Summary
Overview
Work History
Skills
Languages
Additional Information
Timeline
Generic
Luciano F. Robles Jara

Luciano F. Robles Jara

Wolsingham,Durham

Summary

Experienced Site Engineer able to manage multiple simultaneous responsibilities from enabling works to project completion, specialising in RC Frames, Groundworks, Slipform and Warehouses

Overview

4
4
years of professional experience

Work History

Site engineer

Peacock Precision Services Ltd
Carlisle, Cumbria - 150m
09.2024 - 01.2025

CSLR for Galliford Try

  • Street lighting: trenching for ducts, erecting light columns and setting covers. Positions and Levels setout and aslaid.
  • Soil testing: CBR's, NDT's, DCP's, pulverisation, soil & stone samples, Scalping, HSV's. Test locations setout, aslaid and logged in excel spreadsheets and drawn up on CAD.
  • Roads: Cambered dual carriageways, farm tracks and byways. Profiles pinned out for tarmac gangs, build ups checked.
  • Kerbs: critical pathway kerbs setout for roads and footpaths. Pin kerbs, HB's and Bullnoses.
  • Ponds: profiles pinned for earthworks subbies. revisited and checked.
  • Services: flagged or pinned for heights, trench depths checked, aslaid and drawn up.
  • Asbuilts drawn up and submitted weekly. Soil testing spreadsheets submitted daily.

Site Engineer

Winvic
Darlington, Durham - £90m
05.2024 - 08.2024
  • Drainage - Tubisidor attenuation system, Foul and Surface, French/Slot drain, Permavoid diffusers, Aco Kerbdrain, ACO Qmax, Interceptor tanks, Northumbrian water diversions, Kerb Gullies.
  • Piling - Vibro Stone Column piles
  • Foundations - Holding Down Bolts to receive UC beam warehouse structure
  • Kerbs - HB2, Bullnose, Pinkerbs, Splash courses, Aco Kerbdrain & gullies, Trief.
  • Services - Hydrant valves, Chambers, Gas and landlord kiosks, Lighting columns, Gas meters, Pump station, Sprinkler tank.

Site engineer - Slipform

Stephenson Group
Newcastle upon Tyne, Tyne and Wear - £155m
10.2023 - 05.2024
  • 2x 7-10 floor cores via Slipform.
  • Cast-in plates, Continuity bar, Penetrations.
  • Maintaining: accurate Datum and Slip Rig Verticality/Plumbness.
  • General Design Errors, Clash Detection and RFI's prior to commencing works onsite.
  • Creating Combined GA's and Elevation books on Excel.

Site Engineer

Summit Structures Ltd
London, Chiswick High Road - £6m
03.2022 - 08.2023
  • QA - Pre-pours, As-builts, Cubes & Log
  • Strengthening Works - Column plates, RC Walls and Infill Slabs, Core Partition Walls, Wall Thickenings, RC Beams, UC Beams
  • Drainage - Attenuation Tanks, Concrete Manholes, PPIC, Cast-in/External Yard Gullies.
  • RC Frames - 3x frames, 1x strengthening works to existing frame.
  • RFI's - multiple clashes in design dealt with to maintain programme.
  • Town Houses - Incoming Services, Foundation Beams/Toe, GF Slab.
  • Call Offs - Drainage, Formwork, Reinforcement, Concrete.
  • S50 Works - Drainage under street works, Build over agreement.
  • Party Wall Works - party wall award works from start to finish, trial holes, surveys, temp works design produced, liaising with party wall surveyor.
  • Temporary Works - installation, permit sign offs, permits to load.

Site Engineer

GCL
London, Clarendon Road, Wood Green - £20m
11.2020 - 03.2022
  • RC Frames - Precast: Verticals, Stairs & Landings, Schock balcony brackets, 8x frames 8-15 stories.
  • Basement - interlocking sheet piles, RC capping beams, Liner Walls, Contiguous/Secant piling, Water proofing.
  • Prefabbed Bathroom Pods .
  • S278 Works - Kerbs, Love-Benches, Podium Planters, Aco-channels, Road Build ups, Paving, Tarmac.
  • Cast-in Ancon Channels to 3mm tolerance

Skills

  • AutoCAD Civil 3D
  • Bluebeam
  • Office Suite
  • As-builds
  • Leica Total Station 06/07/09/16
  • Geo-Fennel FLP100 Plumbing Laser
  • Leica 620/600 Rugby Laser
  • Cut & Carve/New Builds
  • Basements
  • Call Offs
  • Strengthening Works
  • Temporary Works
  • Party Wall Works
  • S278 Works
  • S50 Works
  • Slipform
  • Warehouses
  • Leica Pipe Lasers
  • Gradient Lasers
  • Leica GPS Total Station
  • Roads
  • Street Lighting
  • Soil testing

Languages

English
Native language

Additional Information

  • CSCS (Red trainee card)
  • First Aid at Work Level 3
  • Fire Marshal
  • Level 6 NVQ in Engineering and Surveying (Training Towards)

Timeline

Site engineer

Peacock Precision Services Ltd
09.2024 - 01.2025

Site Engineer

Winvic
05.2024 - 08.2024

Site engineer - Slipform

Stephenson Group
10.2023 - 05.2024

Site Engineer

Summit Structures Ltd
03.2022 - 08.2023

Site Engineer

GCL
11.2020 - 03.2022
Luciano F. Robles Jara