jsw severfield structural Ltd
Bellary , Indian

Erection Engineer
04 2023 - Current

Job overview

  • Reviewing of structural steel drawings (Both IFC & Engineering drawings).
  • Reviewing of RFI (Request for information) and other site related documents (contract).
  • Studying the layout & loading charts of the Mobile/Crawler cranes and other lifting
    machineries available at site.
  • Studying the erection methodology and checking of the feasibility as persite conditions and
    to highlight the constraints.
  • Studying the project schedule and check the sequence of activities involved.
  • Preparation of fabrication & erection schedule to meet the project schedule.
  • Preparation of material request for erection related items and consumables.
  • Manpower handling based on site requirement and minimize the idle man hours.
  • Preparation of the Method statement based on the erection plan and site requirement.
  • Preparation of crane schedule in accordance with the method statement for proper
    utilization of equipment.
  • Coordination with main contractors, consultants on day-to-day activities and conduct
    meeting to the site team to make them understand the erection methodology and to finish
    the work as per the schedule with required safety and quality measures.
  • Maintain project schedule by monitoring progress and maintaining daily report for day-to-
    day activities.
  • Through all the steel erection steps, solutions for many technical problems during erection
    due to material defect, design problems or site conditions to be set right by my proposals or
    client proposals through RFI (Request for information) approvals or by Work Instruction

Larsen & Toubro
Cochin , Indian

Site Engineer com surveyor
04 2022 - 04 2023

Job overview

  • Ground and building settlement / heaving monitoring
    • Preparation of deformation reports
    • Levelling traverse, staking and as built survey and topographic surveys
    • Make exact measurement and determine property boundaries
    • Provide data relevant to the shape, contour, gravitation, location and elevation
    • Marking the SPT and Taking As-Built
    • Taking Co-ordinates from Auto CAD Drawing
    • Marking the Bearing Piles, Anchor Piles, and Permanent Sheet pile and Temporary
    Sheet Pile
    • Anchor Pile Cap Captive-Nut Alignment work for fixing Tie Rod in Captive-Nut to
    Permanent Sheet Pile in Dock Area
    • Marking Guide Frame Casing and Alignment the Guide Frame for Sheet pile driving
    • Taking As-Built Bearing Pile, Anchor Pile, Sheet Pile, Pile Cap and Civil Works and
    taken approval from client for further works
    • Deformation Monitoring for Coffer Dam Sheet Pile Optical Target area and wherever
    doing construction activity of Excavated area of Temporary Sheet piles
    • Traverse for every six months and whenever client required shall be done
    • Every month cross check all TBM’s
    • Marking the PVD Installation for one method of ground settlement and after
    settlement gauges reading taking
    • Taking approval from client for all piles Before, After Boring and Before concrete survey related work
    • Marking Pile Cap and all Civil Works
    • Dock floor conductor strip and Anchor bar fixing work
  • Dock floor concrete finish work and mention the slope ratio
    • Using Total Station machine
    TS leica06plus,
    TS leica06,
    Sokkia

Megha Engineering & infrastructure private limited
, Indian

Junior Engineer
04 2021 - 03 2022

Job overview

  • Over Head Water Tank and Water Treatment plant
    • Study of Site Drawings and Proper execution at the Site.
    • Arriving quantity of Materials and Proper Material Arrangement.
    • Checking Proper Levels as per the Drawing.
    • Proper Work Allocation to the Supervisors of Labor Contractors.
    • Supervision of Formwork, Reinforcement and Concreting Works.
    • Daily Progress Report with Labor Productivity.
    • Daily/Weekly Labor and Material requirement planning.
    • Understanding of heavy construction machinery

Junior engineer
Cheyyar

Bbs builders
08 2020 - 03 2021

Job overview

  • Arriving quantity of Materials and Proper Material Arrangement.
    • Checking Proper Levels as per the Drawing.
    • Proper Work Allocation to the Supervisors of Labor Contractors.
    • Supervision of Formwork, Reinforcement and Concreting Works.
    • Daily Progress Report with Labor Productivity.
    • Daily/Weekly Labor and Material requirement planning.

Education

purisai Hr.Sec school,purisai

SSLC
06/2015 - 04/2016

purisai Hr.Sec school,purisai

HSC
06/2017 - 03/2018

Swamy Abedhanandha Polytechnic College- Thellar

Diploma in Civil Engineering
07/2018 - 08/2020

Skills

  • Auto CAD
     Completed for High-Rise building design Analysis
     Good Computer Knowledge
     Revit
     MS WORD
     Excel

Languages

Tamil
Native
English
Fluent
Hindi
Advanced
Telugu
Intermediate
Malayalam
Advanced

Timeline

Erection Engineer

jsw severfield structural Ltd
04 2023 - Current

Site Engineer com surveyor

Larsen & Toubro
04 2022 - 04 2023

Junior Engineer

Megha Engineering & infrastructure private limited
04 2021 - 03 2022

Bbs builders

Junior engineer
08 2020 - 03 2021

purisai Hr.Sec school,purisai

SSLC
06/2015 - 04/2016

purisai Hr.Sec school,purisai

HSC
06/2017 - 03/2018

Swamy Abedhanandha Polytechnic College- Thellar

Diploma in Civil Engineering
07/2018 - 08/2020
Narayanan .K