Construction professional prepared for high-stakes roles with extensive experience in overseeing multifaceted construction projects. Consistently ensures projects meet quality standards and deadlines, fostering collaborative work environment. Known for strong leadership, adaptability, and proficiency in project management and site supervision.
Key Contributions:
Responsibilities included coordinating and completing projects on time within the adjudicated budget and scope, overseeing all aspects of the on-site delivery of projects from the initial site setup through to snagging and handover, and considering each project's technical, commercial, design and build.
Monitored subcontractor operations and applied effective time, resource, and money management strategies to delivery under-budget project completion.
Projects History
Key Contributions
Projects history
This project involved completing all 12 months warranty defect works to obtain the final sign-off certificate at the end of the warranty period
The works included slab floor repairs, wall repairs, fire door remedial works, M&E, sprinkler system remedial, PV inverter replacements, road works, drainage excavation, and highway road repairs
Conducted meetings with clients on a daily basis to deliver information about project progress and quality.
The Project involved Photovoltaic installation with more than 9000 PV panels installed with East to West design and ballasted structure
The project involved in closing out 12 months of defect to achieve final end-of-defect certificate
This involves completing works such as internal floor slab repairs, M&E, BMS, fire alarm, sprinkler system, external road works, and various others and at the same time support the client needs in solving the problems incurred during all this time.
Led overall on-site project operations, involving ordering materials
The involved project was replacing specially designed/engineered AR (Amazon robotic) floorboards in the operational and storage areas while the floor was live and helping as an AR technician with Fast access training
This project involved civil work building additional carpark area and expanding the yard concrete slab
The project involved in closing out 12 months of defect to achieve final end-of-defect certificate
This involves completing works such as internal floor slab repairs, M&E, BMS, fire alarm, sprinkler system, external road works, and various others
This project involved managing the programmed works, such as the first and second fix works to offices, canteens, and toilets
While completing the main build, I was part of the aftercare team assigned to closed out all the defects raised during the 12-month warranty period and achieved the final certificate sign-off and support the client needs in solving the problems incurred during all this time
This project involved small electrical works and civil
drainage excavation to main entrance
This project involved general maintenance and accomplished a diverse range of responsibilities, containing plumbing, painting, gloss doors and frames, carpentry, and electrical works, dry liner and fixer, tape, and jointer
Controlled cost reducing site expenditures and operational expenses
Coordinated with the customer and suppliers as well as negotiated and implemented procedures to complete work within defined budget and time
Site Manager Safety Training Scheme ( SMSTS)
IOSH Managing Safely
CSCS manager's black card
First aider
Fire Marshal
Training in fulfillment and robotic Amazon technology