attention to detail and excellent organisation. Shares [Type] knowledge to achieve results.

Dedicated [Job Title] highly effective in undertaking administrative and programme management tasks. Manages complex data with excellent organisation. Motivated to achieve outstanding success through prompt communication and helpful approach.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Construction site manager

Henry Construction AMRO Partners
London
10.2015 - Current
  • Established positive working environment, encouraging team collaboration.
  • Delivered projects within budget through diligent financial planning and monitoring expenditures closely throughout the process.
  • Facilitated regular site meetings for streamlined communication among staff and contractors.
  • Monitored subcontractor work to maintain quality standards and performance expectations.
  • Coordinated logistics, ensuring smooth operations on site.
  • Managed budget, reducing unnecessary expenditures on-site.
  • Led team to complete projects ahead of schedule.
  • Streamlined construction processes for improved efficiency.
  • Fostered strong relationships with clients for repeat business opportunities.
  • Achieved project deadlines with efficient task delegation.
  • Managed daily operations on site, improving overall productivity.
  • Maintained a clean, organised job site which increased worker productivity and morale.
  • Mitigated potential issues with prompt problem-solving skills.
  • Enhanced site safety by implementing risk management procedures.
  • Handled complex project challenges to keep works on track and within designated timelines.
  • Drove successful completion of multiple construction projects by effective resource allocation.
  • Ensured compliance to building regulations for legal conformity and safety standards.
  • Liaised with local authorities to ensure all construction permits were up-to-date and complied with regulations.
  • Implemented cost control measures, resulting in significant savings over the course of projects.
  • Evaluated construction plans, ensuring accuracy before project commencement.
  • Coordinated labour and construction materials to ensure site met targets outlined in production programme.
  • Directed team of [Number] and ensured staff were equipped with appropriate materials, guidelines and skills to perform well.
  • Provided strong presence on site to coordinate execution of construction works.
  • Organised site's workload and resources to optimise output and productivity.
  • Managed team of [Number] sub-contractor tradespeople.
  • Devised realistic schedules and programmes for construction activities.
  • Strategically deployed construction staff to maximise productivity.
  • Developed overall construction strategy for [Number] regional on-site projects.
  • Successfully led completion of [Number]% of [Number] projects on-time and within budget.
  • Ran multidisciplinary team of [Number] to successfully execute projects valued up to £[Number].
  • Supported proposal efforts to win [Number] [Type] projects since [Year].
  • Owned site-wide compliance to statutory matters and Covid-19 protocols.
  • Oversaw all day-to-day site operations.
  • Reported on progress, problems and information requirements.
  • Supported cost-effective working methods to reduce project outgoings and maximise potential profits.
  • Managed site instructions, daily diary, record sheets and other forms of site reporting.
  • Implemented strict health and safety regulations for continued compliance with site requirements.
  • Delivered short-term plans and performance requirements, holding weekly progress meetings.
  • Communicated with clients and customers to proactively deliver relevant information.
  • Identified and implemented safety, productivity and efficiency improvement initiatives.
  • Led management of site quality assurance in conjunction with QA Manager.
  • Conducted critical pre-installation conferences with contractors, subcontractors and key stakeholders, negotiating best-possible project progression.
  • Performed detailed safety briefings and new team member inductions, reducing onsite risks.
  • Conducted routine quality audits, verifying progression against specifications and initiating corrective actions to remedy concerns.
  • Supervised work of contractors and subcontractors to achieve targets against deadlines.

Working foreman

Atheneum Construction Limited
London
09.2013 - 08.2015
  • Liaised with clients for clear understanding of project scope and requirements.
  • Resolved issues swiftly to ensure minimal disruption in the workflow process.
  • Facilitated meetings with stakeholders, resulting in improved communication flow.
  • Supervised a team of builders, ensuring quality control across projects.
  • Boosted team morale with regular communication and positive reinforcement.
  • Managed project timelines by coordinating various trades and contractors.
  • Delivered training sessions to new starters, enhancing their understanding of job roles.
  • Mediated disputes amongst staff members, promoting a harmonious work environment.
  • Implemented strict health and safety measures, reducing workplace accidents significantly.
  • Ensured site safety for all workers through rigorous risk assessments.
  • Completed project tasks on schedule, contributing to overall completion dates.
  • Communicated effectively with clients about progress updates, fostering trust and transparency relationships.
  • Coordinated equipment maintenance schedules for smooth operational flow on site.
  • Maintained detailed records of all daily operations for future reference and auditing purposes.
  • Evaluated employee performance regularly, providing constructive feedback where needed.
  • Ordered necessary supplies in advance to prevent any delays in work progress..
  • Conducted regular checks on construction tools to avoid any malfunctions during use.
  • Handled construction materials, ensuring proper storage and waste management.
  • Inspected work areas to maintain cleanliness and organisation standards.
  • Adhered strictly to building codes during operations ensuring compliance at all times.
  • Monitored and controlled project risks, proactively identifying and addressing potential issues to prevent delays and disruptions.
  • Conducted regular inspections of construction sites to identify and address potential safety hazards and quality control issues.
  • Managed change orders and modifications to project plans, implementing seamlessly and without compromising quality.
  • Led team of construction workers to complete residential and commercial projects on time, within budget and to quality standards.
  • Managed and allocated resources to optimise productivity and minimise costs.
  • Maintained accurate and up-to-date project documentation to report progress to stakeholders.
  • Guaranteed compliance with all applicable building regulations, safety standards and environmental requirements.
  • Oversaw all aspects of construction projects for successful completion, including planning, scheduling and budgeting.
  • Motivated and inspired diverse team of construction workers, fostering positive and productive work environment.
  • Coordinated site workflow to properly allocate labour and material resources within stringent deadlines.
  • Utilised tools, machinery and equipment following safety measures.
  • Led labouring teams by driving continued productivity to reach targets.
  • Monitored progress to determine timely completion aligned to detailed design specifications.

Floor fitter

Weldon
London
09.2010 - 07.2013
  • Demonstrated versatility by fitting various types of domestic and commercial flooring including carpet, ceramic tile, linoleum, vinyl, wood or related products that cover floors, walls or counters.
  • Conducted consultations for homeowners advising on suitable flooring options.
  • Fitted underlay and gripper rods, creating even floor surfaces.
  • Inspected and measured rooms to plan layout accordingly before starting any project.
  • Repaired damaged flooring sections to restore original appearance.
  • Provided expertise in removing old floor coverings using tools like scrapers or strippers.
  • Worked quickly and efficiently to meet project deadlines without compromising quality of workmanship.
  • Prepared subfloors using self-levelling compound for a smoother finish.
  • Offered assistance in moving furniture from rooms prior to new floor installations.
  • Ensured customer satisfaction by delivering professional service and workmanship.
  • Operated power tools safely whilst cutting floor covering materials.
  • Improved safety by ensuring all flooring met health and safety regulations.
  • Maintained clean workspaces, minimising disruption during fitting process.
  • Prepared floors to be covered with variety of materials.
  • Cut materials to appropriate size and shape to achieve perfect fit.
  • Created smooth and level surfaces for even finish.
  • Finished edges for clean final look.
  • Inspected construction supplies to guarantee high quality.
  • Applied floor adhesive to prevent tiles becoming dislodged.

carpenter

Silver Interiors
London
07.2007 - 06.2010
  • Delivered quality customer service by addressing client concerns promptly and professionally.
  • Cut timber into designated sizes efficiently using saws, enhancing productivity.
  • Coordinated with other construction professionals, promoting a collaborative working environment.
  • Followed detailed architectural drawings, resulting in precise construction projects.
  • Built custom furniture for increased client satisfaction.
  • Adhered strictly to building codes during all carpentry works, ensuring compliance with regulations.
  • Created detailed layouts based on blueprints; accuracy in project execution achieved.
  • Installed wooden structures such as flooring, doors, windows for enhanced property value.
  • Ensured accurate measurements with the proper use of measuring tapes and rulers.
  • Estimated material needs accurately; unnecessary costs avoided.

Education

LEVEL 6 - Construction management

PROQUAL
LONDON
07.2020 -

LEVEL 6 - Construction management

Gheorghe Asachi
Iasi
09.1999 - 11.2004

GCSEs - Business management

Regent College
London

Skills

  • Knowledge of lean manufacturing
  • Finishing procedures knowledge
  • Leadership capability
  • Material resource planning
  • Result oriented
  • Proactive work attitude
  • Organisational efficiency
  • Production line efficiency improvement
  • Wood sanding and staining
  • Risk assessment and mitigation
  • Technical drawing interpretation
  • Quality inspection
  • Scheduling expertise
  • Cross-functional team coordination
  • Client relations
  • Quality Control Analysis
  • Quality assurance controls
  • Staff supervision
  • Health and Safety
  • Project risks and opportunities analysis
  • Quality assurance and control
  • Organised and detail-orientated
  • Power and hand tool operation
  • Project planning
  • Construction planning and team coordination
  • Construction management
  • Health and Safety requirements
  • Residential construction
  • First aider certification
  • Working at heights trained
  • Discrepancy resolving
  • Construction software utilisation
  • Multi-Trade coordination
  • Building management
  • Toolbox talks
  • Construction quality assessments
  • Construction safety inspections
  • Site surveying
  • RLD Health and Safety inspections
  • Waste management
  • Project leadership
  • Environment Health and Safety (EHS) planning
  • Meeting facilitation
  • Site risk assessments
  • Method studies
  • Subcontractor supervision
  • Interior and exterior renovations
  • Construction quality systems
  • Construction documentation management
  • Planning and design
  • Site safety compliance
  • Subcontractor management
  • Site management team supervision
  • Risk mitigation and control
  • Stakeholder management

Affiliations

  • watches, cars, history

Certification

level 6 construction management

Languages

romanian
Native
English
Upper intermediate

References

References available upon request.

Timeline

LEVEL 6 - Construction management

PROQUAL
07.2020 -

Construction site manager

Henry Construction AMRO Partners
10.2015 - Current

Working foreman

Atheneum Construction Limited
09.2013 - 08.2015

Floor fitter

Weldon
09.2010 - 07.2013

carpenter

Silver Interiors
07.2007 - 06.2010

LEVEL 6 - Construction management

Gheorghe Asachi
09.1999 - 11.2004

GCSEs - Business management

Regent College
OVIDIU POPA