Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Kishan Singh Mohem

Bexleyheath,Kent

Summary

A highly motivated and skilled Concrete Finisher with over 15 years of hands-on experience in the construction and railway sectors. Demonstrates in-depth knowledge of concrete finishing techniques, surface preparation, formwork, and finishing tools. Known for working efficiently under pressure while maintaining high standards of quality and safety. Equally effective working independently or as part of a team, with strong communication and problem-solving abilities. Committed to delivering durable, precise, and professional finishes that meet or exceed client expectations.

Overview

18
18
years of professional experience

Work History

Concrete Finisher

McLaren Construction
, City of London
04.2025 - Current
  • Completing concrete finishing in £400 million refurbishment of Victoria office tower
  • Repaired damaged concretes surfaces to restore them to their original state.
  • Achieved smooth finish by applying, spreading, and shaping concrete mix.

Concrete Finisher

Knight Group
Barkingside, Redbridge
11.2024 - 03.2025
  • Produced high-quality finishes using a variety of hand and power tools.
  • Inspected finished concrete work, ensuring it met all quality standards set out by contractor and client.
  • Collaborated closely with other construction professionals such as architects, engineers, and electricians during projects.

Concrete finisher

Duffy Construction Ltd
Brentwood, Essex
05.2024 - 10.2024
  • Concrete finishing in £6.4 million school expansion
  • Educated clients about maintenance and upkeep of newly installed concrete structures.


  • Applied waterproofing and weather resistant layers to protect against erosion damage.

Concrete finisher

Bam & Ferrovial Construction
, Greenwich
02.2023 - 05.2024

Concrete finishing at Major tunnel river link crossing project (£1 Billion)

Work includes stand up walls and bridge deck concrete finish.

Concrete Finisher

Laing O'Rourke
, City of London
03.2016 - 02.2023
  • Concrete finishing at new development in central London.
  • Work included construction of lift shafts, retaining walls, columns and slabs.

Concrete finisher

Hoctiff/ Murphy Crossroail
, Plumstead
06.2012 - 03.2016
  • Concrete finishing at major Crossrail project
  • Works included construction of concrete box, track slab works and bridge deck concrete finish.


Concrete finisher

Bam Nuttals
, Neasden Depot
01.2012 - 06.2012

Concrete finishing at major LUL project.

Work included construction of maintenance pits, vehicle wash sidings and slab track.

Concrete Finisher

Bam Nuttals
, Tottenham Court Road
06.2011 - 01.2012
  • Concrete finishing at major LUL/ Crossrail project (£250m)
  • Work included reconstruction of the ticket hall , construction of concrete box, new escalator and Crossrail Eastern ticket hall.

Concrete finisher

Costain Power Plant
, Belverdere
01.2011 - 06.2011
  • Concrete finishing at major project for Cory environment.
  • Work included concrete finishing, final finish works, cleaning snags and mastic works.

Concrete finisher

Morgan Sindall
, Lee Tunnnel
08.2010 - 01.2011
  • Concrete finishing at major project for Thames Water (£400m)
  • Worked on site set up works for project including foundation work for offices, canteen and road ways.

Concrete finisher

BAM Nuttalls
, Olympic Park
07.2009 - 08.2010
  • Concrete finishing at Olympic Park, individual projects through all stages from conception to completion.
  • Work included road bridges, final finishing and mastic works.

Concrete finisher

Balfour Beatty
, East London Line
07.2008 - 07.2009
  • Concrete finishing at East London Line major project (£363m)
  • Work included track slab works, up stand walls and bridge deck concrete finish


Concrete finisher

MJ Gallagher
Ipswich Waterfront Apartments
09.2007 - 07.2008
  • Concrete finishing at new development at Ipswich
  • Work included construction of lift shafts, retaining walls, columns and slabs.

Education

A-Levels - English, Maths, Political Science & History

DAV College
Punjab, India

Skills

  • Concrete mixing & pouring
  • Formwork setup
  • Levelling & smoothing
  • Surface treatments
  • Concrete Repair
  • Blueprint reading
  • Understanding of Health & Safety Standards
  • Teamwork
  • Communication
  • Problem Solving
  • Time Management
  • Blue CSC card


Languages

Punjabi
Advanced

Timeline

Concrete Finisher

McLaren Construction
04.2025 - Current

Concrete Finisher

Knight Group
11.2024 - 03.2025

Concrete finisher

Duffy Construction Ltd
05.2024 - 10.2024

Concrete finisher

Bam & Ferrovial Construction
02.2023 - 05.2024

Concrete Finisher

Laing O'Rourke
03.2016 - 02.2023

Concrete finisher

Hoctiff/ Murphy Crossroail
06.2012 - 03.2016

Concrete finisher

Bam Nuttals
01.2012 - 06.2012

Concrete Finisher

Bam Nuttals
06.2011 - 01.2012

Concrete finisher

Costain Power Plant
01.2011 - 06.2011

Concrete finisher

Morgan Sindall
08.2010 - 01.2011

Concrete finisher

BAM Nuttalls
07.2009 - 08.2010

Concrete finisher

Balfour Beatty
07.2008 - 07.2009

Concrete finisher

MJ Gallagher
09.2007 - 07.2008

A-Levels - English, Maths, Political Science & History

DAV College
Kishan Singh Mohem