I have overseen all the Groups Facades Schemes which have varied from various types of Cladding Systems including Rain Screen and Render
These schemes have varied in size with values from £100k through to £3.5m (One City Park Bradford, Port Loop Birmingham and Lovell House In Leeds to mention but a few)
My duties include all aspects of Health & Safety including implementing the Company Wide management site setup to standardise the documents and site setup for all to follow schemes to use / follow
Controlling / Managing several live schemes at any one-time offering leadership and support to the Site Teams I work alongside and developing their careers
Co-ordination with the commercial teams is also a key item for my role and bringing the scheme through to completion on time as well as on budget
Operations / Contracts Director
3C Group
05.2023 - Current
During my time at 3c Group I have overseen all the Groups Schemes which have varied from various types of Builds form Refurbishments / Shop / Bar Fit Outs to New Build Schemes
These schemes have varied in size with values from £100k through to £1.5m Salt House Bar in Barnsley, Dollys Desserts in Barnsley, The Works in Barnsley and Ant Marketing Sheffield Office Suite to mention but a few)
My duties include all aspects of Overseeing the Works, Health & Safety including implementing the Company Wide management site setup to standardise the documents and site setup for all to follow schemes to use / follow
Controlling / Managing several live schemes at any one-time offering leadership and support to the Site Teams I work alongside and developing their careers
Co-ordination with the commercial teams is also a key item for my role and bringing the scheme through to completion on time as well as on budget
Working Closely with the Financial Director and Managing Director throughout each Scheme as well as planning all Future Schemes
Operations / Contracts Manager
Horbury Group
06.2015 - 05.2021
During my time at Horbury Group I have been promoted from Operations Manager to Contracts Manager
I have over seen all the Groups Facades Schemes which have varied from various types of Cladding Systems including Rain Screen and Render
These schemes have varied in size with values from £100k through to £3.5m (Charles Street Sheffield, De Montfort University Leicester, the Vita Building Manchester & Gore Street Manchester to mention but a few)
My duties include all aspects of Health & Safety including implementing the Company Wide management site setup to standardise the documents and site setup for all to follow schemes to use / follow
Controlling / Managing several live schemes at any one-time offering leadership and support to the Site Teams I work alongside and developing their careers
Co-ordination with the commercial teams is also a key item for my role and bringing the scheme through to completion on time as well as on budget
Senior Site Manager
ESH Property Services
10.2012 - 06.2015
Refurbishment of 8 number bedsits into 4 number 3-bedroom homes and 5 number new build code level 3 homes both 2 and 3 bedrooms
Client = Guinness Northern Counties
25 new build code level 3 homes 2, 3 and 4 bedrooms
Client = Home Group
42 New Build code level 3 homes 2 and 3 bedroom
Block of 9 care and support apartments
Client = Home Group
Client = Riverside
Owner
MJL Joinery
07.2011 - 10.2012
Self-employed joinery contractor
Conducting all aspects of first, second and third fix joinery work
Including kitchen and bedroom fitting; window and door fitting and fascia, soffit and cladding work in both wood and PVC
Maintained all own financial records, pricing, invoicing, and bookkeeping
Senior Site Manager
Bramall Construction
01.2002 - 01.2011
(2002 – 2004 Joiner; promoted internally to Site Supervisor 2004-2007; promoted again internally to Site Manager 2007-2009 and promoted to Senior Site Manager 2009
During my time at Bramall Construction, I was put forward for a gold award with the NHBC for my safety record
Site Manager for the Decent Homes schemes in Doncaster over seeing a total of 8 separate schemes with a total of around of 1500 council homes for refurbishment
Site Manager for 16 2 and 3 bed roomed code level 4 dwellings in Nottingham for Chevin Housing
Site Manager for 10 2 and 3 bed roomed code level 6 dwellings and communal areas in Slough for SSE
Site Manager for phase 1 of the extra care facility in Soham
A total of 80 flats and various communal areas
Site Manager for 21 code level 4 flats and 20 code level 4 houses to Sandybed Lane in Scarborough
It was my responsibility to maintain the following: All Site inductions, Health and Safety including all required permits, Material Requisitions, Weekly Timesheets for all employed operatives, Material call offs for site delivery, Weekly plant and material delivery reports, Weekly programs of work, Site team meetings including sub-contractors, all weekly reports to my contract manager and head office, Monthly NHBC visits and inspections
Joiner
RH Joinery
01.2000 - 01.2002
All aspects of joinery from first fix second fix and final fix joinery to kitchen fitting and doors and window fitting