Summary
Overview
Work History
Education
Skills
Certification
Custom Section
Affiliations
Languages
Accomplishments
Additional Information
Timeline
Generic
Kamil Bello

Kamil Bello

loughborough,Leicestershire

Summary

PROFESSIONAL SUMMARY

Construction planning and project controls professional with a Bachelor of Architecture and an MSc in Project Management, combining technical design understanding with practical construction delivery experience across commercial, defence and high-rise developments. Skilled in supporting the development, maintenance and monitoring of logic-linked Primavera P6 programmes, including Level 2 integrated schedules, Level 3 control programmes and Level 4 lookaheads.

Brings a strong architectural and BIM/Revit background to construction planning, with the ability to interpret technical drawings, assess buildability, understand trade interfaces and identify design-information dependencies that can affect construction sequencing and programme milestones. Experienced in progress monitoring, critical path reviews, programme reporting, subcontractor coordination and NEC4 contract support using CEMAR. Holds SMSTS, CSCS Managers & Professionals and PRINCE2 Practitioner certifications, with an understanding of delay analysis, programme assurance and project controls.

Overview

1
1
Language
1
1
Certification
8
8
years of professional experience

Work History

Project Planner

Kier Construction Ltd
Loughborough
01.2024 - Current
  • KIER CONSTRUCTION LTD | Planning Engineer / Project Controls

Loughborough, UK | January 2024 – Present

Project Brief: Supporting planning and project controls across a £22M UK commercial and defence construction portfolio delivered under NEC4 contract conditions.

  • Develop and maintain logic-linked Level 3/4 Primavera P6 programmes, managing over 1,200 resource-loaded activities across three active project environments.
  • Build and manage programme WBS structures by building zone, trade and construction phase, integrating subcontractor programmes into the master schedule and monitoring progress against key milestones.
  • Apply architectural and construction knowledge to review drawings, assess buildability, validate construction sequences and challenge activity durations, methodologies and programme assumptions.
  • Undertake critical path, float and delay analysis, identifying programme risks, assessing the impact of design changes and late information, and recommending mitigation and recovery measures.
  • Prepare 4-week lookahead programmes and coordinate weekly progress reviews with five multi-trade subcontractor teams, resolving sequencing, access, logistics, material delivery and interface constraints.
  • Monitor site progress, analyse planned-versus-actual performance and produce fortnightly reports, S-curves and resource histograms using Excel, maintaining reliable programme and delay records in line with relevant SCL Delay Protocol recommendations.
  • Support NEC4 contract administration through CEMAR, providing programme evidence and time impact assessments for Early Warnings and Compensation Events, including as-planned versus as-built delay assessments.
  • Develop Power BI progress dashboards from P6 data and support tender/pre-construction planning through construction sequencing, duration assessments, resource productivity and logistics reviews.

Project Planner

Morr Professional Ltd
Midlands
11.2023 - 01.2024
  • Assisted the Senior Planner with critical path reviews, programme variance analysis and what-if scenario assessments, evaluating the potential impact of design changes and construction constraints on planned activities.
  • Prepared 4-week lookahead programmes for site teams, coordinating subcontractor activities, material deliveries, temporary works and site access requirements.
  • Maintained contract communications and change-control records through CEMAR, tracking Early Warnings, Compensation Events, submissions and contractual response deadlines under NEC4 procedures.
  • Updated progress records using daily site reports and subcontractor returns, helping maintain accurate programme records and identify causes of delay.
  • Assisted with planned-versus-actual performance reporting, including S-curves and CPI/SPI metrics, providing progress information to the Senior Planner and Project Manager.
  • Coordinated with subcontractors, design consultants and site teams to resolve programme interfaces, sequencing issues and delivery constraints.

Project Planner

Julius Berger
Abuja, Nigeria
01.2022 - 10.2023

Brief: Design-to-construction scheduling for multidisciplinary industrial plant developments (Water/Gas/Pet Drink facilities).

  • Managed regular schedule updates within Primavera P6 from design through to mechanical completion and final commissioning across civil, structural, and process MEP disciplines (380+ activities per project).
  • Optimized critical path logic pipelines under the direction of the Senior Planner to accelerate execution, supporting handovers 10 days ahead of target baselines and capturing £50,000 in operational cost avoidance.
  • Produced comprehensive architectural drawing layouts in AutoCAD and Revit, intentionally syncing design release packages with site installation logic to minimize on-site rework.
  • Monitored site progress through weekly visits, adjusting short-term look-ahead programs based on actual productivity rates and emerging constraints.

Graduate Architect / Site Coordinator

Cappa & D'Alberto Plc
Lagos, Nigeria
01.2019 - 12.2021

Project Brief : Multi-site high-end residential housing and regional infrastructure developments.

  • Produced comprehensive architectural drawing packages and coordinated technical design information across structural, civil, and MEP disciplines to ensure site readiness.
  • Assisted Senior Planners in translating architectural concepts and design logic into practical construction sequences, helping draft WBS frameworks and activity strings within Primavera P6.
  • Conducted daily site inspections to verify that physical construction progress accurately matched the design intent and master program parameters.
  • Tracked material procurement timelines, design release dates, and information required dates, compiling field data to support monthly S-curve progress updates.
  • Gained foundational on-site experience in traditional, reinforced concrete (RC), and masonry sequencing that underpins current capabilities in engineering logic and look-ahead planning.

Education

MSc Project Management (Merit) - Project Management

De Montfort University
Leicester, United Kingdom
2025

Bachelor of Architecture (B.Arch) - Architecture

Olabisi Onabanjo University
Ogun State, Nigeria
01.2022

Skills

  • BIM / Revit Coordination
  • AutoCAD (2D / 3D)
  • 4D Scheduling Concepts
  • Spatial Clash Detection
  • Construction Sequence Visualisation
  • Programme Development
  • Primavera P6 EPPM
  • MS Project
  • WBS / Activity Coding
  • Logic-Linked Baselines
  • Resource Loading & Duration Estimation
  • EVM (EV, PV, AC, CPI, SPI)
  • S-Curve Reporting
  • Resource Histograms
  • Variance Tracking
  • Progress Photography Integration
  • NEC3 / NEC4
  • CEMAR
  • Compensation Event Tracking
  • Change Control Documentation
  • Tender Programme Input
  • Architectural Drawing Interpretation
  • Design-to-Programme Alignment
  • Buildability Assessment
  • Method Statement Review
  • Excel (Pivot Tables, VLOOKUP, Dashboards)
  • PowerPoint
  • Primavera P6
  • Revit

Certification

  • PRINCE2 Practitioner & Foundation, PeopleCert
  • CSCS (Managers & Professionals)
  • APM Associate Member, Association for Project Management (APM)
  • SMSTS (Site Management Safety Training Scheme)
  • Advanced Primavera P6 Professional Development Course (6-Week Applied Training), True Troop Consulting
  • BIM Level 2 Coordination and Revit Professional Development
  • NEC3 / NEC4 Contract Awareness Training

Custom Section

True, Only city/state/country were explicitly provided in the resume. Street and ZIP were not present.

Affiliations

  • Association for Project Management (APM) - Associate Member
  • Royal Institute of British Architects (RIBA) - Associate (Architecture Background)

Languages

English
Advanced
C1

Accomplishments

  • Programme Tracking & Log Support: Maintained precise contemporaneous site logs and P6 schedule history in line with SCL Protocol recommendations, supporting the project team to cleanly document a 47-day timeline delay and recover an SPI of 0.83, mitigating potential £8,000/day Liquidated Damages (LD) exposure.
  • Schedule Optimisation: Supported completion of an infrastructure milestone 10 days ahead of target through critical path sequencing and close look-ahead monitoring, delivering £50,000 of schedule-related cost avoidance valued at £5,000/day.
  • Reporting Automation: Developed custom automated Power BI progress-tracking dashboards integrated with live P6 data exports, reducing weekly progress-reporting cycles by 2 days and eliminating manual tracking data entry gaps.
  • Risk & Delay Mitigation: Combined BIM/Revit model reviews with P6 schedule validation to expose 4 critical spatial sequencing conflicts in pre-construction, saving 2–3 weeks of site re-work and delay per package.

Additional Information

TECHNICAL SKILLS & EXPERTISE

  • Planning & Scheduling Tools: Primavera P6 EPPM, MS Project, Level 2/3/4 Schedules, WBS/OBS/CBS Hierarchies, Logic Linking, Activity Coding, 2/4-Week Site Look-Aheads.
  • Project Controls & Progress Tracking: Critical Path Method (CPM), Float Monitoring, Planned-vs-Actual Variance Analysis, Earned Value Management (EVM) Metrics, DCMA 14-Point Baseline Assessment, S-Curve & Histogram Reporting.
  • Programme Support & Change Tracking: SCL Delay Protocol Core Principles (Contemporaneous Records, EOT Tracking, Mitigation Documentation), Impact Analysis, Extension of Time (EOT) Administration Support.
  • Contracts & Site Administration: NEC3/NEC4 Framework Support, CEMAR Management, Early Warnings (EWN) Log Management, Compensation Events (CE) Support, Variation Tracking.
  • Site Delivery Coordination: RC Frame Construction, Deep Excavations & Foundations, Building Envelope/Cladding Interfaces, Multi-Trade Subcontractor Coordination, Offsite/Modular Construction, Materials Logistics.
  • Digital Construction & Design Coordination: BIM Level 2 Coordination, Revit/3D Model Navigation, Spatial Clash Detection, AutoCAD (2D/3D), Buildability Reviews.
  • Health, Safety & Quality Assurance: SMSTS Management Standards, CDM 2015 Awareness, RAMS Review, Defect Tracking, Snagging & Inspection Test Plans (ITP) Alignment.

Timeline

Project Planner

Kier Construction Ltd
01.2024 - Current

Project Planner

Morr Professional Ltd
11.2023 - 01.2024

Project Planner

Julius Berger
01.2022 - 10.2023

Graduate Architect / Site Coordinator

Cappa & D'Alberto Plc
01.2019 - 12.2021

MSc Project Management (Merit) - Project Management

De Montfort University

Bachelor of Architecture (B.Arch) - Architecture

Olabisi Onabanjo University
Kamil Bello