Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Generic

Kevin Melville

Kirkcaldy,Fife

Summary

OPITO Level 3 Rigger/Banksman Slinger with deck foreman experience. Demonstrated success in shoreside operations, including beach cable pulls and cable loadouts, with experience in vertical transpooling for umbilical operations. Extensive offshore expertise in rigging and slinging for subsea power and fibre cable installations, particularly in wind farm projects across the UK and Europe. Proven ability to lead teams in high-pressure environments with strong mechanical knowledge and effective communication skills.

Overview

4
4
years of professional experience

Work History

DECK FOREMAN/RIGGER

BOSKALIS - Liverpool Bay
Liverpool
09.2026 - 09.2026
  • Deck foreman duties
  • Installation of concrete mattresses
  • Full demobilisation

Deck Foreman/Rigger

Boskalis - Liverpool Bay
07.2026 - 09.2026
  • Mobilisation of vessell for cable installation
  • Preparing vessell for cable installation
  • Cable loadout
  • Cable installation
  • Managing deck riggers on shift

Rigger/Slinger

TechnipFMC
Rosyth, Scotland
06.2026 - 07.2026
  • Transpooling umbilical operations
  • Vertical spooling from factory to vessel carousel
  • General lifting operations to mobilse vessel

Deck Foreman

Boskalis
Nordenham - Germany
05.2026 - 05.2026
  • Supported deck team riggers and external parties in completing tasks on vessel's deck.
  • Communicated with team regarding specific tasks needing completion.

Led deck crew during mobilisation of cable loadout.

DECK FOREMAN

Boskalis - Baltic Power OWF
12.2025 - 03.2026
  • Overseeing deck team, riggers, and third parties executing tasks on vessel's deck.
  • Communicated specific tasks to team members during meetings
  • Lead the deck crew during subsea cable installation; managing cps assemblies, cutting co assemblies and overboard deployment operations.
  • supervising equipment such as tensioners ensuring safety, conducting briefings and communicating with bridge to ensure cable lay safety.

rigger/paddler

Blue Offshore - Finland
11.2025 - 11.2025
  • Loading export cable for transportation to USA
  • Securing sea fastening

Rigger

Boskalis
Borkum OWF, Germany
09.2025 - 10.2025
  • Working on the Boka Ocean cable-laying vessel at the Bokrum Offshore Wind Farm.
  • Perform cable layout from quayside to vessel.
  • Duties include cable end preparation, cutting, and sealing. Assembling CPS systems for both power and fibre cable.
  • Proceed with cable installation and laying. Other duties include general deck duties, moving operations, and maintenance tasks.
  • Educating and mentoring colleagues.

Rigger

Briggs Marine - Tiree, Shetland.
06.2025 - 08.2025
  • Shore-end cable pulls Coll - Tiree, Shetland Mossbank - Yell
  • Mobilising and setting up the shore end for the cable pull.
  • Performing cable pulls.
  • Demobilising sites.

Rigger

Motive
Port of Blyth
06.2025 - 06.2025
  • Assisting and setting up tensioners and box rollers for cable transfer between tanks.
  • Completed transfer of cable.

Rigger

Briggs Marine
Port of Nigg
05.2025 - 06.2025
  • Assisting setting up queyside 15 tonne tensioners.
  • Assembling chute.
  • Laying highway of box rollers for cable loading from barge to queyside storage tank.

Rigger/Slinger

ARB Wind
02.2025 - 04.2025
  • Team lead, Directed team activities, maintaining focus on health and safety standards. Delegated tasks to complete lifing operations
  • Working on-board SOV Vestri Enabler on NNG Windfarm
  • Executed lifting operations between vessel and tower.
  • Removing back-up generators across NNG Site

RIGGER/SLINGER

Axess - Sofia Windfarm
11.2024 - 12.2024

Cable pull on Sofia Windfarm OCP Platform prepare winches and rigging for fibre cable pull and HV Cable pull

Strip cable and install hang off clamp

De-mobilisation of site

Rigger

Briggs Marine
, Orkney
07.2024 - 08.2024
  • Served as acting foreman during shoreside operations
  • Setting up winches, quadrants, box-rollers and other equipment for preparation of beach pull both ends for cable lay between Kirkwall and Shapinsay
  • Trenched and buried cables
  • Demobilise site.

Rigger

Motive Offshore
Hartlepool
06.2024 - 06.2024
  • Cable loadout from JDR factory
  • Assisting and setting up queyside equipment
  • Assisting loading cable onto barge for transportation.

Rigger/Paddler

Motive Offshore
Port of Blyth
04.2024 - 05.2024
  • Assisting setting up quayside equipment for unload of cable from ship to storage tanks, and then demobilise site.

RIGGER/SLINGER

ARB Wind - NNG windfarm
NNG Windfarm, Fife
02.2024 - 03.2024
  • Replacing alternators from generators on off shore wind farm, working aboard Vos Stone ship
  • Lifted and loaded goods using safe rigging and lashing techniques for secure equipment installations.
  • Attached pulleys and blocks to fixed overhead structures using bolts and clamps for secure rigs.

Rigger/slinger

Briggs Marine
Burntisland, Fife
01.2024 - 02.2024
  • Cable Scrappage from storage tanks and reels.

Rigger/Slinger

Deme
NNG offshore windfarm, East coast of scotland
09.2023 - 10.2023

Working onboard Viking Neptun

Cable installations across NNG windfarm

RIGGER

Briggs Marine - London array
London Array off shore windfarm
08.2023 - 08.2023
  • Mobilise NP459 barge in Rotterdam for cable replacement, removed and replaced CPS and cable from tower
  • Return to Rotterdam for demob of barge

RIGGER

Briggs Marine - Hartlepool
Hartlepool
07.2023 - 07.2023
  • Set up cable spooler and level winder. Set out roller boxes.
  • Load cable onto drum straight from factory
  • Transfer spooler and drum loaded with cable onboard ship

RIGGER

Briggs Marine - Orkney
01.2023 - 02.2023
  • Working as part of a team on MV Elektron preparing ship for cable lay, loading equipment.
  • Load vessel with sub sea cable
  • Assisting to lay cable from the ship to shore.

RIGGER

Briggs Marine - Ullapool
12.2022 - 12.2022
  • Working as part of a team on MV Elektron, preparing ship for cable lay, loading equipment and setting up equipment to prepare for cable lay
  • Load vessel with sub sea cable
  • Assisting to lay cable from the ship to shore.

RIGGER

Briggs Marine - Isle Of Mull
09.2022 - 11.2022
  • Working as part of a team on the shoreside, helping to set up equipment and prepare site for receiving sub-sea fibre and power cable installation.
  • Used proper rigging apparatus (chains, slings, , ropes) and techniques to perform safe and proper lifting.

Education

OPITO RIGGER COMPETENCE REASSESSMENT

Inter Training
Aberdeen
01-2026

OPITO BANKSMAN/SLINGER COMPETENCE REASSESSMENT

Inter Training
Aberdeen
01-2026

COLLE ACADEMY, B.V - 11/08/2026

POWERED ACCESS LICENCE FOR MOBILE BOOM (3B)

FIRST AID - GWO - PASS

Global Wind Technology - GWT
Glasgow
01-2025

WORKING AT HEIGHTS - GWO -

Global Wind Technology - GWT
Glasgow
01-2025

FIRE AWARENESS - GWO -

Global wind technology - GWT
Glasgow
01-2025

MANUAL HANDLING - GWO - PASS

Global Wind Technology - GWT
Glasgow
01-2025

OPITO LEVEL 3 - RIGGER

Inter-Training
Aberdeen
2024

OPITO LEVEL 3 - BANKSMAN/SLINGER

Inter-Training
Aberdeen
2024

PASS -

IOSH
2024 - 2024

OPITO BOSIET CA-EBS - PASS

CLYDE TRAINING SOLUTIONS
Glasgow
01-2023

Vehicle Builder Grade 1 -

Transbus International
Falkirk
01-2004

SEA SURVIVAL

GWO

Skills

  • Vehicle assembling and dismantling
  • Mechanical knowledge
  • Vehicle and machine maintenance
  • Large vehicle operating
  • Vehicle restoration

Additional Information

  • Bi-Deltoid measurement certificate, 46.9cm
  • Chester Step Test - Pass with above average 09/11/24
  • OG UK MEDICAL - Pass 10/06/26
  • Seamans Book
  • IMIST - 19/08/2026

Timeline

DECK FOREMAN/RIGGER

BOSKALIS - Liverpool Bay
09.2026 - 09.2026

Deck Foreman/Rigger

Boskalis - Liverpool Bay
07.2026 - 09.2026

Rigger/Slinger

TechnipFMC
06.2026 - 07.2026

Deck Foreman

Boskalis
05.2026 - 05.2026

DECK FOREMAN

Boskalis - Baltic Power OWF
12.2025 - 03.2026

rigger/paddler

Blue Offshore - Finland
11.2025 - 11.2025

Rigger

Boskalis
09.2025 - 10.2025

Rigger

Briggs Marine - Tiree, Shetland.
06.2025 - 08.2025

Rigger

Motive
06.2025 - 06.2025

Rigger

Briggs Marine
05.2025 - 06.2025

Rigger/Slinger

ARB Wind
02.2025 - 04.2025

RIGGER/SLINGER

Axess - Sofia Windfarm
11.2024 - 12.2024

Rigger

Briggs Marine
07.2024 - 08.2024

Rigger

Motive Offshore
06.2024 - 06.2024

Rigger/Paddler

Motive Offshore
04.2024 - 05.2024

RIGGER/SLINGER

ARB Wind - NNG windfarm
02.2024 - 03.2024

Rigger/slinger

Briggs Marine
01.2024 - 02.2024

Rigger/Slinger

Deme
09.2023 - 10.2023

RIGGER

Briggs Marine - London array
08.2023 - 08.2023

RIGGER

Briggs Marine - Hartlepool
07.2023 - 07.2023

RIGGER

Briggs Marine - Orkney
01.2023 - 02.2023

RIGGER

Briggs Marine - Ullapool
12.2022 - 12.2022

RIGGER

Briggs Marine - Isle Of Mull
09.2022 - 11.2022

SEA SURVIVAL

GWO

Vehicle Builder Grade 1 -

Transbus International

OPITO BOSIET CA-EBS - PASS

CLYDE TRAINING SOLUTIONS

PASS -

IOSH
2024 - 2024

MANUAL HANDLING - GWO - PASS

Global Wind Technology - GWT

FIRE AWARENESS - GWO -

Global wind technology - GWT

WORKING AT HEIGHTS - GWO -

Global Wind Technology - GWT

FIRST AID - GWO - PASS

Global Wind Technology - GWT

OPITO RIGGER COMPETENCE REASSESSMENT

Inter Training

OPITO BANKSMAN/SLINGER COMPETENCE REASSESSMENT

Inter Training

COLLE ACADEMY, B.V - 11/08/2026

POWERED ACCESS LICENCE FOR MOBILE BOOM (3B)

OPITO LEVEL 3 - RIGGER

Inter-Training

OPITO LEVEL 3 - BANKSMAN/SLINGER

Inter-Training
Kevin Melville