Quick-thinking rigging professional with knowledge and experience to safely rig and move heavy loads. Attentive to critical details and versed in safety standards. Works great with others and completes projects on-time. Dedicated slinger with 7 years of experience. Demonstrated history of meeting company goals and promoting best practices. Thrives under pressure and adapts to challenges with ingenuity and resilience.
Overview
8
8
years of professional experience
Work history
Plumber
flame heating
london, City of London
Renovated building systems, improving drainage and disposal.
Participated and provided out of hours emergency services when necessary.
Cleaned and tidied work sites after job completion.
Measured, cut, bent and threaded piping into correct configurations.
Added sprinkler systems to new and existing constructions.
Worked with concrete and cast iron piping to form sewers, drains and water mains.
Diagnosed and repaired problems with household appliances connected to plumbing system.
Assembled piping systems for heating, ventilation and drainage needs.
Assessed pressures in piping using gauges, tests and observations.
Installed water supply systems, discharge pipes and sanitary fixtures.
a40 slinger/signaller all duties
jrl group, carty forde,careys london,toureen group
London, City of London
03.2018 - 03.2026
been working within the form work side of construction various different lifts from small to big scale loads within the region of 20 ton plus
lifting prefab steel rebar
jump forms also known as slipform which build lift shafts and stair courts. I've taken part making the slip forms as well as striking the slip forms
concrete pours which include slabs,columns,blinding etc
plenty of experience with concrete shutters and all aspects of the concrete form work for example precast columns, rebar, safety screens, compressors, jet washers, scaffolds the list goes on
I have also worked along side the domestic part of a construction site for example ply wood, timbers, plasterboards, boat skips, skips etc
work on hs2 ventilation shafts as well as the demolition part of the job where the d wall segments was cut down using a diamond band saw some segments weighed in the region of 15 tons all the way up to 34 tons huge segments
Education
GCSEs -
east barnet school
london
01/2004 - 02/2009
Skills
Loading and unloading
Load inspection
Special load rigging
Equipment operations
Timeline
a40 slinger/signaller all duties
jrl group, carty forde,careys london,toureen group