Javaid is a Chartered Civil Engineer and Fellow of the three professional bodies in the UK - ICE, CIHT and APM with over 30 years’ expertise in managing region and teams as well as delivery of major highways, rail and other multi-disciplinary (primarily mega size) infrastructure projects both in urban and rural environment ranging for example from major new High Speed Rail, new motorways (e.g. 156km, 6-lane toll) projects to widening/improvement projects in different regions and procured under different procurement methods e.g. D&B, DBFO under ECI / NEC and FIDIC etc. Javaid’s expertise includes supporting to manage business, preparing delivery strategies as well as managing programme deliveries in both design and construction, client management, tender designs including major bids, project/programme management, contract administration, commercial and claims management.
Arcadis UK and Middle East Regions (2013 to 2025)
Halcrow a CH2M HILL Company, U.K. – Senior Project Manager (2007 – 2013)
A45 Dual C'Way Diversion and Birmingham International Airport Runway Extension under Design & Build (D&B) NEC3:
A £65 million project. Leading Designer's Site Representatives (supervisor and coordinator) on site.
On the above Design and Build project responsibility include to ensure work is carried out in accordance with the contract and design/spec and any non-conformance reports are issued where work does not comply with. Issuing construction certificates for completed works to support the contractor's payment certificates. Also responsible to resolve day to day technical queries from the contractor and coordination with design and operations team plus other stakeholders and design change management/process etc. Coordination of H & S issues with CDM coordinator and information for H & S File. The project's key elements are:
2011 – 2012, New Providence Road Improvement Project (in Bahamas), Initially D&B and Later Awarded under FIDIC:
A $206 million. As a Project Manager and being Halcrow's primary point of contact with the Ministry of Works and Transportation (the Client) responsible for design delivery of 17 different roads. Some new single and dual carriageway links in rural as well as semi-urban areas while others involve improvement of purely existing urban areas road network. He also resolves day to day design issues as they arise during execution. He represents Halcrow at Project Meetings with the Client (up to the Prime Minister level), the Engineer, the (Argentinean) Contractor and other stake holders. Halcrow is the Designer for the scheme (17 different roads on the Island) with Mott MacDonald undertaking the role of the Engineer for the Ministry. The improvements include:
2009 – 2011, M25 Motorway Widening (DBFO):
A £6.2 billion project. He was the design review manager. Mainly his responsibilities (as part of Department Nominees Consultancy Support) include management of design reviews leading the specialists' team ensuring that the DBFO Co submissions meets the core requirements under the contract and any comments raised on the design review are implemented on site in accordance with contract.
2007 – 2009, Owen Street Relief Road (D&B):
A £18 million project. Design Coordinating Manager. On this multi-disciplinary project owned by multi clients (Network Rail and Sandwell Borough Council as main client) was mainly responsible to coordinate and resolve day to day design issues among the package managers and other parties (e.g. external cat-III checker). The scheme includes a new relief road 350m long passing through a new underbridge. This box structure (underbridge) was constructed off-line and then jacked under the West-coast main railway tracks in a 101-hour railway possession. This scheme also includes piled wall in both approaches of the underbridge, improvement of an existing pedestrian subway, partial demolition of existing (NR) Bridge 51, a new car park and a new retaining wall to the existing bridge over Birmingham canal. This was a Sandwell MBC and Network Rail funded scheme. The Scheme won the following awards.
Key Responsibilities:
Halcrow PAKISTAN – Project Manager / Resident Engineer
2003 – 2004
Key Responsibilities:
Bayindir Construction Inc., Pakistan – Senior Civil Engineer on Islamabad – Peshawar Motorway Project (156 km long with several junctions and emergency airstrip for Airforce jets) - (2000 - 2003)
Key Responsibilities:
Earlier Role:
Guerrino Pivato SpA-Pavital Engineering JV, Pakistan – Technical Manager / Technical Engineer – Highways (1996 – 2000)
Key Responsibilities:
· General project and financial management.
· Supervising/preparation/designing of all construction drawings involved in highway design using PROST and Eagle Point (Italian & American softwares for Highway Design Engineers) and AutoCAD.
REC Consulting Engineers, Architect & Planners – Graduate Engineer
1994 – 1996
Key Responsibilities:
· Worked on two bypass projects in Pakistan, assisted Senior Engineers with hor. & ver. alignment design in accordance with AASHTO standards using Eagle Point software.
· Improvements in drainage design generating surface modelling.