Summary
Overview
Work history
Skills
Certification
PROJECTS
Education
Timeline
Generic

Michael Peck

Ipswich,Suffolk

Summary

Principal Detailer with over 35 years' experience in the structural engineering sector, proficient in all aspects of Autocad drawing preparation. I specialise in the production and coordination of reinforced concrete detail drawing packages, reinforcement schedules and structural GA drawings for complex construction projects, including high-rise residential developments, retail developments, major infrastructure, defence facilities and data centres. Throughout my career I have worked closely with structural engineers, architects, contractors and external detailing teams to deliver technically accurate drawings within demanding project programmes. I am recognised for my attention to detail, technical knowledge, time management and commitment to maintaining high CAD standards.

Overview

1
1
Certification
31
31
years of professional experience

Work history

Principal Detailer – Structures

Sweco UK (formerly MLM)
Ipswich, Suffolk
2019.12 - 2026.09
  • Produced reinforced concrete detailing packages from engineering design information.
  • Coordinated with general arrangement drawings, engineers, other disciplines, architects and contractors throughout project delivery.
  • Liaised with external reinforcement detailing companies.
  • Managed drawing issue procedures and document control.
  • Supported junior technicians and provided technical detailing support.
  • Responded to construction queries where required.
  • Successfully delivered reinforced concrete detailing on numerous major developments within clients deadlines.
  • Contributed to the development of Sweco CAD standards and drawing templates.

Technician/Senior Technician

MLM Consulting Engineers
Ipswich, Suffolk
1995.04 - 2019.12
  • Produced reinforced concrete detailing packages from engineering design information.
  • Produced structural steelwork and concrete frame general arrangement drawings from engineering design information.
  • Coordinated with engineers, other disciplines, architects and contractors throughout project delivery.
  • Managed drawing issue procedures and document control.
  • Supported junior technicians and provided technical detailing support.
  • Responded to construction queries where required.
  • Contributed to the development of Sweco CAD standards and drawing templates.
  • Produced remedial works schemes for various smaller scale projects including for insurance subsidence claims.

Skills

  • Reinforced concrete detailing and scheduling
  • AutoCAD drawing production
  • AutoCAD standards and templates
  • Technical knowledge of reinforced concrete construction
  • Coordination with external detailers
  • Effective communication with engineers and contractors
  • Project delivery to programme
  • Excellent time management
  • Attention to detail
  • Technical coordination
  • Technical support for colleagues
  • Document management systems
  • Site inspections and surveys
  • Composure under pressure
  • Team collaboration
  • Basic Revit knowledge

Certification

  • Engineering Technician, Institution of Civil Engineers (EngTech MICE)

PROJECTS

  • Woodberry Down, Hackney - Large residential regeneration development including a 27-storey tower and contiguous piled basements. Lead production of reinforced concrete detailing package including coordination with external RC detailers, drawing management and document control.
  • Neptune Wharf, Deptford - Large residential development of numerous high rise blocks and a contiguous piled basement car park. Lead production of reinforced concrete detailing package including coordination with external RC detailers, drawing management and document control.
  • York Way, Islington - Lead production of reinforced concrete detailing package for numerous high rise residential blocks.
  • Fosters Estate, Hendon - Large residential development of numerous high rise blocks. Lead production of reinforced concrete detailing package including coordination with external RC detailers, drawing management and document control.
  • VLB1A Data Centre, Norway - Lead production of reinforced concrete detailing package for a major data centre project including associated bridge structures.
  • St. Edmunds Terrace - Large residential development with a contiguous piled basement. Produced concrete general arrangement drawings and reinforced concrete detailing package including coordination with architects, drawing management and document control and resolving construction queries from site.
  • Pixash Waste Recycling Centre - Produced concrete general arrangement drawings and reinforced concrete detailing packages for various structures.
  • Jaywick Sewage Treatment Works - Produced reinforced concrete detailing packages for various structures.
  • RAF Lakenheath - Produced steelwork and concrete general arrangement drawings for aircraft hangers and other associated buildings.
  • RAF Mildenhall - Produced steelwork and concrete general arrangement drawings for aircraft hangers and other associated buildings.
  • Rosehill Centre, Ipswich - Produced steelwork and concrete general arrangement drawings for new Co-op superstore and adjoining retail units.
  • Lidl, London Road, Ipswich - Produced steelwork and concrete general arrangement drawings for new Co-op superstore and adjoining retail units.
  • Colindale School - Produced concrete general arrangement drawings and reinforced concrete detailing package.
  • Oasis Academy, Enfield - Produced concrete general arrangement drawings and reinforced concrete detailing package.

Education

  • BTEC Higher National Certificate (HNC) Building Studies (Oct 1993 - July 1995)
  • BTEC Ordinary National Certificate (ONC) Building Studies (Oct 1991 - July 1993)
  • Revit Structure Essentials

Timeline

Principal Detailer – Structures

Sweco UK (formerly MLM)
2019.12 - 2026.09

Technician/Senior Technician

MLM Consulting Engineers
1995.04 - 2019.12
Michael Peck