Overview
Work history
Education
Languages
Timeline
Generic

Harjinder Singh

Willenhall,West Midland’s

Overview

19
19
years of professional experience

Work history

Dumer&roller and pipelayer and kerblayer

Fortel lTD
Walsall, West Midland’s
08.2023 - 03.2026
  • Collaborated effectively with other construction crew members, enabling successful completion of projects within stipulated timeframes.
  • Adhered to health and safety protocols to prevent accidents at work site.
  • Applied sealant to asphalt surfaces for increased longevity of roads.
  • Operated roller equipment to compress asphalt onto highways and driveways.
  • Achieved optimal asphalt placement for road construction projects.
  • Moved large quantities of earth and gravel using [Type] equipment.
  • Checked regularly the levelness of newly laid asphalt using specialised tools; this attention to detail helped maintain even surfaces.
  • Familiarised self with different soil types affecting compaction levels; this knowledge ensured better preparation before starting rolling operations.
  • Maintained high-quality results with steady handling of roller machinery.
  • Conducted daily inspections of machinery for optimised performance during operations.
  • Assisted in laying down asphalt, contributing towards efficient road building processes.
  • Ensured smooth operation by regularly maintaining and cleaning heavy machinery.
  • Followed precise instructions from supervisors, achieving desired results in pavement flattening tasks.
  • Utilised different types of rollers according to specific job requirements.
  • Filled potholes, resulting in safer driving conditions for motorists.
  • Coordinated with team members, ensuring seamless workflow on construction sites.
  • Upheld necessary communication with dump truck drivers when receiving loads of hot mix asphalt.
  • Dredged rocks, sand and waste from large bodies of water.
  • Utilised pile drivers in bridge, pier and large structure erections.
  • Flattened and prepped land using power roller machinery.
  • Employed [Type] machinery to dig sewers and drainage pipelines.
  • Erected timber, concrete and steel piles to construction specifications.
  • Compacted pavement and road foundations using pressure rollers.
  • Constructed quality road surfaces using bitumen dressings.
  • Serviced heavy duty construction machinery and equipment.
  • Laid concrete and surface foundations with care for smooth results.
  • Inspected sites to identify required construction preparations.
  • Handled and disposed of hazardous chemicals and goods correctly.
  • Maintained excellent physical fitness for manual labour and lifting.
  • Operated automated equipment to move and transport earth and rubble.
  • Performed minor mechanical repairs on roller machine as needed-maximising machine uptime and reducing delays in project timelines.
  • Improved safety standards with constant adherence to regulations and guidelines.
  • Worked on various construction sites, meeting project deadlines efficiently.
  • Demonstrated proficiency in operating both manual and automatic roller machines.
  • Drove construction vehicles safely for reduced site risk.
  • Used specialist excavation machinery to dig assigned site areas.
  • Dug trenches and ditches to exact instructions and specifications.
  • Monitored machinery performance to perform excavation tasks safely and accurately.
  • Levelled earth after excavation tasks ready for construction.
  • Handled bladed equipment responsibly to maintain good site safety.

Pipelayer and kerblayer

VGC
Ruislip, Middlesex
03.2022 - 07.2023
  • Worked in various weather conditions, demonstrating adaptability and resilience.
  • Improved site safety by strictly following all health and safety regulations.
  • Performed daily equipment checks, maintaining optimal performance levels.
  • Conducted routine maintenance on machinery to increase operational efficiency.
  • Excavated trenches according to blueprints for precise pipeline laying.
  • Installed complex piping systems to meet project specifications.
  • Ensured proper alignment and positioning of pipes during installation phase.
  • Managed debris and waste materials from job sites responsibly.
  • Identified potential issues via thorough equipment inspections, preventing downtime.
  • Checked installed pipelines using gauges or other testing equipment to ensure they meet specifications.
  • Connected pipes using welding techniques, ensuring sturdy infrastructure build-up.
  • Utilised heavy machinery to dig trenches for pipe installation.
  • Adhered to construction schedules, delivering tasks promptly without compromising quality standards.
  • Assisted in the development of project plans, contributing to overall success.
  • Liaised with team members for efficient workflow coordination.
  • Collaborated with contractors and site managers for seamless project execution.
  • Backfilled trenches after pipeline system completion, restoring work sites.
  • Prepared ground for pipelaying, ensuring a stable base for operations.
  • Repaired and replaced damaged pipelines, ensuring minimal disruption to services.
  • Ensured accurate placement of pipes with meticulous measuring techniques.
  • Used shovels, hole diggers and trenching equipment to complete manual site work.
  • Dug trenches and backfilled ground for pipe installation.
  • Mixed, poured and laid concrete slabs.
  • Set up protective barriers for secure construction work areas.
  • Wore appropriate safety equipment to reduce site risk.
  • Shovelled and spread materials for surface needs and subsurface support.
  • Transported construction materials and equipment safely and responsibly.
  • Managed materials movements using wheelbarrows, hand trucks and site equipment.
  • Operated jack-hammers to reduce sizes of large rocks and break up concrete.
  • Drove construction vehicles cautiously to site safety requirements.
  • Removed obstructions, debris and unwanted materials before civil construction work.
  • Coordinated construction work to meet project completion deadlines.
  • Confirmed correct road signage was in place and clearly visible.
  • Monitored drainage channels to identify and remedy issues quickly.
  • Inspected road condition to highlight required works.
  • Supported civil construction teams with adaptable labour for daily needs.
  • Assisted with construction, demolition and repair projects for important public resources.
  • Milled road surfaces to prepare for dressing works.
  • Completed routine maintenance on [Type] structures and support.
  • Checked construction supplies met quantity and quality requirements.

Dumperand roller driver

Fortel ltd
Walsall, West Midland’s
03.2016 - 03.2022

Sumer &roller driver

Milestone l t d
Gravesend, Kent
03.2014 - 02.2016

Groundworker kerblayer. Concrete finishing

– Qube Construction Management Services LTD,
Rochester, kent
11.2013 - 04.2014

Concrete Finishing and Ground Civil Worker.

TAG
Gravesnd, Kent
03.2013 - 10.2013

Concrete Finishing and Ground Civil Worker.

J Johal Construction LTD,
Gravesend, Kent
02.2011 - 03.2013

Position - Grade 3 general operative on phase 2 &

– CB & Isle of Grain LNG Expansion Project Kent.
Rochester, Kent
10.2007 - 10.2010
  • Adhered to health and safety procedures whilst carrying out tasks.
  • Increased safety awareness by conducting regular checks and inspections.
  • Collaborated with colleagues for better project outcomes.
  • Loaded and unloaded materials safely, ensured proper storage within the warehouse facility.
  • Facilitated smooth operations by promptly reporting any machinery faults or malfunctions.
  • Improved operational efficiency with strict adherence to guidelines.
  • Contributed ideas during team meetings that led to process improvements.
  • Fulfilled all assigned tasks within set deadlines, drove project progress.
  • Operated heavy machinery following safety regulations, promoted a safe work environment.
  • Performed routine maintenance tasks, reduced machine downtime.
  • Handled packaging and shipping duties efficiently for timely deliveries.
  • Managed team communication, improved workflow efficiency.
  • Promoted a positive work environment by handling conflicts effectively.
  • Streamlined logistics processes to improve delivery timescales.
  • Followed company protocols to ensure quality standards were met.
  • Attended training sessions regularly to update job-related skills.
  • Kept accurate records of goods received and dispatched, maintained high level of stock accuracy.
  • Ensured clean and organised workspace to enhance productivity.
  • Conducted minor repairs on equipment, extended their service life.
  • Assisted in inventory control, minimised material wastage.
  • Kept clean working areas for safe, productive warehouse environments.
  • Worked part of fast-paced production line, continually achieving targets.
  • Picked and packed with speed and precision.
  • Followed production guidelines and specifications to produce quality products.
  • Performed quality control to confirm finished products met production standards
  • Collaborated with team to streamline workflows and enhance overall productivity.
  • Assembled products with precision to meet quality standards within agreed timeframes.
  • Responded promptly to work orders and production schedules for timely task completion
  • Moved or rearranged stock manually or with aid of special equipment.
  • Assisted in training new operatives to help integrate into team.
  • Monitored assembly line and removed damaged products.
  • Set up production equipment and supplies before executing job orders.
  • Maximised productivity with proactive planning.
  • Loaded and organised goods onto trucks for shipping.
  • Coordinated with maintenance teams to promptly resolve equipment breakdowns.
  • Used resources responsibly and controlled expenses to meet budgetary controls.
  • Stored raw materials and finished goods in designated areas to minimise damage.
  • Measured, graded and fed raw materials into machinery
  • Made necessary adjustments on production equipment based on production requirements.
  • Setup and reconfigured production lines for optimal resource use.
  • Reported any accidents, incidents or near misses occurring in workplace during shift.
  • Set up machines to perform specific tasks to high quality.
  • Evaluated quality of products on production line through visual inspections.
  • Removed and appropriately stored processed workpieces.
  • Measured and kept records of manufactured products.
  • Read standard blueprints to understand production processes and product specifications.
  • Tended to machines to maintain fast-paced production in line with quality standards.
  • Troubleshot recurring machine issues to locate and resolve root cause.
  • Supplied machines with tools in appropriate quantities.
  • Checked quality of raw materials to aid quality assurance procedures.
  • Manipulated materials to meet desired standards.
  • Observed automated machinery, adjusting controls as necessary.
  • Disposed of cutting waste material for clean and tidy work spaces.
  • Maintained [Type] machinery in good working condition to avoid malfunctions.
  • Inspected machine output to assess conformity to specifications.
  • Referred to technical resources to understand established procedure, product specifications and machine controls.
  • Applied protective layer to protect surfaces from damage.
  • Regulated machine controls to meet strict specifications governing characteristic of output.
  • Operated machines to carry out [Type] operations.
  • Monitored machines to detect malfunctions, bottlenecks or damage.
  • Attended callouts for machine maintenance and repair work to resolve malfunctions quickly.

Kerblayer & pipelayer

JJ, Coughlan
Romford
01.2007 - 10.2007

Education

A-Levels - English, Maths, History, Geography, And Politics

RK. AYAR COLLEGE PUNJAB INDIA
Nawanshahar
06.1987

Languages

Punjabi
Beginner
A1

Timeline

Dumer&roller and pipelayer and kerblayer

Fortel lTD
08.2023 - 03.2026

Pipelayer and kerblayer

VGC
03.2022 - 07.2023

Dumperand roller driver

Fortel ltd
03.2016 - 03.2022

Sumer &roller driver

Milestone l t d
03.2014 - 02.2016

Groundworker kerblayer. Concrete finishing

– Qube Construction Management Services LTD,
11.2013 - 04.2014

Concrete Finishing and Ground Civil Worker.

TAG
03.2013 - 10.2013

Concrete Finishing and Ground Civil Worker.

J Johal Construction LTD,
02.2011 - 03.2013

Position - Grade 3 general operative on phase 2 &

– CB & Isle of Grain LNG Expansion Project Kent.
10.2007 - 10.2010

Kerblayer & pipelayer

JJ, Coughlan
01.2007 - 10.2007

A-Levels - English, Maths, History, Geography, And Politics

RK. AYAR COLLEGE PUNJAB INDIA
Harjinder Singh