Mehdi Okhravi Shahbaz

Mehdi Okhravi Shahbaz

Mashhad,Iran

Summary

Seasoned Mechanical Technician and Site Manager with over 30 years of hands-on experience in the construction and commissioning of large-scale oil, gas, petrochemical, and power plant projects across Iran and internationally. Proven leadership in managing EPC contracts, supervising multidisciplinary teams, and delivering complex infrastructure including refineries, condensate and fuel storage tanks, steel structures, and thermal power units. Strong command of industry standards (ASME, API, IEC, ACI), and well-versed in project execution under international joint ventures (JGC, DAELIM, Siemens, Techno-export). Fluent in English, with excellent communication skills for managing stakeholders, conducting technical correspondence, and participating in high-level project meetings. Adept in MS Office, internet tools, and modern project documentation methods. Recognized for reliability, technical acumen, and a results-driven approach in challenging environments.

Overview

34
34
years of professional experience

Work history

Site manager (Phase 14 Gas Refinery)

Neyr Perse, MAPNA Group - South Pars Gas Field
Asalouyeh, Iran
11.2018 - Current

Project Scope: Complete execution of South Pars Phase 14 Gas Refinery including civil, mechanical, electrical, instrumentation, and commissioning works under EPCC contract.

Key Contributions:
• Directed all site-level operations, ensuring full compliance with design specifications, QA/QC procedures, and project timeline.
• Led a multidisciplinary team of over 300 engineers, supervisors, and workers, optimizing productivity and maintaining high safety standards (zero lost-time incidents).
• Developed and enforced daily, weekly, and monthly execution plans in close collaboration with the Planning Department.
• Held regular coordination meetings with subcontractors, resolving engineering conflicts, clarifying technical ambiguities, and accelerating progress on critical path items.
• Supervised resource allocation and managed deployment of heavy equipment, tools, and manpower to achieve peak efficiency across simultaneous work fronts.
• Ensured strict compliance with HSE and quality standards (ASME, API, ACI, IEC, ISO), implementing proactive risk mitigation and field audits.
• Coordinated with project control and finance teams to manage the workshop petty cash, track expenditures, and secure cost-effective procurement of materials.
• Oversaw the Punch List and Open Items closure process, driving field completion and system turnover for pre-commissioning and commissioning.
• Supported the project close-out process, including As-Built documentation, final handover, demobilization, and subcontractor closure.

Site manager (Phase 13 Gas Refinery)

Neyr Perse, MAPNA Group-South Pars Gas Field
Asalouyeh, Iran
12.2016 - 11.2018

Key Contributions:
• Managed execution of civil, mechanical, and electrical works across gas sweetening units, flare systems, and utility packages.
• Oversaw more than 250 field personnel, managing performance, quality benchmarks, and contractual deliverables.
• Ensured construction progress remained on schedule through precise activity sequencing and resource balancing.
• Monitored and reported daily KPIs to project leadership and client representatives, contributing to transparent and data-driven decision-making.
• Conducted joint inspections with QA/QC and client teams to resolve non-conformities, minimize rework, and uphold technical integrity.
• Played a pivotal role in interface management between engineering, planning, HSE, logistics, and commissioning teams.

Site manager (Phase 19 Gas Refinery)

Neyr Perse, MAPNA Group-South Pars Gas Field
Asalouyeh, Iran
05.2015 - 12.2016

Key Contributions:
• Spearheaded installation of process units, mechanical piping, pipe racks, structural works, and underground utilities.
• Optimized construction sequencing to accelerate critical activities during tight project milestones.
• Managed field revisions, redlining drawings, and responding to RFIs in collaboration with engineering support teams.
• Facilitated punch list coordination and handover of pre-commissioned systems to commissioning teams.

Deputy site manager (Phase 13 Gas Refinery)

Neyr Perse, MAPNA Group- South Pars Gas Field
05.2013 - 04.2015

Key Contributions:
• Assisted in overseeing construction, inspection, and logistics coordination for utility and process units.
• Supervised preparation of daily progress reports and manpower logs.
• Handled field-level technical clarifications and facilitated meetings with QA/QC and engineering to close open items.

Deputy site manager (Iran LNG Power Plant)

Neyr Perse, MAPNA Group
Asalouyeh, Iran
07.2008 - 05.2013

Key Contributions:
• Oversaw construction of LNG-related infrastructure including tanks, piping, steel structures, and underground works.
• Managed HSE compliance, procurement follow-up, and subcontractor performance tracking.
• Coordinated document control and contributed to preparation of As-Built packages.

Site manager (Aleppo International Airport)

Neyr Perse
Aleppo, Syria
06.2007 - 06.2008

Key Contributions:
• Managed complete site construction of aviation refueling station infrastructure, piping, and tank installation.
• Coordinated procurement, materials delivery, and workforce management under international logistics constraints.
• Maintained project communication with local authorities and airport technical consultants.

Site manager (Tank construction-phases 6,7,8)

Neyr Perse
Asalouyeh, Iran
06.2005 - 05.2007

Client Supervision: JGC, TOYO, DELIM (Japan / Korea)

Key Contribution:
• Delivered 17 storage tanks (fuel, water, condensate) in accordance with API, ASME, and EPC standards.
• Coordinated daily reporting, progress control, inspection scheduling, and technical team mobilization.

Site manager (TABARESTAN Company)

Tehran Cement Blending Hall
Tehran, Iran
08.2003 - 06.2005

Key Contributions:

  • Collaborated with architects and engineers to ensure design vision accuracy.
  • Fostered good relationships with clients, securing repeat business opportunities.
  • Ensured safety protocols for minimal workplace accidents.
  • Addressed issues promptly, maintaining uninterrupted work schedules.

Boiler Representative (South Perse Phase 1)

Nasb Niroo Company
Asalouyeh, Iran
07.2001 - 07.2003

key Contribution:

  • Supervised installation of 3×80 tons boilers under C.C.T. Italy.

Subcontractor

Nasb Niroo Company
Shazand Thermal Power Plant, Iran
06.1999 - 07.2001

Key Contribution:

  • Installed boiler unit 3 and carried out piping works.

Subcontractor

Pol-Sar Company
SAIPA Car Manufacturing Factory – Tehran, Iran
06.1998 - 06.1999

Key Contribution:

  • Installed stainless steel piping
  • Scheduled deliveries of materials to facilitate smooth flow of operations onsite.
  • Managed and coordinated subcontractors onsite, ensuring completion of projects on time.

Subcontractor

Nasb Niroo Company
Karaj Power Plant, Iran
06.1998 - 06.1999

Key Contribution:

  • Installed 15,000 in/Dia B.O.P. piping and auxiliary boiler system.

Subcontractor

Nasb Niroo Company
Jajarm Aluminum Plant, Iran
05.1996 - 06.1998

Key Contribution:

  • Installed 800 tons of steel structures and belt conveyors under supervision of Slovakian company Techno-export.
  • Regularly updated project progress reports, enhancing transparency in communication.

Head Of Execution Team

Nasb Niroo Company
Alumina Plant – Jajarm, Iran
04.1996 - 05.1998

Key Contribution:

  • Installed 32 fuel and process tanks.

Welding QC Inspector

Nasb Niroo Company
Gilan Combined Cycle Power Plant – Iran
05.1994 - 03.1996

Key Contribution:

  • Oversaw turbine hall welding works under Siemens supervision.

Military Service

Engineering Department
Tehran, Iran
04.1992 - 04.1994

Part-time Fabricator

Momeni Machinery Factory
Iran
03.1991 - 03.1992

Key Contribution:

  • Participated in fabrication of aluminum wheat bunkers (first in Iran).

Education

Mechanical Engineering

Tehran Faculty Of Mechanic
Tehran,Iran

Skills

Key Skills

-Project Execution & Site Management
-Construction Supervision & Coordination
-HSE Compliance & Quality Control
-EPCC Contract Management
-Resource Allocation & Budget Control
-Strong Communication & Leadership
-Technical Standards (ASME, API, ANSI, ACI, IEC, etc)


Computer Skills
-MS Office (Excel, Word)
-Internet & Project Communication Tools
-General Digital Literacy for Engineering
Needs

Languages

English
Advanced
Arabic
Intermediate

Timeline

Site manager (Phase 14 Gas Refinery)

Neyr Perse, MAPNA Group - South Pars Gas Field
11.2018 - Current

Site manager (Phase 13 Gas Refinery)

Neyr Perse, MAPNA Group-South Pars Gas Field
12.2016 - 11.2018

Site manager (Phase 19 Gas Refinery)

Neyr Perse, MAPNA Group-South Pars Gas Field
05.2015 - 12.2016

Deputy site manager (Phase 13 Gas Refinery)

Neyr Perse, MAPNA Group- South Pars Gas Field
05.2013 - 04.2015

Deputy site manager (Iran LNG Power Plant)

Neyr Perse, MAPNA Group
07.2008 - 05.2013

Site manager (Aleppo International Airport)

Neyr Perse
06.2007 - 06.2008

Site manager (Tank construction-phases 6,7,8)

Neyr Perse
06.2005 - 05.2007

Site manager (TABARESTAN Company)

Tehran Cement Blending Hall
08.2003 - 06.2005

Boiler Representative (South Perse Phase 1)

Nasb Niroo Company
07.2001 - 07.2003

Subcontractor

Nasb Niroo Company
06.1999 - 07.2001

Subcontractor

Pol-Sar Company
06.1998 - 06.1999

Subcontractor

Nasb Niroo Company
06.1998 - 06.1999

Subcontractor

Nasb Niroo Company
05.1996 - 06.1998

Head Of Execution Team

Nasb Niroo Company
04.1996 - 05.1998

Welding QC Inspector

Nasb Niroo Company
05.1994 - 03.1996

Military Service

Engineering Department
04.1992 - 04.1994

Part-time Fabricator

Momeni Machinery Factory
03.1991 - 03.1992

Mechanical Engineering

Tehran Faculty Of Mechanic
Mehdi Okhravi Shahbaz