Summary
Overview
Work history
Education
Skills
Interests
Languages
Timeline
Generic

marcus slimane

Aldershot,Hampshire

Summary

I am currently a director of a very sucsuccessful construction company with 5 employees. we do all aspects of building including, renovations, extensions, loft conversions, new builds

Hardworking construction professional skilled in supervising and motivating committed site teams. Plans staff and resources strategically to achieve project targets. Inspects and monitors work progress to deliver timely, quality results. Sophisticated [Job Title] offering extensive knowledge base of wood quality and composition. Collaborates successfully with home owners to select finest building materials. Confident using wide range of multi-trade skills to complete diverse project work to high standard.

Overview

19
19
years of professional experience
3
3
years of post-secondary education

Work history

Carpenter

Burhill Properties Ltd
London, Surrey
01.2005 - 01.2011
  • Minimised accidents and near misses by adhering to health and safety regulations.
  • Evaluated woodwork and materials to determine quality.
  • Lifted, carried and moved heavy objects to designated locations.
  • Completed snagging and finishing to achieve faultless results.
  • Cleared away debris and removed waste to maintain cleanliness and quality standards.
  • Maintained safe and clean working environment for compliance with workplace health and safety policies.
  • Prioritised jobs effectively to meet daily construction deadlines.
  • Kept building and construction areas clear and tidy, reducing site risks.

Carpenter

Self employed
Melbourne
07.2012 - 11.2012
  • Running sites, organizing deliveries/ materials, General handy man all round, have a lot of experience on building sites
  • I have worked with a number of trades, Also done work experience 1 day a week for 2 years when i was at school
  • First fix etc framing, roofs -Second fix etc hanging doors, skirting, architrave -Kitchens, flooring laminate and solid wood, Fascia Soffit, guttering, fencing etc, job working as a painter, doing jobs as basic as rubbing down walls and door frames, To rolling finished coats on walls and ceilings, To gloss work on frames, doors and windows.

CARPENTER/JOINER

REWARD HOTEL PROJECTS
Melbourne
06.2013 - 10.2013
  • Renovating 4 different hotels all around Melbourne region, Roles in the job including bathroom fit outs, fitting vanity worktops/vanity units, bathroom mirrors and bathroom fittings
  • Also I fit bed heads, ledges, tv units, large double and triple wardrobes, mini bar features including Cesar stone, Perspex with a shelf unit
  • Fitting disable bathrooms and disable room working from specified plans and drawings, doing reception fit outs including desks, worktops and false ceilings.

Carpenter

A40 group
Melbourne
11.2013 - 07.2014
  • Repaired and installed doors, windows and cabinets in houses, apartments or offices.
  • Minimised accidents and near misses by adhering to health and safety regulations.
  • Evaluated woodwork and materials to determine quality.
  • Lifted, carried and moved heavy objects to designated locations.
  • Erected large woodwork constructions to detailed project blueprints.
  • Repaired structural damage to restore homes and businesses.
  • Managed top-quality kitchen and bathroom renovations on time and on budget.
  • Performed repair work on various structures and fittings, restoring quality and safety.
  • Installed floor joists, trusses and rafters.

Carpenter

Pathway Construction
Melbourne
07.2014 - 09.2016
  • Repaired and installed doors, windows and cabinets in houses, apartments or offices.
  • Minimised accidents and near misses by adhering to health and safety regulations.
  • Evaluated woodwork and materials to determine quality.
  • Lifted, carried and moved heavy objects to designated locations.
  • Measured, cut and shaped wood to meet project requirements.
  • Surpassed customer expectations, receiving consistently positive feedback.
  • Measured and cut countertops, recesses and joints to align installations.
  • Conducted [Number]% project work within agreed timescales.
  • Built bespoke kitchen islands and cabinets according to customer selections and requirements.
  • Fitting kitchens to a high standard in large apartment blocks

Kitchen fitter

Crown Installations
Melbourne
10.2016 - 11.2019
  • Selected backsplash and accent tiles to complement appliances and cabinets.
  • Clearly identified and marked pipe and cable locations to reduce risks.
  • Removed debris and cleaned workspaces to reduce client inconvenience.
  • Installed electric underfloor heating components to enhance kitchen functionality.
  • fitting bespoke kitchens
  • fitting wardrobes
  • fitting bathroom cabinets

Carpenter foreman

Excalibur
East Molesey, Surrey
11.2019 - 11.2020
  • Accurately interpreted blueprints, [Type] drawings and [Type] specifications to effectively determine project layouts and materials required.
  • Conducted on-site duties in accordance with workplace health and safety regulations, consistently ensuring team members' compliance through diligent [Action] and [Action].
  • Maintained adequate condition and stock of required materials and equipment including [Type] and [Equipment], placing [Timeframe] refill orders according to demand.
  • Monitored and assessed Carpenters' workmanship on [Timeframe] basis to maintain cohesive, professional standards of work.
  • Assessed construction constraints to appropriately determine planning requirements.
  • Checked construction materials met safety, quality and compliance standards.
  • Monitored site productivity levels to achieve projects within budgets and deadlines.
  • Updated managers on project progress for improved forward planning.
  • Scheduled staff and contractor shifts to meet construction project demands.

Carpenter foreman

Weybridge Construction
Weybridge, Surrey
12.2020 - Current
  • I am currently the director of a very successful construction company, we do renovations, extensions, loft conversion, new builds and all aspects of building
  • Accurately interpreted blueprints, [Type] drawings and [Type] specifications to effectively determine project layouts and materials required.
  • Conducted on-site duties in accordance with workplace health and safety regulations, consistently ensuring team members' compliance through diligent [Action] and [Action].
  • Maintained adequate condition and stock of required materials and equipment including [Type] and [Equipment], placing [Timeframe] refill orders according to demand.
  • Monitored and assessed Carpenters' workmanship on [Timeframe] basis to maintain cohesive, professional standards of work.
  • Scheduled staff and contractor shifts to meet construction project demands.
  • Utilised tools, machinery and equipment following safety measures.
  • Verified projects cost to align with allotted budget.
  • Organised material supplies to facilitate smooth construction works.
  • Recruited and onboarded required contractors and subcontractors for maximised project efficiency.
  • Supervised ongoing construction works, verifying against specifications.
  • Updated work progress records for continued project monitoring.
  • Maintained site health and safety compliance for safe, secure working environments.

Education

NVQ Level 2 - Carpentry

Guildford
Guildford, Surrey
08.2006 - 04.2009

undefined

Rydens School
2006

Skills

  • Cost estimations
  • Progress reporting
  • Client relations
  • Carpentry
  • Health and safety compliance
  • Operations management
  • Worksite inductions
  • Resource management
  • Quotations
  • High-value project management
  • Team management
  • Project estimation and bidding
  • Job planning
  • Construction management
  • Residential construction
  • Job site management
  • Materials estimating
  • Preventive and reparative maintenance

Interests

My favourite hobby is playing football I have played for most of my life for a number of teams, i also enjoy playing golf, I like socializing with my friends and going to the gym

Languages

English
Native

Timeline

Carpenter foreman

Weybridge Construction
12.2020 - Current

Carpenter foreman

Excalibur
11.2019 - 11.2020

Kitchen fitter

Crown Installations
10.2016 - 11.2019

Carpenter

Pathway Construction
07.2014 - 09.2016

Carpenter

A40 group
11.2013 - 07.2014

CARPENTER/JOINER

REWARD HOTEL PROJECTS
06.2013 - 10.2013

Carpenter

Self employed
07.2012 - 11.2012

NVQ Level 2 - Carpentry

Guildford
08.2006 - 04.2009

Carpenter

Burhill Properties Ltd
01.2005 - 01.2011

undefined

Rydens School
marcus slimane