Summary
Overview
Work history
Education
Skills
Accomplishments
Additional Information
Languages
Timeline
Generic
Ngoni Conilius  Chirindo

Ngoni Conilius Chirindo

Erith,United Kingdom

Summary

A dynamic Water, Sanitation and Hygiene Engineer with nine years of hands-on work experience in initiating, designing, implementing and managing water and agricultural engineering-related projects, driven to achieve cost, quality and timeframe targets through strategic planning and project management. I demonstrate first-class leadership, coordination, negotiation, multi-tasking, sound technical knowledge, stakeholder management, creative and innovative thinking abilities and have consistently exceeds quality and cost targets for maximised project efficiency.




Overview

11
11
years of professional experience
17
17
years of post-secondary education

Work history

WASH Technical Expert

Welthungerhilfe (International NGO)
Harare, Zimbabwe
01.2022 - 12.2023
  • Prevented project delays through carrying out diligent site surveys and research to predict and quickly take note of possible risks for a comprehensive piped water network design.
  • Harnessed strong data analysis and modelling skills to deliver complex engineering designs
  • Resolved project challenges through in-depth analysis, excellent communication and stakeholder consultation.
  • Organised information and paperwork for technical bids to secure new contracts and also coordinated contractors, subcontractors and casual labourers to deliver on projects.
  • Established project materials, material cost estimates, project specifications and project implementing methods to maximise on water systems construction productivity.
  • Minimised deviation from estimated project cost parameters through performance and budget monitoring.
  • Motivated site teams to achieve quality results against construction deadlines.
  • Created project reports, specifications and plans for future water and sanitation projects.
  • Monitored and maintained health and safety standards for site compliance.
  • Upheld strict hygiene standards while performing water construction works and distribution in line with World Health Organization regulations.
  • Delivered reliable, high quality technical support to all the project team players

Water and Sanitation Consultant

Skylake Borehole Drilling Pvt Ltd
Harare, Zimbabwe
11.2021 - 01.2022
  • Prepared data collection tools and databases for borehole drilling, borehole construction and borehole capacity testing
  • Involved in team capacity building on engineering competencies for smooth drilling operations and installation of pumps, PV Modules and storage tanks
  • Interpreted the geophysical survey graphs for selected drilling points, technical tender documents and customer technical needs
  • Designed piped water and irrigation systems
  • Prepared technical proposals, drilling permits, borehole capacity testing, siting and design reports
  • Responsible for the selection of borehole drilling and capacity testing equipment, equipment testing, demonstration and management
  • Supervised the borehole drilling processes from geophysical surveys, drilling, casing, gravel packing, sanitary seal installation and capacity testing
  • Georeferenced and mapping of all projects done by the company

WASH Engineer

Africa AHEAD (NGO)
Mutare, Chiredzi, Mwenezi and Chimanimani, Zimbabwe
03.2020 - 12.2021
  • Responded to COVID-19 through Water, Sanitation and Hygiene infrastructure assessments and rehabilitation of healthcare facilities to meet COVID-19 IPC needs
  • Ensured the smooth running of field programmes through attending meetings with stakeholders and field teams
  • coordinated the community, stakeholder, donor and field staff engagements for smooth running of the project.
  • Supervised borehole drilling processes from geophysical surveys, drilling, to borehole capacity testing
  • Designed and installed solar water piped water systems, weirs, earth dams and liquid and solid waste management systems
  • Prepared bill of quantities for all the related Water, Sanitation and Hygiene projects/ infrastructure
  • Conducted water management trainings using sphere standards and guidelines
  • Rehabilitated community Hand/ bush pumps including headworks using community-based approaches
  • Oversaw grant proposal writing, and consolidation of weekly, monthly and end-of-project reports
  • Capacity building and skills transfer to stakeholders and community to improve on project sustainability.
  • Facilitated field logistical support and donor financial and material accountability through acquittals and material inventory.
  • Documented the lessons learnt and good practices during project implementation
  • · Organised information and paperwork for technical bids to secure new contracts and also coordinated contractors, subcontractors and casual labourers to deliver on projects.
  • Produced activity reports taking note of major deliverables, key milestones, limitations, and scope exclusions


Consultant WASH Engineer

Welthungerhilfe (International NGO)
Chimanimani, Zimbabwe
03.2019 - 12.2019
  • Provided water infrastructure development consultancy services in Chimanimani Cyclone Idai Emergency Response, responsible for:
  • Conducted water, sanitation and hygiene infrastructure assessments, troubleshooting and technical planning ensuring the scope of the project is quality, budget consciousness and timely implementation
  • Involved in the designing and installation of piped water networks, production of project specification, blueprints, technical drawings, schematics and computer-generated reports for the project team.
  • Developed bill of quantities and material cost estimates for smooth project implementation
  • Provided capacity building and skills transfer on Water, sanitation and hygiene systems operations and maintenance
  • Led multidisciplinary teams to complete construction projects on time and within budget.
  • Ensured all projects are in line with the project designs with emphasis on durability and sustainability
  • Documented the lessons learnt and good practices during project implementation
  • Produced activity reports identifying major deliverables, highlighting key milestones, identifying limitations and listing scope exclusions


Water Engineer

Green Fuel Pvt Limited
Chipinge, Zimbabwe
06.2015 - 09.2016
  • Supervised a team of more than 30 technical staff that included Engineers, Electricians, Fitters, Plumbers and Boilermakers
  • Provided clean drinking water and good sanitation systems according to WHO standards to more than 500 Estate employees
  • Managed irrigation on a 3 156 Ha sugarcane plantation with 1291Ha under lateral sprinkler irrigation and 1865Ha under centre pivot irrigation systems responsible for water budgeting, Irrigation scheduling, drainage management, system fault diagnosis and maintenance
  • Designed and installed/ constructed irrigation systems (centre pivots, sprinkler, furrow, microjet and drip), pumps, pressure mainlines, farm dams, earth and lined canals including maintenance of the systems.
  • Ran community development projects which include designing irrigation schemes, community Piped Water Schemes, sanitation provision and giving technical assistance to farmers on water-related issues and mechanization
  • Provided bill of quantity computations of water treatment chemicals, plumbing fittings, pumps, centre pivots and lateral sprinkler irrigation spares
  • Supervised the borehole drilling processes, capacity testing, solar-powered ac and dc pump installations and hand pump rehabilitations

Assistant Agricultural Engineer

Tobacco Research Board
Harare, Zimbabwe
01.2013 - 05.2015
  • Supervised a team of more than 20 artisans which included Fitters, Electricians, Mechanics, Plumbers, Builders, Painters and Carpenters
  • Planned, designed, implemented and managed infrastructural development projects and land preparation schedules for the farm section
  • Built and executed thorough pre-delivery inspections of farm machinery, ensuring functionality and performance.
  • Designing, installing and managing irrigation systems (centre pivots, drip and sprinkler), pump sizing and installations
  • Performed diverse machinery fixes, including repairs to mechanical and electrical issues.
  • Ensured the highest quality standards throughout repair and maintenance for optimised equipment performance.
  • Farm equipment calibration, repair and maintenance
  • Carried out accurate, timely repairs, servicing and maintenance on farm machinery and equipment.
  • Utilised abilities in accurate troubleshooting and fault finding to precisely diagnose issues for swift resolution.
  • Constructed systems for solid and liquid waste for the Estate
  • Supervising borehole drilling and pump installations
  • Followed all health and safety guidelines strictly for optimised compliance and staff wellbeing.
  • Gave technical assistance to communities on improved tobacco curing and conditioning facilities, mechanization and irrigation designs
  • Kept a clean, organised work station, maximising efficiency and minimising potential risk.
  • Maintained comprehensive records of repairs, issues and faults for accurate reference.

Education

Master of Science - Water Engineering

Pan African University
Algeria
10.2016 - 09.2018

Bachelor of Science - Agricultural Engineering

Chinhoyi University of Technology
Zimbabwe
08.2010 - 12.2024

Career Certificate - Copying with the Impact of Climate Change in Managing Water Systems,

ZEF/ University of Bonn
German
07.2017 - 07.2017

National Foundation Certificate - Brick and Block Laying

Ministry of Higher and Tertiary Education
Zimbabwe
01.2007 - 11.2007

Skills


  • Innovative, Critical thinker, problem solver, excellent coordination skills, team player and good communicator, Excellent leadership
  • Good command of all Microsoft Office tools, AutoCAD (2D and 3D) and Civil 3D, GPS mapping, and Hydraulic modelling software
  • Infrastructure design, Water supply, project management, maintenance and repair, Storm drainage

Accomplishments

    PERIOD: JAN 2022 -DEC 2023

  • Improved access to safe and adequate water supply and sanitation provision for the Cyclone Idai- Internally Displaced People (IDPs) in Chimanimani District, Zimbabwe, through the project initiation, designing and construction of 3 large solar piped water Network and the construction of 150 Blair ventilated improved pit latrines (BVIP) under the USAID -BHA Emergency Livelihood, WASH and Psychosocial Status Recovery of relocated IDPs and Host Community in Runyararo/ Westend Resettlement Scheme in Chimanimani District (November 2022 to November 2023).
  • Improved access to safe and adequate water to the Cyclone Idai survivor's in Chimanimani District through the project initiation, designing and construction of 5 large Gravity Piped water Network and through coordinating the implementation of 11 large Solar Piped Water Schemes from designing and preparation of tender documents, tender adjudication, drafting Contractor contracts and construction works under the Zimbabwe Idai Recovery Project (ZIRP) phase 2 in Chimanimani District. The pipe network was more than 200km (May 2022 to October 2022)
  • Improved access to safe and adequate water to the Tropical Storm ANA victims in Chimanimani District through the strengthening and extension designing of 4 Gravity Piped Water Network under the Water, Sanitation and Hygiene Emergency Response (January 2022 to March 2022)

  • PERIOD: NOV 2021- JAN 2022


  • Supervised the geophysical surveys and drilling of 68 individual and 23 NGO wet boreholes; Supervised the 6 to 48hour borehole capacity testing for 18 individual boreholes, 23 NGO boreholes and 2 cooperate boreholes; solar-powered borehole sizing/ designing and installation for 52 individual boreholes and 14 NGO boreholes for the Piped water schemes

  • PERIOD: MARCH 2020- DECEMBER 2021


  • Improved safe water supply and hygiene awareness in Mwenezi Rural District through the designing and installation of 2 x 8km solar piped water schemes benefiting more than 8,000 people
  • Increased access to safe water supply and improved sanitation in prioritized communities and schools in Mwenezi through the rehabilitation of 15 Hand pumps covering headworks, headwalls and cattle trough construction and the construction of 25 Blair Ventilated Improved Pit (BVIP) latrines with 13 girl-friendly latrines with Menstrual Hygiene Management (MHM) for adolescent and pre-adolescent girls, 3 disable friendly latrines and 9 boy child latrines
  • Reduced COVID-19 casualties in the Manicaland Province through the rehabilitation of water, sanitation and hygiene related Infrastructure at the Mutare/ Victoria Chitepo Provincial Hospital's COVID-19 Isolation Centre covering structural modifications involving construction works, water and sewer reticulation system, tiling and painting
  • Reduced COVID-19 casualties in the Chimanimani District through the rehabilitation of COVID 19 Isolation Centre at Biriiri District Hospital covering structural modifications involving construction works, plumbing works, tiling, painting and all the COVID-19 Isolation Centre's water and sewer reticulation system
  • Improved solid and infectious waste management at Mutare Sakubva Council Clinic through the establishment of a Waste Management Site covering the modification and construction of a 25kg/hour De-Montfort Incinerator
  • Improved safe and adequate water availability at the Chiredzi General Hospital's COVID-19 isolation centre through the installation of a Solar Powered borehole from the geophysical survey, drilling of a 50m wet borehole, 48-hour capacity testing up to the Installation of a solar-powered water supply system including storage and palisade fencing
  • Reduced COVID-19 casualties in Chiredzi Urban through the rehabilitation of WASH related Infrastructure at Chiredzi Polyclinic covering structural modifications involving construction works, plumbing works, tiling, painting and all the clinic's water and sewer reticulation system

  • PERIOD: MARCH 2019-DECEMBER 2019


  • Improved the availability of safe and adequate water supply to Chimanimani Cyclone Idai's survivor's through the designing and supervision of the Installation/Rehabilitation of 13 gravity Piped Water Schemes covering Schools, Clinics/ Hospitals, Communities and Business Centres which benefit at least 30,000 people in Chimanimani District
  • Improved the sanitation coverage to Chimanimani Cyclone Idai's survivor's through the supervision of the construction of toilets and laundry facilities for the 3 Cyclone Idai survivors settlement camps, 50 upgraded Blair Ventilated Improved Pit (uBVIP) latrines for 5 schools and the rehabilitation of 30 flush toilets for 6 schools Improved the availability of safe and adequate water supply to Chimanimani Cyclone Idai's victims through the supervision of the rehabilitation of 18 Hand pumps covering the hand pump repairs and headworks

  • PERIOD: JUNE 2015 - SEPT 2016

  • Successfully Designed 160 Ha and 62 Ha drip irrigation and lay flat irrigation systems respectively, Chipinge, Zimbabwe
  • Water and electricity bills were significantly reduced at Green Fuel- Rating Middle Sabi by introducing the intensive productive use of water through water measuring with flow meters, proper irrigation scheduling and proper designing of pivot and sprinkler package systems
  • Provided Consultancy in the designing and installation of 10HP and 7HP solar-powered Mutemwa and Mubaiwa irrigation schemes (2015 and 2016 respectively) under Green Fuel community development projects, in Chipinge, Zimbabwe
  • Provided Consultancy in the designing and installation of a microjet irrigation system on a 40-banana plantation, Middle Sabi- Mutema Banana project, Chipinge

  • PERIOD: JANUARY 2013 -MAY 2015

  • Tobacco quality was improved by introducing efficient curing and conditional systems at the Tobacco Research Board.
  • life span of farm machinery and equipment was improved through a well defined preventative maintenance schedule




Additional Information

  • Awarded a full scholarship to pursue a Master's degree in Water Engineering at the Pan African University, awarded in October 2016 by the African Union A study grant to undertake a course in Germany, awarded in July 2016 by the Pan African University

Languages

English
Fluent

Timeline

WASH Technical Expert

Welthungerhilfe (International NGO)
01.2022 - 12.2023

Water and Sanitation Consultant

Skylake Borehole Drilling Pvt Ltd
11.2021 - 01.2022

WASH Engineer

Africa AHEAD (NGO)
03.2020 - 12.2021

Consultant WASH Engineer

Welthungerhilfe (International NGO)
03.2019 - 12.2019

Career Certificate - Copying with the Impact of Climate Change in Managing Water Systems,

ZEF/ University of Bonn
07.2017 - 07.2017

Master of Science - Water Engineering

Pan African University
10.2016 - 09.2018

Water Engineer

Green Fuel Pvt Limited
06.2015 - 09.2016

Assistant Agricultural Engineer

Tobacco Research Board
01.2013 - 05.2015

Bachelor of Science - Agricultural Engineering

Chinhoyi University of Technology
08.2010 - 12.2024

National Foundation Certificate - Brick and Block Laying

Ministry of Higher and Tertiary Education
01.2007 - 11.2007
Ngoni Conilius Chirindo