Innovative engineer specializing in complex problem-solving and project success. Led multiple initiatives that enhanced operational efficiency and decreased costs. Recognized for strong teamwork and leadership, consistently delivering high-quality results in challenging environments.
Overview
17
17
years of professional experience
10
10
years of post-secondary education
Work history
Cell Engineer
Welland Medical Ltd
Crawley, West Sussex
08.2011 - Current
Delivered cost-effective solutions for complex engineering problems helping boost KPI's.
Minimised safety risks with thorough inspections and maintenance schedules.
Optimised manufacturing processes, resulting in increased efficiency.
Improved product quality by creating detailed engineering drawings.
Coordinated with other engineers and professionals on large scale projects.
Created precise CAD models adhering strictly to industry standards.
Developed new mechanical systems to improve performance.
Managed multiple projects, ensuring timely completion and high-quality work.
Liaised with clients, understanding their needs and translating them into technical requirements.
Developed prototypes testing feasibility of new design concepts.
Resolved complex issues, applying troubleshooting and critical thinking to address numerous technical solutions.
Analysed engineering project feasibility to support management decision-making.
Advised on equipment failures and potential repairs to restore functionality.
Proposed engineering solutions to address project challenges and foster on-time completion.
Monitored KPIs and implemented swift change management to address potential delays.
Designed innovative engineering strategies for improved productivity.
Trained junior engineers and provided mentorship, enhancing their skill set and knowledge base.
Managed and executed engineering projects from conception to completion, adhering to strict timelines and budget constraints.
Drafted cost estimates detailing project requirements and expenditures.
Worked with manufacturing teams to address and resolve non-conformances.
Reported on metrics, analysing data to assess overall project performance.
Examined project plans and locations to identify and mitigate potential hazards.
Optimised workplace procedures for safety, developing and updating processes based on latest research.
Worked with production teams to facilitate smooth transition from design and testing to full-scale manufacturing.
Recommended improvements to optimise precise manufacturing processes.
Optimised production processes by applying lean manufacturing principles.
Advanced Knowledge of PLC Operations
Advanced Knowledge and Experience in Pneumatic and Hydraulic Operations
Moderate Knowledge of Frequency Welding, Extrusion and Moulding Technologies
Managed to optimize Auto 3 from 65% efficiency up to 95% using data analysis through use of Statistical Process Control
Project Managed and Primary Design engineer for Auto 4 Filter Weld station, designing robust and creative solution
Project managed Auto 1's Wafer weld redesign to help resolve ongoing weak weld issues as well as incorporating standardised parts for ease of stock management
Apprentice technician
King and Stevens
East Grinstead, West Sussex
09.2009 - 08.2011
Communicated effectively with team members, promoting collaboration and teamwork.
Followed instructions meticulously from supervisors, ensuring precise execution of tasks.
Facilitated routine maintenance checks with detailed documentation.
Developed proficiency in using technical tools, increasing effectiveness on the job.
Worked under pressure to meet tight deadlines.
Assisted senior technicians for improved workflow efficiency.
Adhered to company policies whilst performing daily tasks, maintaining professionalism at all times.