Earthworks
Westham & Pevensey
- Assisted with installation of temporary drainage crossings and observed their ongoing maintenance.
- Assisted with welfare unit setup, ensuring units were positioned on a level and stable surface.
- Gained exposure to HAKI stair systems and temporary access arrangements.
- Gained exposure to safe fuel storage arrangements.
