Summary
Overview
Work history
Education
Skills
Languages
Timeline
Generic

Ion Chelea

Luton,Bedfordshire

Summary

Accomplished professional with expertise in job site coordination and strong leadership, adept at managing contractor relations and ensuring quality control oversight. Demonstrates proficiency in scheduling workloads, leading crews, and maintaining time sheets, while excelling in site risk assessment and adaptable decision-making. Committed to enhancing project efficiency through effective machinery and equipment oversight, materials ordering, and a thorough understanding of project drawings.

Overview

19
19
years of professional experience

Work history

Foreman

Carney Construction Ltd
23 Wantage Rd, Reading RG30 2SH, Reading
2023.07 - Current
  • Oversaw compliance with health and safety legislation, reducing potential legal issues.
  • Collaborated effectively with subcontractors to ensure timely project completion.
  • Resolved conflicts amongst team members, promoting a harmonious work environment.
  • Allocated resources wisely to minimise waste.

Foreman

Addington (Formwork) LTD
Kiln Lane Easthampstead Road Bracknell, RG12 1NA, Berkshire
2020.01 - 2023.06
  • Reduced downtime through prompt resolution of issues.
  • Consistently upheld company policies reinforcing a professional work culture.
  • Coordinated logistics for efficient material delivery and storage.
  • Allocated resources wisely to minimise waste.
  • Collaborated effectively with subcontractors to ensure timely project completion.

Supervisor

Addington (Formwork)LTD
Kiln Lane Easthampstead Road Bracknell, RG12 1 NA, Berkshire
2015.05 - 2020.01
  • Monitored employee attendance records for maintaining discipline within the team.
  • Organised team resources, resulted in improved project timelines.
  • Implemented company policies effectively, maintained high standards of service delivery.
  • Ensured smooth operations with regular maintenance checks.

Carpenter/slinger signaller

Addington (Formwork)LTD
Kiln Lane Easthampstead Road Bracknell, RG12 1 NA, Berkshire
2012.03 - 2015.05

Carpenter

Addington (Formwork) LTD
Kiln Lane Easthampstead Road Bracknell, RG12 1 NA, Berkshire
2009.09 - 2012.03
  • Estimated material needs accurately; unnecessary costs avoided.
  • Coordinated with other construction professionals, promoting a collaborative working environment.
  • Enhanced safety measures by maintaining cleanliness and organisation of the work area.
  • Completed all carpentry works within stipulated timeframes; timely delivery ensured.

Carpenter Labourer

Addington (Formwork) Ltd
Kiln Lane Easthampstead Road Bracknell, RG12 1 NA, Berkshire
2007.04 - 2009.09
  • Adhered strictly to building codes during all carpentry works, ensuring compliance with regulations.
  • Followed detailed architectural drawings, resulting in precise construction projects.
  • Operated machinery safely according to the company's health and safety guidelines, reducing workplace accidents.
  • Mastered use of power tools to improve efficiency on job tasks.
  • Cut timber into designated sizes efficiently using saws, enhancing productivity.
  • Conducted regular equipment maintenance to ensure long-lasting performance.
  • Enhanced safety measures by maintaining cleanliness and organisation of the work area.

Labourer

Addington (Formwork) Ltd
Kiln Lane Easthampstead Road Bracknell, RG12 1NA, Berkshire
2006.10 - 2007.04
  • Worked efficiently under pressure resulting in consistent productivity despite tight schedules.
  • Showed punctuality and reliability, never missed a day of work.
  • Continually upheld high standards of workmanship within set deadlines.
  • Ensured tools were correctly maintained for optimal usage during projects.

Education

Occupational Work Supervisor Level 3 NVQ Diploma -

CSCS

Site Management Safety Training Scheme - Site Safety

CITB

Skills

  • Deadline adherence
  • Job site coordination
  • Site layout understanding
  • Adaptable decision-making
  • Scheduling workloads
  • Leading crews
  • Machinery and equipment oversight
  • Materials ordering
  • Project drawings understanding
  • Strong leadership
  • Contractor relations
  • Quality control oversight
  • Site risk assessment
  • Team motivation
  • Time sheet maintenance

Languages

Roamanian
Native
Russian
Fluent

Timeline

Foreman

Carney Construction Ltd
2023.07 - Current

Foreman

Addington (Formwork) LTD
2020.01 - 2023.06

Supervisor

Addington (Formwork)LTD
2015.05 - 2020.01

Carpenter/slinger signaller

Addington (Formwork)LTD
2012.03 - 2015.05

Carpenter

Addington (Formwork) LTD
2009.09 - 2012.03

Carpenter Labourer

Addington (Formwork) Ltd
2007.04 - 2009.09

Labourer

Addington (Formwork) Ltd
2006.10 - 2007.04

Occupational Work Supervisor Level 3 NVQ Diploma -

CSCS

Site Management Safety Training Scheme - Site Safety

CITB
Ion Chelea