Summary
Overview
Work history
Education
Skills
Accomplishments
Languages
Volunteer Experience
Affiliations
INTERESTS & OTHERS
Certification
Timeline
Generic

Mior M. Siddiq

Birmingham,United Kingdom

Summary

Accomplished professional with extensive expertise in CAD design software, including AutoCAD LT, AutoCAD MEP, and SOLIDWORKS Routing Premium. Proficient in engineering analysis using SOLIDWORKS, FEA, CATIA V5, and ANSYS Simulation Software. Demonstrates strong project management skills with experience in Microsoft Project and GANTT Project. Adept at HVAC systems design and fluid mechanics, with a solid understanding of thermodynamics and sustainable design principles. Committed to delivering high-quality solutions by effectively interpreting client requirements and selecting appropriate materials.

Overview

8
8
years of professional experience
6
6
years of post-secondary education
1
1
Certification

Work history

Mechanical Design Engineer

Torishima Service Solution Europe Ltd
Glasgow, Scotland, United Kingdom
10.2024 - 06.2025
  • Design and build of pumps and cooling water system for water transmission project in Saudi Arabia Desalination Plant.
  • Worked according to client's technical specification modules for cooling water and transmission design and build, utilized head loss calculation study, heat exchangers sizing, pumps and pipeline sizing, designed to ASME and BS-EN codes and standard.
  • Designed and built complete system of cooling water systems of water transmission project for Saudi Arabia Desalination Plant, adhering to ASME B31.3, ASME B34.1 design codes, material specification of ASME B36.19M, B16.5, API 5L Line pipe and fabrication drafting as per ASME Y14.5 standard.
  • Produced full scope of design model of cooling system using SolidWorks-routing and AutoCAD, deliverables; reviewed and updates P&ID and GA layout drawings in line with design comment and feedback by stakeholders.
  • Prepare specifications and datasheet documents of main mechanical component including heat exchangers, pumps, valves and instrument. Monitored closely with supplier and subcontractor works, maintained product according to design.

Project-Design Engineer

Global Combustion System Ltd
Livingston, Scotland, United Kingdom
04.2023 - 08.2023
  • Manufacturer of equipment for combustion systems specifically for the glass-making Industry.
  • Worked in a high standard of quality of production of GA, product layout & arrangement using AutoCAD 2D and 3D as part of project deliverables. Delivered explicitly high skills in maintaining close relationships with clients in the best order to prepare a trail of documents needed for production.
  • Worked closely with the foreman, welder, and storekeeper to motivate them to keep track of time for finishing production and keep all documents in perfect order as part of the company routine to update paper and softcopy of data sheets in specific folders. In other words, making the documents accessible on occasions when the person in charge is away.

Mechanical Maintenance Engineer (Mechanical/Piping)

GS Paperboard & Packaging (Paper Mill plant) Sdn. Bhd
Selangor
03.2019 - 11.2019
  • Design & Build for Combined Heat-Power (CHP) project, Cogeneration Plant that produces 32 MWe supplied power alongside 141 T/h Steam generation.
  • Worked closely with design team in FEED, concept design external pipeline and prepared detailed CAD design for critical pipeline routing including tie-in points according to P&ID and GA layout; proposed preliminary material take-off cost projection. Accommodates project and design team to accelerate EPC work concurrently.
  • Received and reviewed major mechanical equipment and piping construction work packs for the ‘Co-Gen Steam and Power Plant' designs, exercise technical due diligence on design standards according to specs and contract tendered. Items include but not limited to HRSG, GTG, AGB, PHEX, CT and NG and DW feeder. Undertook ASME B31.3, ASME BPVC IX and API standards in governing several technical disputes and decisions.
  • Actively involved in several on-site meeting, work inspections and coordination, which help construction reach highest working standard according to Occupational Health and Safety Regulation (OSHA) with respect to control the projects timeframe and minimise the Loss Time Incident (LTI).

Piping Engineer (Design)

ACFM Engineering & Construction Sdn. Bhd
Kuching, Sarawak, Malaysia
05.2018 - 02.2019
  • Led a Piping Layout design team for EPC Project-Ammonia Purification Plant with completion of 2D and 3D CAD base drawing to be used prior to project execution and achieved the client's positive interpretation towards their goals.
  • Prepared, rectified and analysed submission document and deliverables for piping engineering and technical design which strictly adhere with high quality and standard according to ASME B31.3 Process Piping, API 577, BPVC IX and more, with respect to client's approval for execution.
  • Effectively used P&ID designed by process engineering team by client, scrutiny every detail and developed extractable Piping BoM assisted with 2D isometric drawing which done concurrently. It helped procurement team to expedite material purchasing by cutting time to construct detailed material take-off sheet.
  • Supported project coordinators to simplify major of piping installation work by organised drawing during project execution, cut delay time by average of 30 minutes instead of being inducted in a meeting in essential day work.

Site Engineer (Piping)

E&E Aircon Mechanical Works Sdn. Bhd
Penang
02.2018 - 05.2018
  • Represented and collaborated well with joined company to understand phase and stage of construction, as well in carry site work according to scheduled HVAC piping work packs and site installation.
  • Be a key person at site, as engineer who control and monitor every worker involved in every detailed works as per scheduled. Communicate effectively with main contractor and workers to deliver high performing task with less loophole.
  • Handled preparation of hoisting and installation of 3 units of 17 tonnes Centrifugal chiller in challenging space for crane, success to deliver the work within 4-5 hours hoisting plan.

Mechanical & Electrical Engineer

MRCB Builders Sdn. Bhd
Selangor
05.2017 - 02.2018
  • Actively dealt with client and subcontractors focusing on District Cooling Systems (DCS plant) together with its High-Tension Electrical System (HT Room), managed to handle installation of 3 units of 600RT Centrifugal Chillers and 5 units 11kV~415V Step Down Transformers according to work plan smoothly. Least defective measure occurs during and post installation.
  • Carefully review every document transmittal with high quality and standard applied, helped the company to minimise risks of technical errors and methodological mistakes in major equipment installation plan.
  • Took care of inspections and tests for various mechanical equipment effectively with effective preparation prior to commencement, able to achieve about 80-90% accuracy result for item tested, with low downtime.

Education

Master of Science - Sustainable Engineering-Renewable Energy System and the Environment

University of Strathclyde
Glasgow
09.2023 - 09.2024

B.Eng Degree (Hons) - Mechanical-Automotive Engineering

International Islamic University, Malaysia
Kuala Lumpur, Malaysia
02.2012 - 09.2016

Skills

  • CAD Design Software: AutoCAD LT, AutoCAD MEP AutoCAD Plant 3D, SOLIDWORKS Routing Premium
  • Engineering Analysis Software: SOLIDWORKS, FEA, CATIA V5, ANSYS Simulation Software
  • Project Management Software: Microsoft Project, GANTT Project, Microsoft Visio
  • Technical Training: HVAC design, ASME B313 Process Piping Training, AutoCAD 2D and 3D Competency Training, Lifting Supervisor Training Competency, and First Aider Training Competent Personnel
  • HVAC systems understanding
  • Fluid mechanics expertise
  • Materials selection and handling
  • Sustainable design principles
  • Thermodynamics understanding
  • Client requirement interpretation

Accomplishments

  • Involved in key project scope areas in several industry including water, power, petrochemical, commercial and high-rise buildings sector.
  • Provide crucial technical standard document for pipe list, valve selection, fitting fabrication and weld prep and pump/equipment typical layout according to standard codes such as BS EN, API, ASME B31.4, B31.3, BPVC III, IX, resulting in successful project implementation, minimised design-installation conflict.
  • Produced 2D and 3D piping layout drawings impacting the project's efficiency and readiness prior to the construction phase, for EPCC and turnaround projects.

Languages

Fluently write, speak and communicate in English, Bahasa Malaysia and slightly fluent in Arabic.

Volunteer Experience

Non-Government Social Institution in Malaysia, Member, Malaysia

Affiliations

Board of Engineers Malaysia Graduate Membership, Institute of Engineers Malaysia Membership.

INTERESTS & OTHERS

  • Memberships: Board of Engineers Malaysia Graduate Membership, Institute of Engineers Malaysia Membership.
  • Languages: Fluently write, speak and communicate in English, Bahasa Malaysia and slightly fluent in Arabic.
  • Volunteering: Member of Non-Government Social Institution in Malaysia.

Certification

ASME BPVC, ASME B31, BS-EN 13480, API 570, TEMA

Timeline

Mechanical Design Engineer

Torishima Service Solution Europe Ltd
10.2024 - 06.2025

Master of Science - Sustainable Engineering-Renewable Energy System and the Environment

University of Strathclyde
09.2023 - 09.2024

Project-Design Engineer

Global Combustion System Ltd
04.2023 - 08.2023

Mechanical Maintenance Engineer (Mechanical/Piping)

GS Paperboard & Packaging (Paper Mill plant) Sdn. Bhd
03.2019 - 11.2019

Piping Engineer (Design)

ACFM Engineering & Construction Sdn. Bhd
05.2018 - 02.2019

Site Engineer (Piping)

E&E Aircon Mechanical Works Sdn. Bhd
02.2018 - 05.2018

Mechanical & Electrical Engineer

MRCB Builders Sdn. Bhd
05.2017 - 02.2018

B.Eng Degree (Hons) - Mechanical-Automotive Engineering

International Islamic University, Malaysia
02.2012 - 09.2016
Mior M. Siddiq