Summary

Seasoned in construction management with focus on site supervision. Capable of delivering safe, on-time, and under-budget projects through comprehensive knowledge of construction processes and leadership skills. Notable competence in team management, problem-solving and decision-making, fostering smooth project execution.

Overview

40
40
years of professional experience
5
5
years of post-secondary education

Work history

PMT E&I SITE SUPERINTENDENT

sub contracted to ARAMCO
DAMMAM K.S.A , eastern Provence
09.1999 - 08.2022

• Monitoring design, construction, commissioning and close out of upstream oil facilities including RTU, SSV, PDHMS, MPFM and all I-field instrumentation

• Khurais Mega Project monitoring the design, construction, pre-commissioning and commissioning of SR and all instrumentation as well as final close out of exception items and as-built drawings related to all gas wells and remote headers

• Harahd gas upstream PMT monitoring all instrument design, construction, commissioning and close out of all gas wells and remorse headers

• Hawiyah Gas Upstream project monitoring design, construction, close out of gas wells and remote headers to Hawiyah & Haradh Khuff gas Manifolds

• Southern Area Projects department, Uthmaniyah Gas Plant Projects Division. Work involved pre-commissioning loop checks to the Foxboro DCS and construction supervision, red lining of ILD’s. Close out of all exception items.

Work involved construction supervision, loop checks to the DCS, red lining ILD’s and close out of exception items.

SENIOR INSTRUMENTATION SUPERVISOR

sub consecrated to aramco
• Abqaiq, eastern province
09.1997 - 09.1999

• Abqaiq plants on the Shayba processing facilities, assisting with commissioning of new installations, doing loop check to the Fisher Provox DCS and as-builts of loop packages and final close out

• Riyadh Refinery Fire and Gas Safety Project, supervising a multinational team of technicians installing E.I.V’s and doing pre-commissioning loop check on all valves and final commissioning. Final as-builts of loop packages and close out of all exception items

• Abqaiq plants, supervising a multinational team of technicians upgrading Abqaiq plants to Fisher Provox DCS, troubleshooting on existing equipment, pre-commissioning activities and final commissioning of new installations, final as-builts and exception item close outIdentified potential risks and mitigated them through proactive measures.

  • Promoted a safe work environment by enforcing strict adherence to safety regulations.
  • Reduced workplace conflicts through effective communication and negotiation skills.
  • Led team meetings, ensured clear communication amongst all members.
  • Encouraged open dialogue amongst team members, promoted an inclusive work environment.
  • Delegated tasks appropriately, achieved balanced workload among team members.

INSTRUMENT TECHNICIAN

ISCOR
VANDERBIJLPARK, SOUTH AFRICA , vaal triangle
01.1983 - 03.1997
  • Completed a recognised apprenticeship as an Instrument technician in industrial instrumentation process and control, ten years plus experience in the iron and steel industry was obtained. Most aspects of instrumentation were worked on including Yokogawa DCS.
  • Adhered strictly to regulatory compliance whilst carrying out installation procedures.
  • Repaired faulty instruments to ensure smooth production processes.
  • Reduced equipment failures, thanks to regular servicing and troubleshooting.
  • Maintained rigorous health and safety practices for a safer work environment.
  • Collaborated with engineering teams in designing new systems optimising functionality.
  • Conducted functional checks on control valves improving performance reliability.
  • Regularly calibrated pressure transmitters which resulted in accurate readings.
  • Ensured proper functioning of all system components through systematic troubleshooting exercises.

Education

trade certificate - instrumentation posses control

national training bored of the man power act 1981
south africa
02.1982 - 11.1986

Timeline

PMT E&I SITE SUPERINTENDENT

sub contracted to ARAMCO
09.1999 - 08.2022

SENIOR INSTRUMENTATION SUPERVISOR

sub consecrated to aramco
09.1997 - 09.1999

INSTRUMENT TECHNICIAN

ISCOR
01.1983 - 03.1997

trade certificate - instrumentation posses control

national training bored of the man power act 1981
02.1982 - 11.1986
james lee