Kevin Samuels

London

Summary

Experienced Mechanical Supervisor and Time-Served Commercial & Domestic Mechanical Fitter with extensive expertise in plumbing, welding (MMA & TIG), and industrial gas installation.

Gas Safe registered for both domestic and commercial installations, with a strong background in renewable energy systems, including solar heating and ground source heat pumps.

Specialized in the installation and maintenance of commercial plant rooms, natural gas pipelines (above and below ground), and complex systems such as water harvesting, soil recycling plants, oil & steam, CHP systems, complex cooling system ex: Data Centre systems ( chilled water supply & Dx systems)

Adept at leading teams, managing large-scale projects, and ensuring compliance with safety and quality standards.

Highly skilled in troubleshooting, system design, and commissioning, with a proven track record in delivering high-quality results across a variety of mechanical and energy-related fields.

Overview

22
22
years of professional experience

Work History

Mechanical Supervisor

Datalec Ltd
09.2024 - 02.2025
  • Successfully led and supervised mechanical installation projects for high-profile clients, including commercial, industrial ensuring all systems were completed and to the highest standards.
  • Coordinated the installation and commissioning of complex mechanical systems (HVAC, plumbing, heating, and ventilation) for large-scale projects, such as Datalec Atlas- Edge Berlin contributing to successful project delivery.
  • Coordinated Diesel System Pipework from Basement Fuel Tank Rooms to Roof 4 x Generator , arranged delivery of 60,000 litre of diesel , worked with Italian Engineer speaking in Basic Italian to Build & commission and offer up for inspection to German TUV Authority Inspection and sign off .
  • Arrange the Crane Lift of 7 x Dry Air Cooler Unit ( DAC ) Up to Roof Level worked with engineer to pipe up and Filll with Glycol ,commission system .
  • Managed the Supervision of ventilation Ducting , Worked with Dutch Engineer to complete , Louvers Fire and Smoke Dampers ,PCZ , UPS Rooms , MSB Room , Data Hall Room , WC Block
  • Managed the Supervision of mechanical contractor do Chilled Water Pipework , Plant Room Chiller Unit , Riser , Roof Pipework Basement pipework to CRAH Unit , WC Toilet Block , AHU Pipework
  • Managed the Supervision of Mechanical Contractor doing DX pipework from Roof Condense Farm to Plant Room , Data Halls , MSB Room , UPS Rooms , Witness Pressure Testing & Commissioning .
  • Worked with Commissioning Engineer to Fill DAC Unit System with Glycol , flush chilled water System pipework , balancing & Regulating of valves controls , hand over job to BMS Engineer
  • Collaborated with client to coordination work programe,Site meeting and progress report
  • Assumed responsibility for other trades like CSA,Site logistics, Health & Safety meeting when other supervisor are on holiday on rotation.


Mechanical Contractor

ProServ Mechanical and Electrical Ltd
05.2024 - 07.2024
  • Installation of mechanical system in a events venue in Berlin Germany Podamaz Platz .
  • Installed systems for a commercial kitchen, WC block, two bars with sinks, and one accessible WC.
  • Collaborated with the site engineer and architect to address and resolve design issues
  • Coordinated the shipment of materials from the UK to Germany, handling customs procedures
  • Installation of 6 x 80 litre Hot Water .
  • Collaborated with the Electrical and Ventilation Engineers to assist in the commissioning process.
  • Coordinated with local German authorities to fulfill various job requirements
  • worked with Local German Authority to complete different part of job requirement

Mechanical Contractor

ProServ Mechanical and Electrical Ltd
01.2024 - 04.2024
  • Set up the site for two hotel locations on the same road in Shepherd’s Bush, Holland Road.
  • Organized a strip-out team to remove all redundant pipes and systems.
  • Assigned a plumbing team to install first-fix pipework for showers, WCs, radiators, and a new boiler room.
  • Calculated material and labor costs to prepare detailed repair estimates.
  • Ordered necessary repair parts promptly to avoid delays in the project and maintenance work.
  • Attended site meetings and conducted health and safety walkarounds.
  • Collaborated with architects and designers to resolve issues with pipe routes and areas where services didn't fit.
  • Successfully completed the first-fix pipework for all systems.

Director of KS Plumbing & Building Services Ltd

KS Plumbing & Building Services Ltd
09.2020 - 01.2024

As a skilled mechanical engineer, I was responsible for installing, maintaining, and repairing plumbing systems in residential, commercial, and industrial settings. My role involved working with a variety of pipe materials, troubleshooting plumbing issues, and ensuring all installations complied with building codes and safety regulations.

Additionally, I managed plumbing teams, supervised installation projects, and provided high-quality customer service.

Collaborate with engineers and construction teams to coordinate plumbing work on large-scale projects.

Successfully completed residential block 1st & 2nd Fix installation along with new Energy centre/ boiler room on time and within budget.

Successfully replaces steam boiler room and pipe work at St George's Hospital in South London.

Installed high-end fixtures and fittings for luxury residential properties in West London and surrounding areas, serving a diverse international clientele


Mechanical Supervisor

NG Bailey
09.2019 - 08.2020

Location:Ada Lovelace Highschool Ealing

  • Supervised a team of 22 engineers.
  • Installed Low Temperature Hot Water (CT/VT-LTHW) Centralized Heating and Ventilation Systems.
  • Managed domestic services installations.
  • Oversaw gas services installations in laboratories, plant rooms, and kitchens.
  • Led the installation of boosted cold water pump sets in tank rooms.
  • Supervised above-ground drainage installation (HDPE & SVP).
  • Conducted pressure testing for LTHW and domestic services.
  • Performed air testing for above-ground drainage systems.

Mechanical Superviosr

Lorne Stewart Plc
02.2019 - 08.2019

Location:Brentwood Borough Council

  • Managed a team of 25 engineers.
  • Oversaw the installation of the complete mechanical package.
  • Supervised the installation of ventilation ductwork.
  • Led the installation of air conditioning (A/C) systems.
  • Coordinated the installation of gas mains.
  • Managed the installation of Low Temperature Hot Water (LTHW) services.
  • Supervised the testing and commissioning of pipe services.


Mechanical Supervisor

HEES
04.2018 - 08.2018

Location: Hygiene and Environment Engineering Service West Thurrock, Grays -Proctor and Gamble

  • Supervised a team of 30 engineers.
  • Managed a $6 million project, delivering the product line service from Class 150 to Class 3000 in compliance with American standards.
  • Led the installation of commercial and semi-commercial plant room systems, including hygienic pipework (Sch 40 & 80), and carbon and stainless steel piping.
  • Oversaw the installation of various services, including hydrogen, nitrogen, barge air, 20-bar high-pressure air, city water, wash water, chilled water (CHW), tower water, hot water, soft water, waste water, and 15-bar high-pressure steam
  • Supervising the installation of service line for new conveyor belt for new product (Lenor Unstoppables Fresh)
  • Testing of all service line with Water or Air
  • Work alongside commissioning Engineering
  • Aftercare services provided for plant and equipment
  • Collaborated with Chinese and American engineers.

Mechanical Supervisor

GBE Service
12.2017 - 03.2018

Location: Farringdon Gold Sacs Building and 48 Cary Street Holborn/Multiplex

  • Supervised a team of 15 engineers in the building's sub-basement.
  • Managed the installation of the cooling tower, chilled water (CHW) plant room, and shell-and-core work.
  • Oversaw the installation of 10” gas pipes.
  • Led the construction of a gantry for mechanical services.
  • Supervised the first-fix installation in the plant room.
  • Coordinated the shell and core installation from the sub-basement to the roof across all building blocks.

Mechanical Manager

Axis Group UK
01.2017 - 11.2017

Location: Multiplex -London Grosvenor Square

  • Supervised a team of 30 engineers.
  • Oversaw the installation, ensuring it met high specifications using American standard waterworks, sanitary fittings, and Villeroy & Boch products.
  • Managed the shell-and-core installation for the building.
  • Supervised the installation of all above-ground soil and vent pipes.
  • Attended progress meetings and collaborated with designers to ensure project alignment.

Mechanical Supervisor

Global Environmental Ltd / Invicta
07.2016 - 01.2017
  • Supervised a team of 20 engineers.
  • Managed the decommissioning of two large commercial boilers and sub-plant rooms serving 120 flats in the Southwark Council Estate District Heating system.
  • Connected existing 6" trench power pipework to two 900kW temporary boilers to facilitate the installation of two new 1000kW commercial boilers, with black iron welded pipe installations according to modern schematic plant room dimensions (12m x 20m).
  • Supervised the installation of 20 meters of 6" welded black iron gas main.
  • Installed four hot water calorifiers, a plate heat exchanger, and a new LTHW pump in the sub-plant room connected to a block of flats.
  • Oversaw the installation of corridor pipework using HTA Durapipe.
  • Managed the installation of riser pipework using HTA plastic.
  • Decommissioned the temporary boilers and existing trench pipework, transferring them to the new trench power pipe district heating system and connecting them to the new plant room installation.

Mechanical Supervisor

Excelsior Services Residential & VinceConstruction
07.2015 - 06.2016

Client Life care residence

  • Completed the installation of all communal mechanical services, including the swimming pool, two service risers (from the lower ground floor to level 10), corridor services across both buildings, roof service pipework, plant room systems, solar services, CHP services, building generator pipework, and both domestic and commercial gas supply systems.
  • Managed subcontractors, including sprinkler, domestic and commercial plumbing, air conditioning engineers, and ventilation ducting engineers.
  • Oversaw the ordering and procurement of all materials required for mechanical services.
  • Supervised a team of 18 plumbers/pipefitters and handled tasks such as time sheet management and other administrative duties.
  • Successfully completed London’s first luxury retirement home project, valued between £650,000 and £2.9 million

Pipe Fitter Supervisor / Plumber

Various Employer
12.2002 - 06.2015

Companies:

  • Merit Merril - Harrods Builds Knighsbridge / Heathrow Airport
  • Murphy & Son
  • Bafour Beaty Engineer
  • Shepherd Engineer Services
  • CW Pipework Ltd
  • Spie Mattew Hall & MJN
  • Aquatic Centre Olympic Village
  • KPMG
  • Hill McGlynn
  • Gas Tech Solutions
  • G&H Building Services
  • Network Rail
  • CM/ Future Community College
  • Airedale/ Bull Management Ltd


Summary of Experience and Responsibilities:

Experienced Pipe Fitter Supervisor with extensive expertise in managing large-scale piping projects across various industries, including commercial, industrial, and high-end residential sectors. Skilled in overseeing the installation, maintenance, and upgrade of complex piping systems, including stainless steel, carbon, and large bore pipework. Proven ability to lead teams, coordinate with engineers, interpret technical drawings, and meet project deadlines to high industry standards.

Key Responsibilities:

  • Supervised the installation and upgrading of carbon and stainless-steel pipework for chilled water systems, cooling towers, and various mechanical systems.
  • Led teams in fabricating and welding pipework supports, brackets, and structures for high-level installations.
  • Coordinated with engineers and construction teams to interpret technical and ISO metric drawings for the successful execution of projects.
  • Oversaw the installation of large-bore pipework, including systems for HVAC, air handling units, and waste management.
  • Managed safety protocols and ensured compliance with building codes and industry standards.
  • Trained and mentored junior engineers and apprentices, improving team efficiency and performance.
  • Successfully completed projects such as large commercial data centers, leisure centers, airports, Hospitals, schools, pharmaceutical projects and high-end residential buildings, consistently meeting or exceeding client expectations and deadlines.

Notable Accomplishments:

  • Contributed to the successful completion of a £50 million recycling plant project.
  • Delivered projects ahead of schedule, such as the leisure center at Elephant & Castle and various commercial installations at high-profile locations like Heathrow and Knightsbridge.

Education

High School Diploma -

ECITB

Skills

  • Expertise in HVAC systems installation and maintenance
  • Equipment commissioning and calibration
  • Production scheduling and maintenance oversight
  • Safety training and implementation
  • Adherence to quality assurance standards
  • Inspection management and compliance
  • Machinery performance testing and troubleshooting
  • Accurate reporting and documentation management
  • Materials requisition and inventory control
  • Parts replacement and system upgrades
  • Proficiency in hydraulic systems
  • Mechanical troubleshooting and repair
  • Plant shutdown procedures and safety
  • Scheduled maintenance and system optimization
  • Maintenance coordination and scheduling
  • Safety process management and enforcement
  • Advanced welding techniques (MMA & TIG)
  • Mechanical supervision and commercial/domestic fitting
  • Expertise in plumbing systems installation and repair
  • Industrial gas installation (Gas Safe registered)
  • Renewable energy experience: Solar heating and ground source heat pumps
  • Specialized in commercial plant room installations
  • Natural gas pipeline installation (above and below ground)
  • Water harvesting systems and soil recycling plants
  • Experience with oil, steam systems, and CHP (Combined Heat and Power) systems

Languages

English
Native language
Italian
Intermediate
B1
German
Beginner
A1

Timeline

Mechanical Supervisor

Datalec Ltd
09.2024 - 02.2025

Mechanical Contractor

ProServ Mechanical and Electrical Ltd
05.2024 - 07.2024

Mechanical Contractor

ProServ Mechanical and Electrical Ltd
01.2024 - 04.2024

Director of KS Plumbing & Building Services Ltd

KS Plumbing & Building Services Ltd
09.2020 - 01.2024

Mechanical Supervisor

NG Bailey
09.2019 - 08.2020

Mechanical Superviosr

Lorne Stewart Plc
02.2019 - 08.2019

Mechanical Supervisor

HEES
04.2018 - 08.2018

Mechanical Supervisor

GBE Service
12.2017 - 03.2018

Mechanical Manager

Axis Group UK
01.2017 - 11.2017

Mechanical Supervisor

Global Environmental Ltd / Invicta
07.2016 - 01.2017

Mechanical Supervisor

Excelsior Services Residential & VinceConstruction
07.2015 - 06.2016

Pipe Fitter Supervisor / Plumber

Various Employer
12.2002 - 06.2015

High School Diploma -

ECITB
Kevin Samuels