Summary
Overview
Work history
Skills
Timeline
Generic

Matthew Archibald

London raynes park,United Kingdom

Summary

Dedicated professional with a strong foundation in communication, problem solving, and time keeping. Demonstrates exceptional customer service skills and driving experience, complemented by expertise in equipment oversight. Committed to leveraging these competencies to achieve career growth and contribute effectively to organisational goals.

Overview

16
16
years of professional experience

Work history

Concrete Boom Pump Operator

Coonan Concrete pumping
2023.01 - 2026.01
  • Operating 21m, 27m and 36m mobile concrete boom pumps for residential and commercial sites, including driving and on-site operation. Safely set up and level pumps, deploy outriggers and secure equipment in accordance with method statements and site risk assessments. Coordinate with site teams to ensure timely placement of concrete and maintain high standards of workmanship and customer service. Perform daily inspections, routine maintenance and cleaning to ensure reliable pump performance and compliance with safety regulations. Report and record site activities, maintenance actions and any incidents to supervisors.
  • Prepared thorough reports documenting all activities related to pump operations and maintenance, aiding in quality control measures.
  • Ensured optimal pump performance by conducting regular maintenance checks.

Concrete Pump Operator

Asheville Aggregates
2021.01 - 2022.01
  • Duties: Operated trailer mounted. Driving and operating on sites. Laying pipelines before pumping concrete and then taking them back up again in a safe and efficient manner. Ensuring all customers received a high level of customer service and jobs were done to an extremely high standard. Maintaining the cleanliness and operation of the pump.

Plant Fitter

Schwing
2020.01 - 2021.01
  • SEE PREVIOUS

Concrete HGV Boom Operator

Hardcrete
2018.01 - 2020.01
  • Duties: Operated trailer mounted and boom concrete pumps. Driving and operating on sites. Laying pipelines before pumping concrete and then taking them back up again in a safe and efficient manner. Ensuring all customers received a high level of customer service and jobs were done to an extremely high standard. Maintaining the cleanliness and operation of the pump.

Plant Fitter

Putzmister
2017.01 - 2018.01
  • Duties: Mobile fitter remotely working in and around the London area. Working on call responding to all jobs where machines needed mechanical attention, diagnosing, repair and maintenance. Communicating with head office about parts required. Visiting customers in the south of England to ensure all their needs were met as a customer of Putzmister.

Plant Fitter

Schwing
2010.01 - 2017.01
  • Duties: Diagnosing, repairing and maintenance on concrete pumps. Travelling to work sites for inspections. Welding and fabrication. Delivery and collection of new and old HGV concrete pumps. Erection of on-site static place in boom. Commissioning of new static and mobile concrete pumps. Handover operator Training / query of pumps to customers.

Skills

  • Communication
  • Problem solving
  • Time keeping
  • Customer service
  • Driving experience
  • Equipment oversight

Timeline

Concrete Boom Pump Operator

Coonan Concrete pumping
2023.01 - 2026.01

Concrete Pump Operator

Asheville Aggregates
2021.01 - 2022.01

Plant Fitter

Schwing
2020.01 - 2021.01

Concrete HGV Boom Operator

Hardcrete
2018.01 - 2020.01

Plant Fitter

Putzmister
2017.01 - 2018.01

Plant Fitter

Schwing
2010.01 - 2017.01
Matthew Archibald