Summary
Overview
Work history
Education
Skills
Timeline
Generic

Ian Kirby

Scarborough,NYK

Summary

Offering strong leadership and team coordination skills with knack for problem-solving and effective communication, strategic planning, and fostering team collaboration.

Overview

32
32
years of professional experience

Work history

Manager in charge

Babcock International Group
Scarborough, North Yorkshire
10.2017 - Current

When the contract was renewed in2017 I was asked to take over the management of the new Electrical Services contract which consists of maintaining data centres and the stores area.

  • Assisted in coordinating daily operations to ensure seamless workflow across departments.
  • Supported management in implementing new procedures to enhance efficiency and productivity.
  • Maintained accurate records and documentation to facilitate compliance with company policies.
  • Collaborated with team members to resolve issues and improve overall service delivery.
  • Participated in team meetings to discuss performance metrics and operational challenges.
  • Achieved high customer satisfaction with exceptional service standards.
  • Identified opportunities for operational improvements.
  • Initiated cost-saving measures without compromising on product quality or customer satisfaction .
  • Managed staff to improve overall productivity.
  • Oversaw compliance with health and safety regulations to maintain a secure working environment.

Facilities management electrician

Babcock International Group
Scarborough
05.2008 - 10.2017

The opportunity to work at this site was too good to pass it is fairly large and run by a small team, all aspects of the various equipment was maintained by ourselves with SME brought in for particular equipment. Over the years I took on various AP duties W@H, Confined Spaces, Low Voltage.

  • Oversaw compliance with safety regulations and environmental standards during facility operations.
  • Conducted regular inspections and assessments to identify areas for improvement within facilities.
  • Managed vendor relationships to facilitate timely procurement of necessary materials and services.
  • Led initiatives to optimise energy consumption and reduce operational costs within facilities.
  • Upheld high cleanliness standards through effective waste management practices,.
  • Developed preventative maintenance schedules, extending life of essential machinery,.
  • Performed risk assessments for potential threats within facility environment.
  • Improved building efficiency with proactive HVAC system maintenance.
  • Responded promptly to emergency situations, ensuring minimal disruption to operations.
  • Ensured regulatory compliance by maintaining up-to-date knowledge of relevant laws and standards.
  • Conducted safety audits to ensure compliance with health and safety regulations.
  • Delivered quality service by overseeing daily operations of facility effectively,.
  • Managed subcontractors for timely completion of repair works.
  • Decreased downtime with routine equipment inspections.
  • Maintained excellent working conditions through regular site inspections and repairs as needed,.
  • Increased quality with timely and accurate nonconformance troubleshooting.
  • Balanced environmental responsibility and budget parameters in selection of production materials.
  • Reduced overall waste and expenditures by applying lean manufacturing principles.
  • Coordinated labourers and suppliers to meet strict construction deadlines.

Electrical Technician

Erskine
Scarborough, North Yorkshire
03.2004 - 08.2008
  • After returning to Scarborough upon completion of the new Home office at the end of 2003 I began the role of mobile technician working country wide fitting 4G upgrades in base stations all around Britain
  • Installed and maintained electrical systems to ensure optimal functionality and compliance with safety regulations.
  • Diagnosed and repaired electrical faults, utilising advanced testing equipment to identify issues efficiently.
  • Documented service reports and maintenance logs to maintain accurate records of electrical work and compliance.
  • Installed new components for better system performance.
  • Troubleshot faults to guarantee reliable and safe electricity supply.
  • Ensured safety by adhering to standards and regulations in electrical installations.
  • Worked under strict deadlines to deliver top-notch results within set time frames.
  • Replaced defective components promptly, minimising system downtime.
  • Developed customised solutions for unique client requirements with the use of appropriate tools and equipment.
  • Tested electrical systems to ensure optimal performance.
  • Tested wiring and other system parts to determine electrical flow and optimal performance.
  • Selected and used wide range of electrical tools and equipment.
  • Worked safely at heights to minimise risk of personal injury.
  • Led team to deliver efficient maintenance and installations.
  • Installed and tested new equipment.
  • Gathered parts supplies and tools in preparation for each workday or new job.
  • Tested equipment and installations for compliance with electrical regulations.

BMS Installer

Self Employed
London , England
06.1993 - 12.2003
  • Started in 1993 working on the new Stevenage Pfizer R&D facility as the on site store-man recording equipment, moved on to assisting with installation of containment, cables and equipment Gaining experience over the years.
  • Maintained accurate documentation of installation processes and system configurations.
  • Managed equipment inventory and coordinated logistics for installation projects.
  • Followed established protocols, adhered to safety regulations at all times.
  • Checked all devices post-installation, ensuring optimal operation and customer satisfaction.
  • Used power and hand tools efficiently to expedite installation processes.
  • Ensured high-quality output with strict adherence to installation guidelines.
  • Worked collaboratively with other team members to achieve common installation goals.
  • Adapted to changing project requirements and deadlines.
  • Followed established installation procedures and protocols, adhering to safety and quality standards.
  • Guaranteed strict compliance with building codes, regulations and industry standards.
  • Ran cables to connect devices, equipment and power sources to newly installed systems.

Education

Some College (No Degree) - Maths,Eng Lit,Eng Lang,Geography,History,French

Saint Georges School
Hong Kong
09.1979

Skills

  • AUTHORISED PERSON LOW VOLTAGE
  • AUTHORISED PERSON WORKING AT HEIGHTS
  • IOSH MANAGING SAFELY
  • IOSH SUPERVISING SAFELY
  • MANAGEMENT OF HEIGHTS SAFETY COURSE
  • C&G LEVEL 3 2395 INSPECTION

VERIFICATION & TESTING OF ELECTRICAL SYSTEMS

  • LEVEL 3 BS7671 18TH EDITION PLUS AMENDMENT

Timeline

Manager in charge

Babcock International Group
10.2017 - Current

Facilities management electrician

Babcock International Group
05.2008 - 10.2017

Electrical Technician

Erskine
03.2004 - 08.2008

BMS Installer

Self Employed
06.1993 - 12.2003

Some College (No Degree) - Maths,Eng Lit,Eng Lang,Geography,History,French

Saint Georges School
Ian Kirby