Summary
Overview
Work history
Education
Skills
Timeline
Generic

Mark Britnell

Dover,Kent

Summary

Highly skilled and certified professional with extensive expertise in construction and utilities operations and site management. Proficient in operating a range of heavy machinery, including NPORS-certified 360 excavators (10 tonnes and above), dumpers, skid steers (Bobcat), telehandlers, and ride-on rollers. Demonstrates advanced capabilities in deep excavation and trench support, supported by NRSWA Operative and Supervisor certifications. Holds a CSCS Power and Utilities card, NVQ Level 2 in Construction Operations, and Water Hygiene certification. Adept at ensuring safety compliance with First Aid training.

Overview

16
16
years of professional experience
5
5
years of post-secondary education

Work history

Team leader

Payne Construction
, Kent
2025.10 - 2026.02

Assisted with construction tasks on building sites, including 278 work.

Ganger

Clancy Docwra
, Kent
2025.07 - 2025.10

Performed repairs and maintenance on the southern water contract. Managed customer interactions and resolved complaints about the work conducted. Coordinated with my supervisor on rare occasions when complaints could not be satisfactorily concluded.

Civils Supervisor

Arc Construction
London
2024.09 - 2025.07
  • Supervised construction teams to achieve timely and efficient project execution.
  • Coordinated materials procurement, aligning resources with project timelines.
  • Facilitated traffic management plans with meticulous planning.
  • Liaised with clients, maintaining strong relationships and communication lines open throughout projects' duration.
  • Ensured regulatory compliance by implementing effective documentation and filing procedures.

Civil engineer/Supervisor

CK Civils
, All across the UK
2014.08 - 2024.10
  • assisted project managers with diverse tasks and communicated effectively with designers and other personnel.
  • Surveyed sites, collected measurements and assessed project conditions.
  • Maintained project materials, including blueprints, schematics and specifications,
  • Advised project manager regarding construction material costs and quantity calculations.
  • resolved conflicts between clients, team members and management.
  • estimated construction costs for projects.
  • Conducted weekly status updates while collaborating with unions, workers and inspectors.
  • wrote daily detailed reports logging work progress for quality assurance purposes.
  • Attended meetings and site locations to gather data for project work
  • Produced and issued precise technical specifications and data sheets
  • Surveyed project sites to establish reference points to guide construction
  • Reviewed other team members design calculations to check for precision
  • Developed and implemented engineering solutions to a variety of project and design issues.
  • Monitor construction site progress and managed routine and complex issues.
  • Coordinated interactions between client and field staff.
  • Reinstated in various materials (concrete, tarmac, block paving, slabs, verge)
  • Concrete form work and shuttering.
  • Ducting installation.
  • Cable Pulling.
  • Brickwork.
  • Pit building.
  • Fencing.
  • Drainage.
  • Manhole building.
  • Resin bonding.

Water Engineer

Complete Moling Services
, Kent and London
2010.04 - 2014.08
  • Executed repair and maintenance of water infrastructure to prolong system longevity.
  • Layed water mains to ensure reliable water distribution.
  • Supply pipe renewal.
  • Pipe bursting.
  • Conducted electric fusion processes for joining pipe sections securely.
  • Performed moling operations to create underground tunnels for pipe installation.
  • Conducted reinstatement of excavated areas to restore surface integrity.

Education

GCSEs -

Astor Secondary School
Dover, Kent
1993.09 - 1998.06

Skills

NRSWA Operative

NRSWA Supervisor

NPORS 10 tonne and above 360 excavator

NPORS Dumper

NPORS Skidsteer (Bobcat)

NPORS Telehandler

NPORS Ride on roller

First Aid

NPORS Deep excavation and trench support

CSCS Power and Utilities

Water Hygiene

NVQ level 2 Construction operations

Timeline

Team leader

Payne Construction
2025.10 - 2026.02

Ganger

Clancy Docwra
2025.07 - 2025.10

Civils Supervisor

Arc Construction
2024.09 - 2025.07

Civil engineer/Supervisor

CK Civils
2014.08 - 2024.10

Water Engineer

Complete Moling Services
2010.04 - 2014.08

GCSEs -

Astor Secondary School
1993.09 - 1998.06
Mark Britnell